Professional Documents
Culture Documents
SCHEDULE OF SWITCHES (FIRST FLOOR) SCHEDULE OF SWITCHES (FIRST FLOOR) NO DIMENSIONS TO BE SCALED OFF FROM DRAWINGS ONLY WRITTEN DIMENSIONS TO BE FOLLOWED
IN THE EVENT OF ANY DISCREPANCIES OR DIFFERENCE BETWEEN ANY ARCHITECTURAL DRAWINGS AND STRUCTURAL
DRAWINGS OR OTHER ENGINEERING DRAWINGS OR SITE CONDITIONS OR OTHERWISE IMMEDIATE REFERENCE IS TO
BE MADE TO THE CONSULTANT ARCHITECT FOR CLARIFICATION PRIOR TO EXECUTION OF WORK AT SITE
FOR SIZES, DEPTHS, WIDTHS, REINFORCEMENT DETAILS, CONCRETE GRADE OR ANY OTHER INFORMATION PERTAINING
SW2 01,02,02a 46,47,48,49 SW6a 25 TO FOUNDATIONS, COLUMNS, BEAMS, SLABS OR ANY OTHER STRUCTURAL COMPONENT, THE PROJECT ENGINEER'S
STRUCTURAL DETAILS AND OTHER INSTRUCTIONS SHOULD BE FOLLOWED WITH THE WRITTEN APPROVAL OF THE
CONSULTANT ARCHITECT AS TO ITS CO-RELATIONSHIP WITH THE ARCHITECTURAL DRAWINGS, WHENEVER A DISPUTE
NS NS NS OR DISCREPANCY MAY ARISE OR COULD EVENTUALLY ARISE.
SW5a 17 SW11 22
NS NS
SW6 12,13
NS
eq eq eq eq
eq eq eq eq
CEILING
LAYOUT
06a
REFER
1000
800
LED STRIP LIGHT WITH CONCEALED TRANSFORMER 16
eq
eq
eq
eq
eq
eq
eq
DL(R) 2 DL(R) 1
eq
DL(R) 1 DL(R) 1 DL(R) 1 DL(R) 1 DL(R) 1 DL(R) 1 SW-05a DL(R) 1
DL(R) 1 DL(R) 1 DL(R) 1 DL(R) 1
DL(R) 1 DL(R) 1 DL(R) 1
300
eq
eq
EF
eq
eq
eq
eq
eq
150
EF DL(R) 1 17
eq
11 DL(R) 1 SW-10
20
EF 07 08 09 10
eq
15
eq
eq
DL(R) 2
eq
eq
eq
eq
eq
DL(R) 1 DL(R) 1 DL(R) 1 DL(R) 1 DL(R) 1 DL(R) 1
DL(R) 1 DL(R) 1 DL(R) 1 DL(R) 1 DL(R) 1 eq eq
eq
03 SW-11
eq
150
eq
eq eq
eq
eq
eq
eq
eq
eq
SW-03
eq
975 1200 1200 1200 1200 975
600
DL(R) 1
600
eq eq eq eq eq eq eq eq eq eq SW-05
300 DL(R) 1 DL(R) 1
SW-02
eq eq 22
300
eq eq
eq
LED STRIP LIGHT WITH CONCEALED TRANSFORMER 300
eq
DL(R) 1 DL(R) 1
eq
SW-06 21
300
SW-06a
eq
eq
800 02a
24
02 25
eq
eq
800
eq
06 DL(R) 1
DL(R) 1 DL(R) 1
eq
eq
12 13
1450 3600 3600 5000 3000
eq
37
eq
eq
eq
eq
eq eq eq eq eq eq eq eq
DL(R) 1 DL(R) 1
44a 41a 28
eq
2400 2400 2400 850
eq
eq
SW-04
DL(R) 1 eq eq eq eq 30
1750
1900
1200
1200
1200
01
eq
150
eq
eq
eq eq SW-07
CSP 1 CSP 1 CSP 1 CSP 1 38 CSP 1 CSP 1
1200
1200
1200
eq
1750
1750
1750
27
150
DL(R) 1 DL(R) 1
eq
32
1750
29 SW-08
CSP 1 CSP 1 CSP 1 CSP 1 CSP 1 CSP 1
31 EF
1200
1200
1200
eq eq eq eq UDL 1 ML DL(R) 2
eq
05
33
CHDL 46 43 42 40
45 CSP 1 CSP 1 CSP 1 CSP 1 CSP 1 CSP 1
1750
1750
1750
1750
eq
1200
1200
1200
1750
39
30a ML DL(R) 2
eq
DL(R) 1 35
DL(R) 1 CSP 1 CSP 1 CSP 1 CSP 1 DL(R) 1 DL(R) 1 CSP 1 CSP 1 SW-09 34 EF
1200
1200
1200
150
DL(R) 2
1750
1750
1750
1750
eq
1350
eq
36
UDL 1
LIGHT POINT FOR CSP 1 CSP 1 CSP 1 CSP 1 eq eq eq eq
CSP 1 CSP 1
eq eq 2050 3000 950 1000 1200 1800 1050 1000 1050 2028 850 1000 1050 1800
NAME BOARD eq eq
02a
UDL 1 UDL 1 UDL 1 UDL 1 UDL 1 UDL 1 UDL 1
eq
47
DL(R) 1 DL(R) 1
49 50
eq
Xref ..\01. FLOOR PLAN\Floor Plan.dwg
WSP WSP 48 WSP WSP WSP WSP
FIRST FLOOR
3 1 1 / 1 0 , N E W K A N D Y R O A D , M A L A B E
AND HR OFFICE - SEEDUWA ELECTRICAL LIGHTING LAYOUT CHECKED BY DRG NO DATE
TEL : +94112413446 / +94718175652 / +94785434353 E mail : macwa.architects@gmail.com
SUB TITLE; APPROVED BY JOB NO SHEET SIZE & NO
THIS DRAWING IS THE PROPERTY OF THE AUTHORS AND SHOULD NOT BE USED OR REPRODUCED WITHOUT THE PRIOR WRITTEN CONSENT OF THE ARCHITECT /STRUCTURAL ENGINEER
FIRST FLOOR