You are on page 1of 2

Shading Report

produced by mohamad hamze

Design 1 doueir pit, doueir


 Shading Heatmap

2,131, (100%)

1,971, (93%)

1,811, (85%)

1,652, (77%)

1,492, (70%)

 Shading by Field Segment

Description Tilt Azimuth Modules Nameplate Shaded Irradiance AC Energy TOF2 Solar Access Avg TSRF 2
Field Segment 1 30.0° 165.0° 450 247.5 kWp 1,912.2kWh/m2 401.7 MWh1 99.6% 90.1% 89.7%
Totals, weighted by kWp 450 247.5 kWp 1,912.2kWh/m2 401.7 MWh 99.6% 90.1% 89.7%
1approximate, varies based on inverter performance
2 based on location Optimal POA Irradiance of 2,131.2kWh/m2
at 29.8° tilt and 183.7° azimuth

 Solar Access by Month

Description jan feb mar apr may jun jul aug sep oct nov dec
Field Segment 1 76% 84% 91% 95% 96% 96% 96% 96% 94% 85% 76% 75%
Solar Access, weighted by kWp 76.2% 84.0% 91.3% 95.3% 95.9% 96.2% 96.2% 96.3% 93.9% 85.2% 76.2% 74.8%
AC Power (kWh) 19,868.0 22,853.5 35,179.9 36,453.4 42,399.1 42,525.5 43,211.4 43,975.9 38,785.2 33,804.7 23,734.7 18,869.9

© 2022 Aurora Solar 1/2 October 22, 2022


Shading Report
produced by mohamad hamze

 Monthly Production  Sources of System Loss

60k
AC System:
System: 0.5%
Inverters: 1.5%
Inverters:

Clipping: 0.0%
Clipping:
40k
Wiring: 0.3%
Wiring: Shading: 9.9%
Shading:
kWh

Mismatch: 4.6%
Mismatch:

20k

Temperature: 4.3%
Temperature:

Irradiance: 0.4%
Irradiance:
0 Reflection:
Reflection: 2.7%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Soiling
Soiling:: 2.0%

 Southeastern Angle

© 2022 Aurora Solar 2/2 October 22, 2022