Annual Production Report produced by Tayyaba Mehmood

fincera Fincera, CCA, 131, Sector CCA Dha Phase 4, Lahore, Punjab 54792
 Report  System Metrics  Project Location

Project Design fincera


Fincera
Name
Module DC
Project CCA, 131, Sector CCA Dha Phase 4, Lahore, 52.7 kW
Nameplate
Address Punjab 54792
Inverter AC 60.0 kW
Prepared Tayyaba Mehmood Nameplate Load Ratio: 0.88
By taibamalik457@gmail.com
Annual
74.17 MWh
Production

Performance
80.2%
Ratio

kWh/kWp 1,408.7

TMY, 10km Grid, meteonorm


Weather Dataset
(meteonorm)

a54221b52c-82e323475c-37a93fd6dd-
Simulator Version
9149675113

 Monthly Production  Sources of System Loss

10k
AC System:
System: 0.0% Shading: 0.0%
Shading:

Inverters: 1.9%
Inverters: Reflection: 3.8%
Reflection:
7.5k
Clipping: 0.0%
Clipping:

Wiring: 0.3%
Wiring:
kWh

5k Soiling: 2.0%
Soiling:
Mismatch: 3.3%
Mismatch:

Irradiance: 0.5%
Irradiance:
2.5k

0
Temperature: 9.6%
Temperature:
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

© 2024 Aurora Solar 1/3 February 28, 2024


Annual Production Report produced by Tayyaba Mehmood

 Annual Production  Condition Set


Description Output % Delta Description Condition Set 1
Annual Global Horizontal Irradiance 1,719.4 Weather Dataset TMY, 10km Grid, meteonorm (meteonorm)
POA Irradiance 1,756.8 2.2%
Solar Angle Location Meteo Lat/Lng
Irradiance Shaded Irradiance 1,756.8 0.0%
(kWh/m2) Transposition Model Perez Model
Irradiance after Reflection 1,690.2 -3.8%
Irradiance after Soiling 1,656.4 -2.0% Temperature Model Sandia Model
Total Collector Irradiance 1,656.4 0.0% Rack Type a b Temperature Delta
Nameplate 87,206.0 Fixed Tilt -3.56 -0.075 3°C
Output at Irradiance Levels 86,786.2 -0.5% Temperature Model
Parameters Flush Mount -2.81 -0.0455 0°C
Output at Cell Temperature Derate 78,435.7 -9.6% East-West -3.56 -0.075 3°C
Energy Output After Mismatch 75,884.0 -3.3% Carport -3.56 -0.075 3°C
(kWh) Optimal DC Output 75,627.2 -0.3%
J F M A M J J A S O N D
Constrained DC Output 75,627.1 0.0% Soiling (%)
2 2 2 2 2 2 2 2 2 2 2 2
Inverter Output 74,190.2 -1.9%
Irradiation Variance 5%
Energy to Grid 74,167.0 0.0%
Temperature Metrics Cell Temperature Spread 4° C

Avg. Operating Ambient Temp 26.8 °C Module Binning Range -2.5% to 2.5%
Avg. Operating Cell Temp 46.2 °C AC System Derate 0.50%
Simulation Metrics Uploaded
Module Characterization
Operating Hours 4544 By
Module Characterizations
Solved Hours 4544 LR5-72HGD-585M Spec Sheet
HelioScope
(Longi) Characterization, PAN
Component Device Uploaded By Characterization
Characterizations S5-GR3P20K (400V) (Solis) HelioScope Spec Sheet

 Components  Wiring Zones

Component Name Count Description Combiner Poles String Size Stringing Strategy
Inverters S5-GR3P20K (400V) (Solis) 3 (60.0 kW) Wiring Zone 12 4-18 Along Racking
AC Home
25 mm2 (Copper) 3 (103.5 m)
Runs
 Field Segments
Home Runs 6 mm2 (Copper) 3 (28.0 m)
Intrarow Frame
Description Racking Orientation Tilt Azimuth Frames Modules Power
Combiners 2 input Combiner 3 Spacing Size
Strings 6 mm2 (Copper) 6 (68.4 m) Field Segment Flush Landscape 52.7
3° 180° 0.0 m 1x1 90 90
15 Mount (Horizontal) kW
Longi, LR5-72HGD-585M 90 (52.7
Module
(585W) kW)

© 2024 Aurora Solar 2/3 February 28, 2024


Annual Production Report produced by Tayyaba Mehmood

 Detailed Layout

© 2024 Aurora Solar 3/3 February 28, 2024