2 VO-002 Revised Design Apron Floodlighting System 11/7/2017 Pk.B/17/112 a Submitted 10/Apr/2018 HAC/ENG/COR/0327 (50,870,611) (73,426,120) 76,506,912.00 71,884,767.00 MEP 15
4
VO-004 Installation of Control Cable 2018/01/09 EI-AGW-032-A
a Deleted - - - - MEP
[CANCELLED] 2018/03/08 EI-AGW-061-A
2018/02/18 EI-GM-011-A
8 VO-008 Security Hut a Submitted 13/Aug/2020 HAC/ENG/COR/1463 - - 149,209.00 972,935.00 Civil 2
2018/06/02 COR-0376
13/10/2017 EI-PW-028-A
12 VO012 Relocation of MV Cables a Working On - - - MEP
13/11/2018 COR-0577
Review Under
15 3 VO015 Concrete Base under Security Fence 5/4/2018 EI-CW-077-A a Submitted 18/Jun/2020 HAC/ENG/COR/1389 - - 145,855.00 953,969.00 135,670.00 887,361.00 Civil 1 PMU
16 VO016 Power Supply for Taxiing Guidance Sign 5/23/2018 EI-AGW-074-A a working on MEP
20
VO020 New Intermediate Connection Point for AGL CMS 7/10/2018 EI-AGW-091-A a
Already covered
MEP
and other within VO 76
Pages 1 of 5
2/2/2021
21-1
VO021 Modification and Revision related to 04 AFL 6/30/2017 EI-AGW/PW-006-A a Deleted - - - - MEP
Substation [CANCELLED]
Review Under
22 2 VO022 Revised drain type for SD-03 and SD-04 8/3/2018 EI-AGW-094-A a Submitted 29/May/2020 HAC/ENG/COR/1350 - - 6,389,600.00 689,220.00 6,499,820.00 768,327.00 Civil 1 PMU
Already covered by
23 VO023 Installation of Taxiway Edge Lights 8/9/2018 EI-AGW-095-A a MEP
VO 53 and VO 62
No cost impact to
25 VO025 Work Direction for PCCP at Apron E 8/23/2018 EI-CW-079-A a Civil
raise the Proposal
26
VO026/CL FEP Pipes & Accessories 9/14/2018 Pk.B/18/292 x Deleted - - - - MEP
[DELETED]
Cost Proposal
Already Submitted
27 VO027 Additional Excavation in Sodding Area 10/3/2018 COR-0529 x HAC-ENG-COR-529 - Civil
AWAITING Reply
from Engineer.
Review Under
28 1 VO028 Additional GSE Pavement beside PIER-3 10/10/2018 EI-AGW-112-A a Submitted 28/Aug/2020 HAC/ENG/COR/1486 - - 2,719,987.00 17,887,670.00 2,324,618.00 15,626,177.69 Civil 1 PMU
29
VO029 Revised Manhole and Conduits 7/12/2017 EI-AGL-PW-008-A a Deleted - - - - MEP
[CANCELLED]
33
VO033 Change Size of Retention Pond Outlet Box Culvert 8/30/2018 EI-CW-099-A a
Already covered
- - Civil
C within VO 19
27/11/2018 EI-CW-0121
39 VO039 Investigation for Old Runway 08/12/2018 COR-0603
x To be submitted GENARAL
Pages 2 of 5
2/2/2021
41 VO041 Revised Conduit Details 1/7/2019 EI-AGW-128-A a Submitted 24/Oct/2020 HAC/ENG/COR/1562 (1,376,884) (9,239,209) 2,376,836.00 7,841,533.00 MEP 20
42 VO042 Improvement Works for Natural Stream / Canal 1/24/2019 EI-CW-135-A a Submitted 31/Jul/2020 HAC/ENG/COR/1443 (2,222,754) (14,913,356) 3,122,282.00 15,995,143.00 GENARAL 21
43 VO043 Revised Interconnection of SPS 2/25/2019 EI-CW-143-A a Submitted 23/Dec/2020 HAC/ENG/COR/1637 - - 115,748.00 68,227.00 MEP 17
VO044 Access Road to Bulk Store from Main Road + Part 6/Sep/2019 HAC/ENG/COR/0956 320,437.00 2,095,829.00 Civil 1 Bulk store
44 02 2/27/2019 EI-CW-144-A a Submitted
[HAC follow-up letters: COR-1276 on 15.Feb. 2020; COR-
1393 on 27 June 2020] 23/Sep/2019 HAC/ENG/COR/0991 1,142,709.00 7,473,940.00
49
VO049 MII & Special MII Cover at Crossing of Taxiway 4/4/2019 EI-AGW-160-A a Deleted - - - - MEP
Entrance [DELETED]
50
VO050 Relocation of existing Fiber Optic Cable (ILS) 4/4/2019 EI-AGW-161-A a Deleted - - - - MEP
[DELETED]
51 VO051 Revised F3 Drain 7/9/2019 EI-CW-169-A a Submitted 7/Nov/2020 HAC/ENG/COR/1575 (2,658,150) (17,836,335) 86,469,614.00 36,132,200.00 MEP 22
Review Under
55 4 VO055 PCCP Steel Reinforcement 7/17/2019 EI-GM-172 a Submitted 24/Aug/2020 HAC/ENG/COR/1479 - - 309,906.00 2,026,954.00 182,502.00 1,248,174.70 Civil 1 PMU
Already Covered by
56 VO056 Relocation of Security Hut and SLAF Bunker 7/24/2019 EI-GM-175 a - - Civil
VO 44
57 VO057 DC Power Panel 7/24/2019 EI-GM-177 a Submitted 7/Aug/2020 HAC/ENG/COR/1454 (183,919) (33,521) 435,595.00 810,068.00 MEP 8
58 VO058 Apron Floodlighting Panel Board [DELETED] 7/27/2019 EI-AGW-176-A a Deleted - - - - MEP
60
VO060 Removal of Asphalt on Plinth Beam and Additional x Deleted - - - - Civil
Plinth Beam at Grid C-B/9-11. [CLOSED]
Pages 3 of 5
2/2/2021
02/09/2019 EI-AGW-139-A
VO064 FAT & Factory Training for AGL CMS a
64 02/05/2019 EI-AGW-163-A
x
Submitted 6/Jan/2020 HAC/ENG/COR/1149 (4,634,633) (361,917) 14,917,561.00 2,104,086.00 MEP 23
[CP submitted on 06 Jan. 2020 COR-1149] JAC/Pk.B/19/598
10/04/2019
66
VO066 Reorientation of Special Manhole 7T to 1T - Not a 2/13/2019 EI-AGW-142-A x Not a VO - - - - MEP
Variation - Can claim by BoQ Day Work
16/10/2017 EI-PW-030-A
68 VO068 Installation of Conduits under the Railway 13/09/2017 JAC/Pk.B/17/079
x Submitted 3/Oct/2020 HAC/ENG/COR/1487 - - 58,313.00 385,823.00 MEP 10
69 VO069 Realignment od Piping Sewer Line SPS 16-15 12/21/2017 EI-UW-034-A x Not a VO MEP
70 VO070 Revised Treated Water Distribution Pipe 1/18/2018 EI-UW-035-A x Submitted 20/Nov/2020 HAC/ENG/COR/1599 (30,400) (203,700) 416,126.00 2,493,555.00 MEP 24
71
VO071 Change the Location of LV Panel in 04 AFL 1/28/2018 EI-UW-052-A x Cover by VO 21 . - - MEP
Substation
Already clamed by
72 VO072 Additional Manhole and Conduits 4/11/2018 EI-UW-063-A x IPC-16 under VO38, MEP
VO 22
Power + Control
cable cover by VO
73 VO073 Reroute of Existing Borewell Conveyance Pipe 6/26/2018 EI-UW-090-A x 79, conveyance pipe MEP
will claim BOQ 71017-
03
74
VO074 Temporary Line of MV Cable near Box Culvert A 7/20/2018 EI-PW-093-A x To be submitted MEP
and New 04 AFL Substation
Covered by VO 31&
75 VO075 Installation of Control Cable and Other 9/17/2018 EI-AGW-107-A a - - MEP
VO 76
76 VO076 Installation of Fiber Copper Termination Panels 9/28/2018 EI-AGW-109-A a Submitted 9/Jul/2020 HAC/ENG/COR/1416 - - 172,733.00 1,129,771.00 MEP 11
23/11/2018 EI-AGW-120-A
77 VO077 Additional Requirement Manhole and Conduits a Submitted 8/Aug/2020 HAC/ENG/COR/1457 (144,184) (967,862) 442,914.00 2,907,468.00 MEP 20
23/01/2019 JAC/Pk.B/19/371
78 VO078 Construction of New Sewer Manhole at SPS-10 1/24/2019 EI-UW-136-A x Submitted 14/Nov/2020 HAC/ENG/COR/1587 - - 74,621.00 492,718.00 MEP 15
79 VO079 Relocation of Cables for Existing BW-17 & 18 8/13/2019 EI-UW-183-A a Submitted 17/Sep/2020 HAC/ENG/COR/1512 - - 97,044.00 634,720.00 MEP 15
81 VO081 Additional Grounding work for AFL High Mast 4/24/2019 JAC/Pk.B/19/427 x Submitted 14/Aug/2020 HAC/ENG/COR/1467 (454,335) (3,048,675) 675,969.00 4,535,853.00 MEP 13
VO082 Additional Concrete for RCC Pipe Protection at SD- 18/10/2019 EI-CW-190-A a
82
23/12/2019 EI-CW-202-A a
Submitted 2/Jul/2020 HAC/ENG/COR/1400 - - 348,360.00 2,278,460.00 Civil 25
08 Uditch
Pages 4 of 5
2/2/2021
86 VO086 Special Manhole (Aeronautical Lighting Works) 8/18/2018 EI-AGW-097-A a Submitted 18/Jul/2020 HAC/ENG/COR/1429 - - 7,959,452.00 11,737,686.00 MEP 9
87
VO-087 Subgrade Preparation in E3 Graded Area Lean x
No considerable cost
Civil
Concrete impact to change
Cause No.17
88 EI-CW-206-A x Submitted 12/Dec/2020 HAC/ENG/COR/1630 (20,516) (137,654) 989,969.00 6,551,104.00 Civil 27
VO-088/CL Expansion of ULD Yard
Cause No.16
89 EI-CW-205-A a Submitted 4/Jul/2020 HAC/ENG/COR/1412 (44,664) (2,908,440) 638,587.00 4,507,597.00 Civil 28
VO-089 Landscaping Building -F# Drain Box Culvert
JAC/Pk.B/20/1021
90 VO-090 Tools and Spare Parts for Power Supply a Submitted 27/Nov/2020 HAC/ENG/COR/1609 - - 2,422,111.00 15,841,922.00 MEP 29
JAC/Pk.B/20/991
NOTES:
a Variation as per Engineer's Instruction
x Engineer's instruction - Not Variation. Contractor's understanding is, Variation
Pages 5 of 5