Professional Documents
Culture Documents
Air Catch Sensor: Series
Air Catch Sensor: Series
ZSE
ISE
ZSP
PS
ISA
PSE
IS
ISG
ZSM
813
P0756-P0822-E.qxd 08.8.27 6:37 PM Page 815
Series ISA
How to Order
Option
Nil ∗ DIN rail compliant ZSE
Output specifications B With bracket ISE
11 NPT open collector output G With gauge
15 PNP open collector output ∗ DIN rail must be ordered ZSP
separately.
PS
Stations 1 to 6
ISA
Wiring specifications
Ex. 1) NPN output, 4 stations, centralized wiring terminal block BOX (left), with bracket and gauge Nil Individual wiring (Without terminal block BOX)
PSE
ISA11-4L-01BG L Centralized wiring (With terminal block BOX, left side)
R Centralized wiring (With terminal block BOX, right side)
Ex. 2) PNP output, individual wiring, with gauge IS
ISA15-1-01G ISG
ZSM
Accessory
· Bracket: ISA-1-A
· Gauge: G33-3-01
· DIN rail: ISA-2-1 to 7
110
q we r t
100 L
4 x ø4.5 90 5 25 10 7.5
ø30
42
34
28
R 1/8
4.5
35
27
9
16.5 13
5.6
815
P0756-P0822-E.qxd 08.8.27 6:37 PM Page 816
Series ISA
Specifications
SUP port
S1 S3 LED level meter
Sensor Red ON: Output OFF
S2 S4 Green ON: Output ON
+
P2 Redq
Detection port Below set position
Large clearance
S1, S2: Fix orifice Redw
S3: Variable orifice (adjusted by setting dial)
S4: Detection nozzle
BEST POSITION Greenq Set position
In a bridge circuit as in the figure above, a detection gap is applied to the
detection nozzle (S4) while the setting dial S3 is adjusted to balance the Small clearance Greenw Above set position
pressure applied to the pressure sensor (P1 = P2). The pressure sensor
–
detects the differential pressure generated when the detection nozzle (S4)
is released. When the work piece comes close to the detection nozzle, the (1) For accurate setting, create the proper setting conditions by applying a
back pressure P2 increases until it is larger than P1 (P2 ≥ P1). Then the clearance gauge to the detection nozzle beforehand.
switch output turns on to notify that the pressure is below the detection (2) Confirm that pressure is being applied. At this time, if the setting dial is
gap. fully closed, all LEDs should be off.
(3) Turning the setting dial in a plus direction (counterclockwise) will cause
the LEDs to turn on in order: Red 1, Red 2, Green 1, Green 2.
(4) When the Green 1 LED level meter comes on, output will be switched
on, so please end the setting process at the point when Green 1
comes on.
(5) Apply a clearance gauge to the detection nozzle once more, and
confirm that Green 1 has switched on.
(6) Hold the setting dial with a finger, and tighten the lock nut with a
wrench. Tighten so that the setting dial will not turn.
816
P0756-P0822-E.qxd 08.8.27 6:37 PM Page 817
Load
OUT
1 2 3 4 5
Black +
12 to 24 VDC OUT
GND VCC NC
– 6
Max.80 mA
DC (–)
L side R side
Blue
OUT Max.80 mA +
Black 12 to 24 VDC
– q w e r t y
ZSE
Load
DC (–) ISE
Blue
ZSP
PS
O-ring
Gasket
Base
Series ISA
Deviation level L1
Deviation level 75 Terminal
indicator light 34 L2 34 40
10
Terminal block box
indicator light 40 block box
10
SUP port
Rc 1/8
(94.4)
70
100
(94.4)
70
90
DIN rail center
100
90
SUP
40
(4.5)
30
Setting dial
10
12 35 Lead wire electrical entry
10
69.3 (Max.74.4)
60
60
OUT
2.1 19.5
GND OUT6
Dimensions
When the bracket has two stations and the Station 2 3 4 5 6
terminal block box is on the right side, it L1 110 145 180 215 250
attaches to the second switch, while when L2 — 36 71 106 141
it is on the left side, it attaches to the first
switch. With n stations, it attaches to the
first switch and the nth switch.
(94.4)
25
70
DIN rail center
90
(94.4)
25
70
SUP
4.5
90
40
30
(4.5)
4.5
GND OUT6
VCC
4
818
P0756-P0822-E.qxd 08.8.27 6:37 PM Page 819
Lead wire (5 m)
Lead wire (5 m) L1
34 Bracket Bracket
34 L2 34
(18)
10
SUP port
10
Deviation level
Deviation level Rc 1/8 indicator light
indicator light DIN rail center
SUP
Gauge
100
100
90
90
40
(4.5)
30
Setting dial
10
10
42 42
EXH port
69.3 (Max.78.4)
69.3 (Max.78.4)
60
OUT
ISE
2.1 19.5
60
ZSP
OUT OUT OUT OUT OUT OUT
Detection port
2.1 19.5
11.6
Rc 1/8
11.6
Detection port PS
Rc 1/8
Dimensions
When the bracket has two stations, it
Station 2 3 4 5 6
ISA
attaches to the first switch.
With n stations, it attaches to the first
L1 70 105 140 175 210
switch and the nth switch.
L2 — 36 71 106 141 PSE
IS
ISG
ZSM
Body With DIN rail Manifold
Lead wire (5 m) L1
35
(18)
SUP
90
35
4.5
35
40
30
(4.5)
35
70 Setting dial Gauge
Gauge
12 L2
L3
819
P0756-P0822-E.qxd 08.8.27 6:37 PM Page 820
Series ISA
60 60 60
Supply pressure Supply pressure
No
50 50 50 td
ete
cta
ble
Hysteresis (μm)
Hysteresis (μm)
Hysteresis (μm)
0.1MPa
0.1MPa
40 40 40
Supply pressure
30 30 30
0.1MPa
20 20 20
0.15MPa 0.15MPa
0.15MPa
10 10 10
0.2MPa 0.2MPa 0.2MPa
Ex. 1) To detect 300 μm, select a ø1.0 detection nozzle and supply pressure of 0.2 MPa.
Ex. 2) To detect 10 μm, select a ø1.5 detection nozzle.
Nozzle Shape
Please keep the nozzle shape as illustrated below.
Take every caution against chamfer on the detection surface and/or nozzle hole,
which could affect the characteristics as illustrated in Figure (1).
Figure (1)
Chamfer is not
ø1 ø1.5 ø2 allowed.
Detection
surface
2 or more
2 or more
2 or more
820
P0756-P0822-E.qxd 08.8.27 6:37 PM Page 821
Response Time
Response time changes with detection distance and piping length. It is hardly influenced by the supply pressure and nozzle diameter (ø1.0 to ø2.0).
While both graphs assume a fixed set distance with changes in the detection distance, Fig. 2 shows responses at various set values and Fig. 3 shows
responses at various piping lengths. If the detection distance is equal to the set value, the response becomes quicker as the set value becomes smaller or
the piping length becomes shorter.
ZSP
Response time (sec)
1.5 3.0
PS
Response time (sec)
1.0 2.5
ISA
Piping tubing length
0.5 2.0
10m PSE
8m
0
50 100 150 200 250 300 350 1.5
5m
IS
3m
Detection distance (μm) 1.0 ISG
1m
0 50 100
Detection side nozzle: ø1.0 Detection side nozzle: ø1.5 Detection side nozzle: ø2.0
Detection side piping: ø6 x ø4 tubing Detection side piping: ø6 x ø4 tubing Detection side piping: ø6 x ø4 tubing
300 300 300
Detection distance (μm)
821
P0756-P0822-E.qxd 08.8.27 6:37 PM Page 793
ZSE
ISE
ZSP
PSE
IS
ISG
Optimum position is known at a glance. LED level meter ZSM
Easy-to-operate
large dial
Above set position Set position Below set position
Red Green Green
Extraneous
material
W W W
Scale provides
guidelines for set
position.
2 wiring methods
Individual Centralized
wiring Wiring
Series ISA2
How to Order
Manifold
Without control unit IISA2 N PL 3 B
With control unit IISA2 C SL 3 B 1 D E2
Pressure gauge of regulator Note 1)
A* Without pressure gauge Note 2)
E2 MPa single notation 0.2 Square embedded
pressure gauge
Control unit Z2* psi single notation MPa
C With regulator + 2 port solenoid valve E4 MPa single notation 0.4
V With 2 port solenoid valve Z4* psi single notation MPa
G2 MPa single notation 0.2 Roundgauge
pressure
P2* MPa-psi double notation MPa
G4 MPa single notation 0.4
Electrical entry and supply port position P4* MPa-psi double notation MPa
SR Centralized wiring with supply port on the right Note 1) Due to new Japanese weight and
Centralized wiring with supply port on the left measurement legislation, psi notation
SL
type cannot be sold or used in Japan.
PR Individual wiring with supply port on the right Note 2) The pressure gauge port is Rc 1/8.
PL Individual wiring with supply port on the left * Manufactured upon receipt of order.
Note) The supply port position is the one when the switch
is viewed from the front.
Stations Throttle/Manual lock of 2 port solenoid valve
1 1 station Nil Without throttle, without manual lock
2 2 stations C With throttle, without manual lock
3 3 stations W Without throttle, with manual lock
4 4 stations M With throttle, with manual lock
5 5 stations Throttle
6 6 stations
Option
Nil Without bracket Manual lock
B With bracket
With mounting
D
bracket for DIN rail
Note) DIN rail must be
ordered separately.
Electrical entry of 2 port solenoid valve
(Refer to page 808.)
D : DIN connector D0: DIN connector T : Conduit terminal
DL: DIN connector (Without connector) TL: Conduit terminal
Voltage of 2 port (With indicator light) (With indicator light)
solenoid valve
1 100 VAC
2 200 VAC
3 110 VAC
4 220 VAC
5 24 VDC
6 12 VDC
36 230 VAC
794
P0756-P0822-E.qxd 08.8.27 6:37 PM Page 795
How to Order
For single and double notation type and additional stations
Air catch sensor
ISA2 G E2 1
Detection distance Electrical entry
G 0.01 to 0.25 mm Piping specifications Straight
H 0.03 to 0.5 mm Nil Rc 1/8 Output specifications
N NPT 1/8 1 NPN output Nil
F∗
Individual wiring
G 1/8 5 PNP output
∗ Manufactured upon receipt
of order.
Right angle
Pressure gauge Note 1)
A∗ Without pressure gauge Note 2) L∗
E2 MPa single notation 0.2 Square embedded
pressure gauge
Z2∗ psi single notation MPa
E4 MPa single notation 0.4 N Without lead wire
Z4∗ psi single notation MPa ZSE
Centralized wiring
G2 MPa single notation 0.2 Round pressure ISE
gauge
P2∗ MPa-psi double notation MPa
G4 MPa single notation 0.4 P Terminal block box ZSP
P4∗ MPa-psi double notation MPa
Note 1) Due to new Japanese weight and PS
measurement legislation, psi notation ∗ Manufactured upon receipt
type cannot be sold or used in Japan. of order.
Note 2) The pressure gauge port is Rc 1/8. ISA
∗ Manufactured upon receipt of order.
PSE
Ordering Example
IS
Without control unit
Centralized wiring Individual wiring Centralized wiring/Supply port right ISG
Individual wiring Centralized wiring
air catch sensor
Terminal box
Centralized wiring
air catch sensor
air catch sensor
ISA2-GE41N
Terminal
box ISA2-HE41P
ZSM
ISA2-GE41P
3 0 3 0 3 0 3 0 3 0
6
PU
L L SET
9
Supply port 6
PU
L L SET
9 6
PU
L L SET
9 6
PU
L L SET
9 6
PU
L L SET
9
Supply port
0.1
0.2
0.3 IN IN 0.1
0.2
0.3 0.1
0.2
0.3 0.1
0.2
0.3 0.1
0.2
0.3 IN
0 0.4 0 0.4 0 0.4 0 0.4 0 0.4
MPa MPa MPa MPa MPa
IISA2NSR-1B1 set (1 station manifold part number) IISA2NPL-1D1 set (1 station manifold part number) IISA2NSR-3D1 set (3 stations manifold part number)
∗ISA2-GE41P1 set (Air catch sensor part number) ∗ISA2-GE41N 1 set (Air catch sensor part number) ∗ISA2-HE41P 3 sets (Air catch sensor part number)
Prefix the part number of the air catch sensor Prefix the part number of the air catch sensor Prefix the part number of the air catch sensor
with an asterisk (∗). with an asterisk (∗). with an asterisk (∗).
Regulator
3 0 3 0 3 0
PU PU PU
Supply port
PU PU PU L L SET L L SET L L SET
L L SET L L SET L L SET
Supply port 6 9 6 9 6 9
6 9 6 9 6 9
IN
0.2 0.2 0.2 0.1 0.3 0.1 0.3 0.1 0.3
0.3 0.3 0.3
IN
0.1 0.1 0.1
0.1
0.05 0.15 0 0.4 0 0.4 0 0.4
0 0.4 0 0.4 0 0.4 MPa MPa MPa
MPa MPa MPa
0 0.2
MPa
Left Right
Bracket Bracket
Stations 3 2 1 Stations 1 2 3
IISA2CSL-3B5DLCE21 set (3 stations manifold part number) IISA2VPR-3B5DLC1 set (3 stations manifold part number)
∗ISA2-HE41P 3 sets (Air catch sensor part number) ∗ISA2-GE41 3 sets (Air catch sensor part number)
Prefix the part number of the air catch sensor with an Prefix the part number of the air catch sensor with an
asterisk (∗). asterisk (∗).
795
P0756-P0822-E.qxd 08.8.27 6:37 PM Page 796
Series ISA2
Specifications
Model ISA2-G1 ISA2-G5 ISA2-H1 ISA2-H5
Detection distance 0.01 to 0.25 mm 0.03 to 0.50 mm
Fluid Dry air (filtered to 5 μm)
Operating pressure range 30 to 200 kPa 50 to 200 kPa
Recommended detection nozzle ø1.5 ø2.0
pressure
Working Principle
796
P0756-P0822-E.qxd 08.8.27 6:37 PM Page 797
NPN open collector output Circuit and Wiring for 2 Port Solenoid Valve
DC (+)
OUT
Load
1 DC (+) 1 ( )
switch
2 DC () 2 ( )
1 DC (+)
MAX 80 mA Rectifying
switch
OUT device
Load 12 to 24 VDC ZNR ZNR
12 to 24 VDC SOL 100 to 200 VAC
SOL
DC ()
LED 2 DC () indicator 2 ( )
light
1. Insert the connector of the lead wire with its key groove at the
proper position.
2. Hold the knurl with 2 fingers and rotate it clockwise. Do not use 1. Mount the seal conduit on the terminal box. For mounting
tools. procedure, refer to the catalog and instruction manual provided
by the manufacturer of the seal conduit.
Lead wire with connector 2. Thread the cable through the seal conduit and arrange wiring
according to the polarity of the terminal block illustrated above.
Knurl
3. Fasten the seal conduit with a tightening torque not greater
than 5 N×m. Do not hold the terminal box or the switch.
797
P0756-P0822-E.qxd 08.8.27 6:37 PM Page 798
Series ISA2
The data in the following charts are characteristics of hysteresis at the detection distance.
In case accuracy is required by the settings, the design should be made so that the hysteresis will stay within the optimum adjustment
range not larger than 0.01 mm.
The smaller the hysteresis, the better the sensitivity. In cases where the hysteresis exceeds 0.01 mm, the air catch sensor should be
used to check the presence of the work piece.
ISA2-G ISA2-H
Hysteresis (mm)
0.07 0.07
0.06 0.06 100 kPa
0.05 0.05
100 kPa
0.04 0.04
0.03 200kPa 0.03
200 kPa
0.02 0.02
0.01 0.01
Optimum adjustment range Optimum adjustment range
0 0
0 0.05 0.1 0.15 0.2 0.25 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5
Detection distance (mm) Detection distance (mm)
Hysteresis (mm)
0.07 0.07
0.06 0.06
0.05 0.05
100 kPa
0.04 0.04
200 kPa
0.03 0.03
200 kPa
0.02 0.02
0.01 0.01
Optimum adjustment range Optimum adjustment range
0 0
0 0.05 0.1 0.15 0.2 0.25 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5
Detection distance (mm) Detection distance (mm)
Hysteresis (mm)
0.07 0.07
0.06 0.06
0.05 0.05
100 kPa
0.04 0.04 200 kPa
0.03 0.03
200 kPa
0.02 0.02
0.01 0.01
Optimum adjustment range Optimum adjustment range
0 0
0 0.05 0.1 0.15 0.2 0.25 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5
Detection distance (mm) Detection distance (mm)
798
P0756-P0822-E.qxd 08.8.27 6:37 PM Page 799
Response Time
Response time changes with detection distance and piping length. It is hardly influenced by the supply pressure and nozzle diameter
(ø1.0 to ø2.0).
While all graphs assume a fixed set distance with changes in the detection distance, the upper charts show responses at various set
values and the lower charts show responses at various piping lengths. If the detection distance is equal to the set value, the response
becomes quicker as the set value becomes bigger or the piping length becomes shorter.
ISA2-G ISA2-H
Detection nozzle: ø1.5 Supply pressure: 100 kPa Detection nozzle: ø2.0 Supply pressure: 100 kPa
Detection side piping: ø6 x ø4 tubing 5 m Detection side piping: ø6 x ø4 tubing 5 m
2.5 Set value 2
2
0.05 mm 1.5 Set value
Response time (sec)
2
8m
0.9
1.5 8m 5m
5m 0.6
1
3m
3m 0.3
0.5
1m 1m
0 0
0 0.02 0.04 0.06 0.08 0.1 0.12 0.14 0.16 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35
Detection distance (mm) Detection distance (mm)
2 or more
2 or more
799
P0756-P0822-E.qxd 08.8.27 6:37 PM Page 800
Series ISA2
The charts illustrate changes in the detection distance with fluctuations in the supply pressure.
ISA2-G ISA2-H
0.2 0.3
0.15 mm
0.2 0.15 mm
0.1
0.1
0.01 mm 0.03 mm
0 0
0 50 100 150 200 250 0 50 100 150 200 250
Supply pressure (kPa) Supply pressure (kPa)
0.3
0.4
0.2 0.3
0.15 mm
0.2 0.15 mm
0.1
0.1
0.01 mm 0.03 mm
0 0
0 50 100 150 200 250 0 50 100 150 200 250
Supply pressure (kPa) Supply pressure (kPa)
0.3
0.4
0.2 0.3
0.15 mm
0.2
0.15 mm
0.1
0.1
0.01 mm 0.03 mm
0 0
0 50 100 150 200 250 0 50 100 150 200 250
Supply pressure (kPa) Supply pressure (kPa)
800
P0756-P0822-E.qxd 08.8.27 6:37 PM Page 801
Setting Procedure
The detection distance is set with the LED level meter and setting 1. For accuracy in setting, apply a clearance gauge to the dete-
dial. ction nozzle to replicate the set condition in advance.
Keep the setting dial pulled out while in use. If released, it will 2. Confirm that the set pressure is applied. If the setting dial is
return to its original position and become unable to rotate. fully open, the LED level meter appears as .
3. Pull the setting dial and rotate it in the positive direction. The
lights will turn on in the order shown below.
Rotate in the
positive direction.
Red
Pull out
Green 2 ZSE
ISE
4. The sensor output comes on when the lights on the LED level ZSP
meter turn on as . Complete the setting when this condi-
tion is observed. PS
5. Apply the clearance gauge again to confirm that the lights turn
on as . ISA
Pulled out
PSE
Handling and setting of 2 port solenoid valve Handling and setting of limit gauge indicator
IS
Throttle setting for blowing to prevent water and cutting oil from OPEN arrow
1. Removal of cover
entering the nozzle. Hook the finger on the front ISG
(Clockwise: Close throttle; Counterclockwise: Open throttle) cover ridge and rotate it in
the direction of the OPEN
∗ The setting is not applicable to valves without throttle. arrow until it stops (15).
ZSM
Then pull out and remove
1. Power off the valve. the cover.
2. Rotate the throttle clockwise for adjustment so that the
detection nozzle will not suck up water or cutting oil. 2. Setting the installation needle
The installation needle should be moved by the fingertip.
Set the 2 green installation needles at the maximum and
minimum limits of pressure.
Example
Rotate
clockwise
IN
Throttle
3. Installation of cover
After setting the installation needles, locate the OPEN
arrow at the top right position and insert the claws on the
cover into the grooves on the case (indicated by in the
expanded view of A part). Rotate the cover clockwise until
it stops. Confirm that the cover is firmly secured.
Solenoid
801
P0756-P0822-E.qxd 08.8.27 6:37 PM Page 802
Series ISA2
3
0.2
le
Sca
3 0
6 9
802
P0756-P0822-E.qxd 08.8.27 6:37 PM Page 803
∗ When the SUP port is on the left, the stations are sequentially
Dimensions: Centralized Wiring Type numbered from the side of the terminal block box.
With bracket L1
3 60 38 L2 38 5
Terminal block box LED level meter
3 0 3 0 3 0
PU PU PU
LL SET LL SET LL SET
81
6 9 6 9 6 9
Setting dial
0.2 0.2 0.2
0.1 0.3 0.1 0.3 0.1 0.3
12
Pressure gauge
12
21
Bracket
24
5.5
DC () OUT 6
17
DC (+) PSE
39
5
Detection port M4 x 8
19
Rc, NPT, G 1/8 (With HW, SW) IS
Terminal block box wiring diagram For the bracket attachment
position, refer to page 806.
Seal conduit entry ISG
(ø21)
End plate L
End plate R EXH port
3 0 3 0 3 0
PU PU PU
LL SET LL SET LL SET
81
6 9 6 9 6 9
Stations 1 2 3 4 5 6
63(Max. 65)
DC () OUT 6
17
19 Detection port
Terminal block box wiring diagram Seal conduit entry Rc, NPT, G 1/8
(ø21)
803
P0756-P0822-E.qxd 08.8.27 6:37 PM Page 804
Series ISA2
With bracket
L1
3 38 L2 38 5
LED level meter
Lead wire connector
EXH port End plate L EXH port
End plate R
3 0 3 0 3 0
92 PU PU PU
L L SE T L L SE T L L SE T
81 6 9 6 9 6 9
Setting dial
0.2 0.2 0.2
0.1 0.3 0.1 0.3 0.1 0.3
12
21
Bracket
24 6.5 L3
Rc, NPT, G 1/8
24
36 36
Left Right
Stations 1························· n
Stations 1 2 3 4 5 6
63(Max. 65)
3 0 3 0 3 0
DIN rail
92
PU PU PU
L L SET L L SET L L SET
Setting dial
81
center 6 9 6 9 6 9
Pressure
20.5
SUP port
gauge
Rc, NPT, G 1/8 Plug
24 DIN rail mounting
bracket
L3
5.25 11.2
L4
L5
Stations 1 2 3 4 5 6
63 (Max. 65)
32.8
L2 38 76 114 152
38 76 114 152 190
34
L3
17
3 3
Throttle needle
SUP port PU
LL
SUP port PU
LL
6 6
Rc, NPT, G 1/4 Rc, NPT, G 1/4
118
143
144
0.1 0.1
0.1
0.05 0.15
0 0
0 MPa 0.2
178
DIN
64.4
ZSE
DIN ISE
connector
25 ZSP
82 Conduit terminal Conduit terminal
97 40 10 42 PS
ISA
With regulator + 2 port solenoid valve With 2 port solenoid valve PSE
IS
ISG
SUP port on the right ZSM
97
Conduit terminal Conduit terminal
82
DIN
connector
DIN connector
0 0
SET SET
9 9
162
0.3 0.3
0.1
133
0.05 0.15
128
0.4 0.4
0 MPa 0.2
103
64.4
SUP port
Rc, NPT, G 1/4 Throttle needle SUP port
Rc, NPT, G 1/4
42 10 40 25
805
P0756-P0822-E.qxd 08.8.27 6:37 PM Page 806
Series ISA2
With 2 stations, the bracket is mounted on the second sensor from the left.
1 2
Left 1 2 Right 1 2
With n stations, the bracket is mounted on the first and “n” th sensor from the left.
1 2 n
1. Disassembly 1. Loosen the screws and remove the 2 mounting brackets on the
front and back side.
2. Disassemble the switch carefully so that the O-ring on the SUP
port will not be detached.
2. Insertion Recess Protrusion 1. Fit seal for additional station (ISA-7-B) to the recess of the
SUP port of the additional switch.
2. Fit the protrusion of the additional switch into the existing
switch.
3. Mount joint brackets (ISA-3-A) at 2 positions.
Note) Perform temporary tightening of screws.
4. Confirm that the recess of the SUP port of the existing switch
has seal for additional station attached.
5. Fit the protrusion of the existing switch into the recess of the
additional switch.
Existing joint brackets Joint brackets (ISA-3-A) 6. Mount the existing joint bracket.
Note) Perform temporary tightening of screws.
The switch for adding stations
3. Assembly
1. Tighten the joint brackets with the prescribed tightening torque
of 1.2 N×m.
2. Arrange pneumatic piping and confirm that there is no air leak-
age from new joints.
806
P0756-P0822-E.qxd 08.8.27 6:37 PM Page 807
Parts List
End plate R
ISA-6-B
Switch
mounting
t
h
bracket
ig
End plate L
R
ISA-3-A
ISA-6-A
Seal for additional station
ISA-7-B ZSE
Throttle
ISE
2 port solenoid valve
ZSP
Spacer
Regulator Y20 PS
ISA
Terminal block box
ISA-11-L (Centralized wiring/Supply port left)
PSE
ISA-11-R (Centralized wiring/Supply port right) IS
IN ISG
t
ef
L
ZSM
Spacer Seal for additional station End plate L End plate R
Y20 ISA-7-B ISA-7-A ISA-6-A ISA-6-B
When 2 air catch sen- When a 2 port solenoid
sors are connected or valve is connected to the
when a 2 port solenoid right:
valve is connected to the
left:
Joint bracket Lead wire with connector (Individual wiring type) Bracket DIN rail mounting bracket
ISA-3-A ISA-8-A ISA-8-B ISA-4-A ISA-9-A
A pair consists 1 set. Straight, 5 m Right angle, 5 m
With mounting
screw 2 pcs.
807
P0756-P0822-E.qxd 08.8.27 6:37 PM Page 808
Series ISA2
DIN Rail
ISA-5-
L
Applicable models
1.25 8 4.5 7.5 Part no. L
Individual wiring type Centralized wiring type
ISA-5-1 73.0 IISA2P-1 —
ISA-5-2 135.5 IISA2P-2 IISA2S-1
ISA-5-3 173.0 IISA2P-3 IISA2S-2
ISA-5-4 210.5 IISA2P-4 IISA2S-3
5.5
35
35
AR 20 02 E 1 VCA27A 5 DL S 4 02 Q
Thread type Port size
Voltage 02 Rc 1/4 CE
Nil Rc 1 100 VAC marked
02N NPT 1/4
N NPT 2 200 VAC 02F G 1/4
F G 3 110 VAC
Option (The shape of pressure gauge) Note 2) 4 220 VAC Throttle
Nil None 5 24 VDC Nil Without throttle and manual lock
E Square embedded pressure gauge (With limit indicator) 6 12 VDC S With throttle
G Note 1) Round pressure gauge (With limit indicator) 36 230 VAC B With manual lock
Note 1) The pressure gauge port is 1/8. The pressure gauge is K With manual lock and throttle
included in the package (not assembled).
Electrical entry
Note 2) Order individually when 0.4 MPa gauge is required.
D DIN connector
Option specification DL DIN connector (With light)
Nil None D0 DIN connector (Without connector)
N Non-relieving T Conduit terminal
R Flow direction: Right to left TL Conduit terminal (With light)
Z Note 1) Unit representations on the label and pressure gauge are psi and °F
When specifying more than one option, enter symbols first in numerical, then Standard Specifications
in alphabetical orders. Valve type Direct operation poppet
Note 1) Compatible with thread type NPT. Under the New Measurement Law, Fluid Air, Inert gas
this type is only sold outside Japan. (The SI unit is used inside Japan.)
Valve specifications
Set pressure + 0.05 MPa Allowable voltage fluctuation ±10% rated voltage
Relief pressure
{at relief flow of 0.1 l/min(ANR)} Type of coil insulation B type
Ambient and fluid temperature –5 to 60°C (No freezing) Power consumption DC VCA2: 6.5 W
Construction Relieving type Apparent Note 1) 50 Hz
Series ISA2
Specific Product Precautions 1
Be sure to read before handling. Refer to front matters 58 and 59 for Safety Instructions
and pages 687 to 691 for Pressure Switch Precautions.
Caution C R
Leakage
voltage
supply
Power
Mounting Warning
1. Do not use the air catch sensor if the leakage
Caution amount increases or the equipment does not
1. If the detection nozzle is exposed to splashes operate properly.
of water or cutting oil, do not allow backflow After installation, connect compressed air and electricity and
from the detection nozzle to the switch body. conduct an appropriate functionality inspection to confirm that
Install the switch body at a position higher the air catch sensor is installed properly.
than the detection nozzle wherever possible. 2. Do not apply external force to the coil.
Apply a wrench to the exterior surface of the piping joint at the
Piping time of tightening.
3. Do not use heat insulators, etc. to keep the
Caution temperature at the coil assembly.
1. Piping equipment Do not use a tape heater for freeze prevention except on the
In the piping between the switch body and the detection piping and body. If may cause the coil to burn.
nozzle, do not use equipment or fittings that can possibly
cause leakage or serve as resistance.
Do not use One-touch fittings in an environment where the air
catch sensor is exposed to water or other liquid.
809
P0756-P0822-E.qxd 08.8.27 6:37 PM Page 810
Series ISA2
Specific Product Precautions 2
Be sure to read before handling. Refer to front matters 58 and 59 for Safety Instructions
and pages 687 to 691 for Pressure Switch Precautions.
Caution Warning
1. The adjustment knob must be handled manually. Use of tools may
In case of series VC (B type coil) cause damage to the product.
Conduit terminal, DIN type connector 2. Check the inlet and outlet pressure indications on the pressure
Rectifying gauge while setting. If the knob is turned to excess, it may cause
DC circuit ZNR AC circuit ZNR device
1 (+, -) internal parts to fracture.
1
3. Since products for 0.02 to 0.2 MPa settings come with a pressure
gauge for 0.2 MPa, do not apply pressure exceeding 0.2 MPa. It
SOL. SOL.
may cause damage to the pressure gauge.
2 (-, +) 2
Without indicator light Without indicator light
Caution
Conduit terminal, DIN type connector
DC circuit AC circuit Rectifying
1. Unlock the knob before pressure adjustment and lock it again when
ZNR ZNR device the adjustment is over.
1 (+, -) 1 Incorrect procedure may cause damage to the knob or lead to the
outlet pressure fluctuation.
SOL. SOL. • Pull the adjustment knob to release the lock. An orange colored
line is provided at the bottom of the adjustment handle for visual
2 (-, +) 2 checking.
Indicator light Indicator light • Push the pressure regulation knob to engage the lock. If it does
With indicator light With indicator light not lock easily, turn the knob slightly clockwise or counterclock-
wise until the orange colored line goes out of sight.
2. When the product is installed, leave a space of 60 mm on the side
Maintenance of the valve guide (opposite to the knob) for maintenance and
inspection.
Warning
1. Low-frequency operation
Perform valve switching at least every 30 days to prevent
malfunction. Also, conduct a periodic inspection at intervals of
approximately 6 months to use the product in its best condi-
tion.
Manual Operation
Warning
How to operate manually
Locking type (tool required)
To open valve: Rotate to the right by 90° using a flat head
screwdriver. It will still hold open even when the
driver removed.
To close valve: Rotate to the left by 90° to achieve the former
closed position.
Electrical operations should be undertaken when the valve is closed.
810
P0756-P0822-E.qxd 08.8.27 6:37 PM Page 811
Series ISA2
Specific Product Precautions 3
Be sure to read before handling. Refer to front matters 58 and 59 for Safety Instructions
and pages 687 to 691 for Pressure Switch Precautions.
Caution Caution
• Before the product is disassembled, DIN connector (B type only)
shut off the power and pressure The internal wiring of the DIN connector is illustrated below. Connect
supply and exhaust the residual each terminal to the power supply.
pressure.
Mounting
• Disassembly procedure 1: +
screw + 3
()
1
1. Remove the top mounting screws.
2
2. Remove the solenoid coil, spring 2:
(+)
and armature assembly.
3. If there is any foreign matter ZSE
adhering on the surface, take ISE
appropriate measures to clear it
off such as an air blow or washing ZSP
with neutral detergent. Terminal no. 1 2
• Assembly procedure Solenoid DIN terminal + (-) - (+) PS
Reverse the above procedure to coil ∗ No polarity.
assemble the product. • A cabtire cable with an O.D. ø6 to 12 mm is applicable. ISA
In case the electrical entry is • Tighten each part with an appropriate tightening torque shown below.
Spring
changed, also change the Connector PSE
mounting orientation of the Bind screw with a flange
solenoid coil before assembly.
Note 1) Tighten the 4 mounting screws by Armature
Tightening torque 0.5 to 0.6 N⋅m IS
each pair of corners on a diagonal assembly
line at the proper tightening torque ISG
shown below.
O-ring
ZSM
Fitting cable Note)
Washer (Cable O.D.
Body ø6 to 12 mm)
Rubber seal
Note) With a cable O.D. ø9 to 12 mm, hollow the rubber sealing before use.
811