1
41 Residential Floors, 1 Amenities Floor,
1 Lobby, and 5 Parking Floors
COMPANY REVISION: 0
HI - RISE BLDG. DESIGNED BY: CHECKED BY: APPROVED BY: CERTIFIED BY: REVIEWED BY: ACKNOWLEDGED BY:
PAGE:
GPON NETWORK
LAYOUT 1/1
CHRISTIAN JOSEPH ORILLE, ECE JERRY GO JERRY GO NEIL KEVIN JACOB, ECE DANISSE DACANAY, ECE CARLO MIGUEL ADAJAR
ARCHITECTURAL LAYOUT DESIGNER TEAM LEADER PROJECT MANAGER PROJECT ENGINEER NETWORK ENGINEER HEAD ENGINEER DATE: 02/24/2020
ARCHITECTURAL LAYOUT
ONT / ONU
COUNT: 4800
OTO / IOO
COUNT: 4800
WIRELESS
OPTION 1:
ETHERNET
&
WIFI
DAX CONTROLLER OLT (96 PORTS)
COUNT: 1 COUNT: 6 (1X16)
DISTRIBUTION BOX
(1X96 and 1x24) ETHERNET
OPTION 2:
COUNT: 2 ETHERNET
ONLY
SINGLE MODE 120 CORE FOC FIBER OPTIC TERMINAL BOX (2 x 1:64)
(96 Fiber Assigned, 24 Fiber Spare) (2 x 50 PORTS ASSIGNED, 2 x 14 PORTS SPARE)
COUNT: 1 COUNT: 96
LEGEND:
FOC
UTP
COMPANY REVISION: 0
HI - RISE BLDG. DESIGNED BY: CHECKED BY: APPROVED BY: CERTIFIED BY: REVIEWED BY: ACKNOWLEDGED BY:
PAGE:
GPON NETWORK
LAYOUT 1/5
CHRISTIAN JOSEPH ORILLE, ECE JERRY GO JERRY GO NEIL KEVIN JACOB, ECE DANISSE DACANAY, ECE CARLO MIGUEL ADAJAR
ARCHITECTURAL LAYOUT DESIGNER TEAM LEADER PROJECT MANAGER PROJECT ENGINEER NETWORK ENGINEER HEAD ENGINEER DATE: 02/24/2020
VERTICAL RISER DIAGRAM
FD
48th Flr. (1:64)
FD (1:64)
FD
47th Flr. (1:64)
FD (1:64)
FD
46th Flr. (1:64)
FD (1:64)
FD
14th Flr. (1:64)
FD (1:64)
FD
13th Flr. (1:64)
FD (1:64)
FD
12th Flr. (1:64)
FD (1:64)
FD
11th Flr. (1:64)
FD (1:64)
FD
10th Flr. (1:64)
FD (1:64)
FD
9th Flr. (1:64)
FD (1:64)
FD
8th Flr. (1:64)
FD (1:64)
FD
Amenities (1:64)
FD (1:64)
FD
P5 (1:64)
FD (1:64)
FD
P4 (1:64)
FD (1:64)
FD
P3 (1:64)
FD (1:64)
P2 FD (1:64)
FD (1:64)
FD
P1 (1:64)
FD (1:64)
FD
Lobby CONTROL
CENTER
(1:64)
FD (1:64)
COMPANY REVISION: 0
HI - RISE BLDG. DESIGNED BY: CHECKED BY: APPROVED BY: CERTIFIED BY: REVIEWED BY: ACKNOWLEDGED BY:
PAGE:
GPON NETWORK
LAYOUT 2/5
CHRISTIAN JOSEPH ORILLE, ECE JERRY GO JERRY GO NEIL KEVIN JACOB, ECE DANISSE DACANAY, ECE CARLO MIGUEL ADAJAR
ARCHITECTURAL LAYOUT DESIGNER TEAM LEADER PROJECT MANAGER PROJECT ENGINEER NETWORK ENGINEER HEAD ENGINEER DATE: 02/24/2020
FLOOR DISTRIBUTION DIAGRAM
OTO OTO OTO OTO OTO OTO OTO OTO OTO OTO
ONT ONT ONT ONT ONT ONT ONT ONT ONT ONT
OTO OTO OTO OTO OTO OTO OTO OTO OTO OTO
ONT ONT ONT ONT ONT ONT ONT ONT ONT ONT
FD (1:64)
OTO
ONT
OTO
ONT
OTO
ONT
OTO
ONT
OTO
ONT
OTO
ONT
OTO
ONT
OTO
ONT
OTO
ONT
OTO
ONT
OTO OTO OTO OTO OTO OTO OTO OTO OTO OTO
ONT ONT ONT ONT ONT ONT ONT ONT ONT ONT
OTO OTO OTO OTO OTO OTO OTO OTO OTO OTO
ONT ONT ONT ONT ONT ONT ONT ONT ONT ONT
OTO OTO OTO OTO OTO OTO OTO OTO OTO OTO
ONT ONT ONT ONT ONT ONT ONT ONT ONT ONT
OTO OTO OTO OTO OTO OTO OTO OTO OTO OTO
ONT ONT ONT ONT ONT ONT ONT ONT ONT ONT
FD (1:64)
OTO
ONT
OTO
ONT
OTO
ONT
OTO
ONT
OTO
ONT
OTO
ONT
OTO
ONT
OTO
ONT
OTO
ONT
OTO
ONT
OTO OTO OTO OTO OTO OTO OTO OTO OTO OTO
ONT ONT ONT ONT ONT ONT ONT ONT ONT ONT
OTO OTO OTO OTO OTO OTO OTO OTO OTO OTO
ONT ONT ONT ONT ONT ONT ONT ONT ONT ONT
COMPANY REVISION: 0
HI - RISE BLDG. DESIGNED BY: CHECKED BY: APPROVED BY: CERTIFIED BY: REVIEWED BY: ACKNOWLEDGED BY:
PAGE:
GPON NETWORK
LAYOUT 3/5
CHRISTIAN JOSEPH ORILLE, ECE JERRY GO JERRY GO NEIL KEVIN JACOB, ECE DANISSE DACANAY, ECE CARLO MIGUEL ADAJAR
ARCHITECTURAL LAYOUT DESIGNER TEAM LEADER PROJECT MANAGER PROJECT ENGINEER NETWORK ENGINEER HEAD ENGINEER DATE: 02/24/2020