B.1 Environment Requirements for Equipment Room ....................................................... B-1
B.1.1 Requirements for Neatness, Temperature and Humidity ................................... B-1
B.1.2 Requirements for ESD Prevention ................................................................... B-3
B.1.3 Requirements for Electromagnetic Environment ............................................... B-3
B.1.4 Requirements for Lightning Proof Grounding .................................................... B-3
B.2 Requirements for Power Supply ................................................................................ B-6
B.2.1 Requirements for AC Power Supply ................................................................. B-6
B.2.2 Recommendations for A C Power Supply .......................................................... B-7
B.2.3 Requirements for DC Power Supply ................................................................. B-7
B.2.4 Recommendations for DC Power Supply.......................................................... B-8

Huawei Technologies Proprietary

i
Installation Manual Appendix B En vironment Requirements for
Quidway SessionEngine2200 Session Border Controller Equipment Running

Appendix B Environment Requirements for


Equipment Running

This document is based on the standards of the People’s Republic of China. If the
on-site situation is inconsistent with the document, refer to the local standards and
regulations.

B.1 Environment Requirements for Equipment Room

B.1.1 Requirements for Neatness, Temperature and Humidity

To maintain a favorable working environment and prolong the servic e life for the
equipment, keep the proper temperature and humidity in the equipment room.

The equipment room shall be free from explosive, conducting, permeability magnetic
and corrosive dust as well as corrosive gas, such as SO2, H2S, NH3, etc.

Table B-1 gives the specific requirements.

Huawei Technologies Proprietary

B-1
Installation Manual Appendix B En vironment Requirements for
Quidway SessionEngine2200 Session Border Controller Equipment Running

Table B-1 Requirements for neatness, temperat ure and humidity

Item Index

Max.
diameter 0.05 1 3 5
(µm)
Dust particle
Max. 7 5 5 5
1.4 X 10 7 X 10 2.4 X 10 1.3 X 10
density
Neatness
Gas SO2 H2S CI2 HCl HF NH3 O3 NO2
Density of
A verage 0.3 0.1 0.1 0.1 0.0 1.0 0.05 0.5
corrosi ve 3
(mg/m ) 1
gas
(Particle/m³) Max. 1.0 0.5 0.3 0.5 0.0 3.0 0.1 1.0
3
(mg/m ) 3

Long-term operation Short-term operation


o o o o
Temperature 0 C to 45 C -5 C to 55 C

Relative 5% to 85% 0% to 95%


humility
Temperatu
re and Remarks Short-term operation means that the continuous working time
humility does not exceed 48 hours and the accumulated time per year not
exceed 15 days.
The measurement point of the temperature and humidity is 1.5 m
over the floor and 0.4 m at the front of the cabinet. There should
be no the protection board at the front o r back of the cabinet.

To meet the above requirements, take the following measures in the equipment room.
 Use the perennial temperature-control device no matter what the local climate is.
 Mop the ground on a timed basis or use a humidifier to keep the proper humidity
in the equipment room in the dry area.
 Use the dehumidifier in the place where the humidity if high.
 Apply dustproof materials for ground, wall and ceiling construction.
 Equip screens for the door and windows facing outside. The outer windows
should be dust-proof.
 Clean the equipment room periodically, and clean the air filter quarterly.
 Wear the shoe covers and ES D-preventive clot hes before entering the
equipment room.
 A void constructing the equipment room near the place where the corrosive gas
concentration is high, such as a chemical plant.
 Make sure the air intake vent of the equipment room is in the perennial upwind
direction of the pollution source.
 Install the batteries into the room different from the communications equipment.
 Ask the professional institute to monitor the corrosive gas conditions.

Huawei Technologies Proprietary

B-2
Installation Manual Appendix B En vironment Requirements for
Quidway SessionEngine2200 Session Border Controller Equipment Running

B.1.2 Requirements for ESD Prevention

Although plenty of measures for ESD prevention have been taken on the device, it still
shall be cautious about static charge because it may damage the board even the
devic e when the electrostatic voltages reaches to a limit.

The absolute value of electrostatic voltage is less than 1000 V.

To meet the requirement, take the following measures in the equipment room.
 Train operators to the knowledge of ESC prevention.
 Raise the humidity to 60% or above to reduce the influence of static electricity.
 Use the antistatic floor in the equipment room. When entering the equipment
room, wear ESD-preventive shoes, work clothes, and wrist strap.
 Keep the device and the floor in good connection.
 Keep the room dust-proof.
 Place the withdrawn circuit board in antistatic workbench or antistatic bags.
 When obs erving or moving a withdrawn circuit board, touch it at the outer edge.
Do not directly touch the components on the circuit board with hands.

B.1.3 Requirements for Electromagnetic Environment

Interference sources, no matter arising from the interior or exterior of the device, are
all harmful to the device in the form of capacitive coupling, inductance coupling,
electromagnetic radiation or common-impedance coupling. To meet the
anti-interference requirement, you shall:
 Take effective measures on your power supply system to avoid interferences
from power lines.
 Use a separat e grounding or lightning proof grounding for the device and power
equipment and keep them as far away from each other as possible.
 Keep the device far away from superpower radio-transmitting station,
radar-transmitting station and HF& High-c urrent device.
 Perform electromagnetic shielding if necessary.

B.1.4 Requirements for Lightning Proof Grounding

Although plenty of lightning proof measures have been taken in the design of the
devic e, it is possible to damage the device if the lightning intensity reaches to a certain
limit.

Table B-2 lists the requirements for lightning proof grounding.

Huawei Technologies Proprietary

B-3
Installation Manual Appendix B En vironment Requirements for
Quidway SessionEngine2200 Session Border Controller Equipment Running

Table B-2 Requirements for lightning proof grounding

Items Requirements

Use the reinforc ed concrete structure for the construction of the


equipment room.
Capit al
Install the lightning proof device in the equipment room.
construction
The light ning proof grounding shares the same grounding body
with the protection grounding of the equipment room.

Use a special power transformer for the telecom offic es.


Use the metal jacket or steel tube to cover the power cables
before burying them under the ground.
Ground both ends of the metal jacket or steel tube nearby and
properly.
TN-S power
Bury the cable under the ground.
system shall be
Install a gapless zinc oxide arrester to each of the three phase
adopted.
lines at the low tension side of the AC power trans former.
Ground nearby and correctly the enclosure of the trans former, the
neutral lines at the low tension side, and the metal steel tubes of
the power cables that connect with the enclos ure of the
transformer.

Do not lead the A C/DC power cables in/out the communications


site in aerial mode.
After the low-voltage power cables is led into the equipment room,
install the lightning arrester for the power cables in the AC voltage
stabilizer and the AC power distribution panel (box). Ground the
Power cables arrester nearby and correctly.
leading in the For the equipment room built in the city, install the power supply
communication arrester with the nominal discharging current not less than 20 kA.
s site need to For the equipment room built in the suburbs subject to lightning
be equipped strike, install the power supply arrester with the nominal
with lightning discharging current larger than 60 kA.
arrester. For the equipment room in the mountain areas easily subject to
lightning strike, or in the separate high-rise buildings in the city,
install the power supply arrester with the nominal discharging
current larger than 100 kA.
The ground cable of the lightning arrester shall be one meter long
at most.

Connect the DC working ground (positive pole of the –48 V DC


power supply or the negative pole of the 24 V DC power supply )
Grounding of with the indoor collective ground cable nearby. The total ground
DC power cable shall meet the maximum load of the equipment.
distribution The power equipment must have the DC working ground cable,
which can connect the power equipment to the collective ground
cable.

Huawei Technologies Proprietary

B-4
Installation Manual Appendix B En vironment Requirements for
Quidway SessionEngine2200 Session Border Controller Equipment Running

Items Requirements

Ground all devices and auxiliary devices in the equipment room


properly.
Connect all protection ground cables to the collective protection
grounding bar.
Join all prot ection ground cables in one equipment room to one
Equipotential
protection grounding bar.
connection
Share the grounding net work for the working ground and
protection ground.
Ground the cabling racks, suspended iron supports, frames or
enclosures, metal ventilation pipe, metal windows and doors
correctly.

Never connect the neutral line of the A C power cable wit h the
protection ground of any telecom equipment in the equipment
General
room.
requirements
Never install the fus e or switch on the ground cable.
for grounding
Make all ground cables as short as possible, and arrange them as
direct as possible.

Usually, the earthing resistance of the telecommunication site


where the base station equipment is located is recommended to
be less than 10ohm. And it also should conform to the relative
stipulation of the country.
Grounding
Keep the upper end of the grounding body at least 0.7m over the
resistance
ground. In cold areas, bury the grounding body below the frozen
ground.
Measure the grounding resistance periodically to ens ure the
effective grounding.

Do not arrange the signal cables overhead in the equipment room.


All signal cables must be led int o the site below the ground.
Use the cables with metal jacket or put them into the met al pipe if
Routing of
they come out/in the equipment room.
signal cable
Keep the ground cable of the lightning arrester as short as
possible. Ground the idle lines inside the cable in the equipment
room.

Use the grounding ring or grounding bar for the collective


grounding cable.
Do not use aluminum cables as grounding cables.
Take measures to prevent electrification corrosion when
Collective
connecting different metal parts together.
grounding
Use the copper busbar as the collective groundin g cable with the
cable 2
cross-sectional area not less than 120 mm , or use the galvanized
flat steel that has the same resistance.
Insulate the collective grounding cable from the reinforcing steel
bars of the building.

Keep the grounding lead-in up to 30 meters long.


Grounding
Use the galvaniz ed flat steel with cross-sectional area of 40 mm ×
lead-in
4 mm or 50 mm × 5 mm.

Huawei Technologies Proprietary

B-5
Installation Manual Appendix B En vironment Requirements for
Quidway SessionEngine2200 Session Border Controller Equipment Running

B.2 Requirements for Power Supply

B.2.1 Requirements for AC Power Supply

The A C power supply system consists of mains, Unint errupted Power Supply (UPS)
and electric generat or set. It supplies power in an integrated mode. The low-voltage
power supply system uses three-phase five-wire mode or mono-phase three-wire
mode. Table B-3 lists the requirements for the nominal voltage and frequency of the
low-voltage A C.

Table B-3 AC voltage and frequency

Nominal voltage Rated frequency

110/127/220/380(V) 50 Hz

The network product uses the continuous power supply, such as UPS, for the AC
backup power supply. The A C backup power supply is in the same phase with the
mains. The UPS/mains switchover time is less than 10 ms, others, the equipm ent may
be restart ed or reset.

In determining the AC capacity in the equipment room, you need take int o account the
working current and fault current. Independent equipment must have an independent
AC distribution protection device. The protection switch configuration must be great er
than that of the electricity device.

In designing the DC power supply system, you need take into account the maximum
payload in dynamic and static conditions. Besides, you have to reserve the margin.
The cabling in the power distribution panel must be figured out based on the
maximum capacity of the supplied power supply payload. In this way, you can decide
the type and size of the conducting wire.

The following lists the specific requirements for the voltage of A C communications
equipment and power equipment:
 For the communications equipment adopts AC power supply, the voltage range
is: rated value-10% to rated value+5%.
 For the power equipment and important buildings, use the A C power supply. The
allowed voltage range is: rated voltage value-15% to rated voltage value+10%.
 The permitted AC frequency fluctuation ranges “frequency ±4%”. The sinusoidal
distortion rate of the voltage waveform is smaller than or equal to 5%.

The generator set shall have the following functions:

 automatic power on and off


 automatic rec ruitment

Huawei Technologies Proprietary

B-6
Installation Manual Appendix B En vironment Requirements for
Quidway SessionEngine2200 Session Border Controller Equipment Running

 remot e communication
 remot e control,
 remot e measurement
 standard interface and communication protocols.

The following lists the specific requirements for the A C and DC power cable:
 The AC neutral for communications must use the conducting wire that has the
same cross section as the phase cable.
 Select the DC power feeder according to the long-term payload. If the cross
2
section exceeds 95 mm , use the hard bus cable. If there is a great difference
between the recent and long-term payload, make the cabling by stages.
 The conducting wire is fire-resistant. Route the conducting wire according to the
local regulations, and set the low-voltage power distribution room according to
the local regulations, too.

B.2.2 Recommendations for AC Power Supply

Use the voltage-regulator in the following situations:

 When the communications equipment is powered directly by the mains, the


power supply voltage exceeds the rated voltage by –10% to +5%, or the voltage
range allowed for the communications equipment.
 When the communications equipment is not powered directly by the mains, the
mains voltage exceeds the rat ed voltage by –15% to +10%, or the AC input
voltage range allowed for the DC power equipment.

To ensure the normality of power supply, use the UPS or inverter.

Configure the generator set for the office t o ensure the normal communication in case
of mains failure. The capacity of the gen erat or set is greater than or equal to 1.5 –2
times of the continuous power supply equipment.

Connect two sets of storage batteries in parallel. There usually is only one set of UPS
battery, and a set of backup UPS battery should be configured. If the inverter or UPS
is used, select the active invert er that can provide the maximum power. A standby
inverter should be configured.

B.2.3 Requirements for DC Power Supply

Place the power equipment near the telecom equipment to make the DC feeder as
short as possible. To reduce the power consumption and installation cost, the loop
voltage drop from the battery port to the equipment port should be smaller than 3.2 V.

Use two or more independent power supply system when the office has heavy traffic
or more than two switching systems.

Huawei Technologies Proprietary

B-7
Installation Manual Appendix B En vironment Requirements for
Quidway SessionEngine2200 Session Border Controller Equipment Running

Configure multiple power supply systems in different floors for the l arge-scale office.
They supply power respectively to different equipment rooms.

Configure a centralized power room or battery room for the office wit h medium traffic,
or adopt the distributed power supply mode.

Use the integrated power supply for the o ffice with small traffic. Note to prevent the
corrosive gas released by the battery from eroding the circuit board.

Table B-4 lists the specifications for the DC power supply.

Table B-4 Specifications for the DC power supply

Item Index

Permitted range of the -48V input


–40 V to –57 V
voltage

DC power capacity to support the Greater than 1.5 times of the rated current at
surge current least

If the AC input voltage is in the range of


85%–110% of the rated value, and the load
current is in the range of 5%–100% of the rated
Regulated voltage precision value, the output voltage of the rectifier is an
integer in t he range of –46.0 V t o –56.4 V, with
the regulated voltage precision  1%.

Overshoot amplitude of switch


Integral value of the DC output voltage±5 %
on/off

Peak-to-peak noise voltage ≤200 mV

The recovery time is smaller than 200 ms.


Dynamic res ponse The overshoot is in the range of the integral
value of the DC out put voltage ±5 %.

B.2.4 Recommendations for DC Power Supply

 Adopt the dispersed power supply mode. Use multiple DC power supply systems
and set power equipment in multiple positions.
 Adopt the standard DC power supply system, and set the output voltage of the
communications equipment to fall within the required range.
 Improve the reliability of the AC power supply system, and reduce the storage
batteries. For the small offices, add more storage batteries if it is difficult to
enhance the reliability of the AC power supply system.
 The total capacity of the high-frequency switch rectifier must satisfy the power of
the communication loading and battery charging.

Huawei Technologies Proprietary

B-8
Installation Manual Appendix B En vironment Requirements for
Quidway SessionEngine2200 Session Border Controller Equipment Running

 Configure the backup rectifier modules. If there are no more than 10 active
modules, configure one backup module. If there are more than 10 active
modules, configure one backup module for every 10 active modules.
 Install the storage batteries in two or more groups. The capacity is determined by
the duration when the storage batteries supply power to the load. For most
offices, the batteries should be able to supply power for one hour at least.