Yirgalem construction Date 02/03/2015Ec, Friday

construction work of Jigjiga bypass road project


Night shift report
Assigned equipment and plate working Hr Activity loc/station Activity Total quantity Idle case
No. Equipment Typplate No Night
staring ending From To
1 Loader ZL50G 12:00 2:00 5+800 loading waste 9 Trip
1 DT 75785 12:00 2:00 waste 3 Trip
2 DT 75789 12:00 2:00 waste 3 Trip
3 DT 75787 12:00 2:00 waste 3 Trip

Assigned Man power


Operator 1 mark
Data Colector 1 Aklilu
aklilualemayehu1417@gmail.com

Ake man
Yirgalem construction
construction work of jigjiga bypass road projec
daily report
Date
Assigned Equipment type and plate no
Equipment type plate no
galem construction
k of jigjiga bypass road project

working hours
Yirgalem construction plc Date 17/02/2015 Ec Thursd
Masonry work @RHS by subcontractor :- Lulaco Subcontractor

station Quantity T/quantity


From To course Length (m) width (m) height (m) (m3)
1+950 1+960 1st,2nd CRHS 10 0.58 0.8 4.64
1+950 1+960 3rd CRHS 6.5 0.35 0.35 0.79625
0

Sum T/Q 5.43625

Equipment plate no work hr Materials type item


T/mixer 66089 3:00-3:30 stone m3
cement pcs
Assigned manpower sand m3
mason 4
DL 1
ate 17/02/2015 Ec Thursday

Quantity
5.44
13.6
1.632
From
1+950
2+270
Grand Total