TLY Site Arrangement Scope of Work

Date: Tuesday, 11 July, 2023


No. Describtion QTY Unit Duaration Material / Equipment Unit Price ($) Total Unit Price Total Start Date Finish
(Day) Price($) ($) Price($) Date
I TLY Site Preparation 2,160 sq.m.
1 Debris clearing and grass cutting

1.1 Debris truck collector (rental), removal of the excess material 12 trips 6 truck 1.5T (rental ) - - 40 480 - -

1.2 Existing Transformer relocation 8 hour 1 Lorry crane10T(rental) - - 55 440 - -

2 Warehouse installation to secure excess materials

2.1 Relocation of the toilet container and MEP material 1 container 1 Lorry crane10T(rental) - - 55 440 - -

2.2 Wherehouse installation (new fabrication of warehouse) 250 sqm 4 Steel stucture frame with pre- painted - - 15 3750 - -
G.I corrugated sheet walling and Roofing

3 Scaffolding material arrangement

3.1 Scaffolding base preparation (use existing spun pile remaining at site ) 8 hour 1 Lorry crane10T(rental) - - 55 440 - -

4 Existing Container (5-containers) arrangement

4.1 Relocation of CRP document container (3-container), Toilet container (1- container) and 16 hour 2 Lorry crane10T(rental) - - 55 1760 - -
Worker container (1-container)
5 Fabrication of concrete base for Aluminuim Formwork

5.1 Concrete Slid block (CHB) as concrete base for Aluminuim Formwork 240 nos 8 Size: 400x190x150mm thk - - 11 2640 - -

6 Direct worker

6.1 4 Person 14 According to their actual work scope 12 672 - - - -


Direct worker ( For all scope of work )
.

672.00 9,950.00
10,622.00

Prepared by: Reviewed by:: Confirm by:: Confirm by::


Mr. Chum sambath Mr. Naoaki Kumazawa Mr. Seth Kimly Ms. Jenny Chea
PAD-Senior Finishing Engineering PAD- EM HR Manager Managing Director
TLY Schedule of Site Arrangement
Date: Tuesday, 11 July, 2023
No Describtion Days
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 TLY Site Preparartion
2 Debris clearing and grass cutting
2.1 Debris truck collector (rental), removal of the excess material
2.2 Material arrangement (direct workers)
2.3 Exisiting Transformer relocation
3 Warehouse installation to secure excess materials
3.1 Relocation of the toilet container and MEP material

3.2 Wherehouse installation (new fabrication of warehouse)


4 Scaffolding material arrangement
4.1 Scaffolding base preparation (use existing spun pile remaining at site )
5 Existing Container (5-containers) arrangement
5.1 Relocation of CRP document container (3-container)
5.2 Relocation of the toilet container (1-container)
5.3 Relocation of the workers container (1-container)
6 Fabricatino of concrete base for Aluminuim Formwork (concrete base 300x300mm)

Prepared by: Reviewed by:: Confirm by:: Confirm by::


Mr. Chum sambath Mr. Naoaki Kumazawa Mr. Seth Kimly Ms. Jenny Chea
PAD-Senior Finishing Engineering PAD- EM HR Manager Managing Director
EXISTING PERIMETER FENCE WALL EXISTING PERIMETER FENCE WALL

GUARD
TOWER

Excess Matterial Excess Matterial

Old Pile
EXISTING PERIMETER FENCE WALL

Excess Matterial

DRIVEWAY

scafolding staging scafolding Staging

Excess Matterial

Storage
DRIVEWAY

WORKERS
CONTAINER-3

Move to on layer 1
CONTAINER-1layer 1
WORKERS
CRP - STORE
CONTAINER-1
CONTAINER-2 layer 1
WORKERS

CRP - STORE
CONTAINER-2
CONTAINER-3 layer 1
EXISTING PERIMETER FENCE WALL

WORKERS

CRP - STORE
CONTAINER-3

TOILET CONT.
DRIVEWAY

SECURITY CAMERA Security Post


CONTROL ROOM GUARD
HOUSE EXISTING CONCRETE LOW WALL

ENTRANCE
NEW METAL SHEET HOARDING
3.00M HIGH WITH WHITE PAINT
SIDEWALK SIDEWALK

EXISTING CURB AND GUTTER EXISTING CURB AND GUTTER

OCIC BOULEVARD

A01
EXISTING PERIMETER FENCE WALL EXISTING PERIMETER FENCE WALL

GUARD
TOWER

Move all scafolding to


this area

Need to remove All


material that damage
EXISTING PERIMETER FENCE WALL

and cant note used .

NEW METAL SHEET HOARDING


3.60M HIGH WITH WHITE PAINT

DRIVEWAY
scafolding staging

scafolding Staging

Need to remove All


Need to remove
material that damage
DRIVEWAY

Storage and cant note used .

WORKERS
CONTAINER-3

CRP - STORE
CONTAINER-3 pack
Move to 2nd Layer
Move to on layer 1
CONTAINER-1layer 1
WORKERS
CRP - STORE
CONTAINER-1
CONTAINER-2 layer 1
WORKERS

CRP - STORE
CONTAINER-2
CONTAINER-3 layer 1
EXISTING PERIMETER FENCE WALL

WORKERS

CRP - STORE
CONTAINER-3

TOILET CONT.
DRIVEWAY

SECURITY CAMERA Security Post


CONTROL ROOM GUARD
HOUSE EXISTING CONCRETE LOW WALL

ENTRANCE
NEW METAL SHEET HOARDING
3.00M HIGH WITH WHITE PAINT
SIDEWALK SIDEWALK

EXISTING CURB AND GUTTER EXISTING CURB AND GUTTER

OCIC BOULEVARD

A01
EXISTING PERIMETER FENCE WALL EXISTING PERIMETER FENCE WALL

82/62T 4B
/3 61/B
51
1.1x1.1x9.2 1.1x1.1x5.2 1.1x1.1x8.2 GUARD
TOWER

31/B
21 51/B
41 2D
/1
1.1x1.1x8.2 1.1x1.1x8.2 52.1-1.1x1.1x9.2

7
T
2/5
T
2 4
T
1/2
T
1 32/31T
52.1x1.1x9.2 1.1x1.1x9.2 52.1x1.1x9.2 o
rf aerato
p
srP
n
gd
io
lffacS
egao
rts Note :
D
5/4 A19/D3 P4/5
3/2
P
52.1x1.1x8.2 2.9x1.1x1.1 1.1x1.2x1.1
6.0x9.0x9.0

A1/4 9
P/12T 6/81
P
Top side Bottom side
6A
/5
1
52 . 1x1 . 1x58 . 2 - 52 . 1x51 . 1x9 . 2 2.45x1.1x1.25 52.1x1.1x6.1 1.1x1x1.1
EXISTING PERIMETER FENCE WALL

81A
/71 A20/21 Q5/7
52.1x1.1x9.2 2.9x1.1x1.25 2.5x1.1x1.25
T2 - T9
31A
/01 51TA
/41 61T/1T
2.7/2.6x1.1x1.25
1.1x1.1x9.2 52.1x1.1x9.2 52.1x1.1x9.2

A
9-8T 5-4T 91-51
P P16-17
1.1x1.1x9.2 1.1x1.1x9.2 52.1x1.1x2.1 1.25x1.1x1.25

1.1x1.1x9.2
32-6T
52.1x1.1x29.2
1B
-0
1 )301-457
P(A
-3
52.1x1.1x2.3 T26=Topsdie T28=Botomsdie
41
P-2T 12
P-32T 81
P-01T
52.1x1.1x9.2 52.1x1.1x7.2 52.1x1.1x5.2
DRIVEWAY

52.1x1.1x9.2
91-B
71
52.1x1.1x9.2
91-B
71
52.1x1.1x30.2
Q
6
A
-5 T26
T2-9 PP1254-1503/ P254-503 C
6-02T
2.7/2.6x1.1x1.25 3.2x1.1x1.25 52.1x1.1x9.2

A6-C2 2A
-21 C1-B19
2.5x1.1x1.25 52.1x1.1x7.2 2.5x1.1x1.25

T28
A
7-C
7 C5-4 D
6B
-5
52.1x1.1x9.2 2.9x1.1x1.25 52.1x1.1x2.2/3.2

8
PB
-7 P11
52.1x1.1x9.1 1T-C
8 P20
52.1x1.1x9.2 1.1x1x1.1 1.6x1.2x1.25

B9 P12 C3
2.75x1.1x1.25 2.5x1.2x1.25 2.9x1.1x1.25

B2 B
8A
-1
2.9x1.1x1.25
A
8D
-7
52.1x1.1x58.2/9.2 52.1x1.1x59.1

T29- T44/PP197-253/Q2 A25-57


3.4x0.2x0.07 3.4x0.2x0.07 n
gicp
aSevresR
e
DRIVEWAY

B20/B53 C9-C20/D9-D26 T46-T98


3.4x0.2x0.07 3.4x0.2x0.07 3.4x0.2x0.07

Propose Area for


Aluminuim formwork
Storage

CONTAINER-1layer 1
WORKERS
CRP - STORE
CONTAINER-1
CONTAINER-2 layer 1
WORKERS

CRP - STORE
CONTAINER-2
CONTAINER-3 layer 1
EXISTING PERIMETER FENCE WALL

WORKERS

CRP - STORE
CONTAINER-3

TOILET CONT.
DRIVEWAY

to p
srP
eW
h
o
u
sera
m
)52x01(

SECURITY CAMERA Post Guard


CONTROL ROOM GUARD
HOUSE EXISTING CONCRETE LOW WALL

ENTRANCE
NEW METAL SHEET HOARDING
3.00M HIGH WITH WHITE PAINT
SIDEWALK SIDEWALK

EXISTING CURB AND GUTTER EXISTING CURB AND GUTTER

OCIC BOULEVARD

A01

You might also like