Sr.No Description
1 Name of Site
2 Type of Project
3 Client
4 Location
5 Built-up area of Project
Sr.No Description
1 Drawings
2 Scope of work :-
As per verbal Communication with client necessary work like construction of 1 no soak
A
plumbing work for 10 toilets and bathrooms
B Civil
C Mechanical
D General
Kolwezi Date -19/08/2022
Description
SunAfrica Maintainance Work
Private PROJECT
MCS
Near by MES Plot
Maintainance Work
MES
Description Scope
Available ✓
rk :-
al Communication with client necessary work like construction of 1 no soak pit,
✓
ork for 10 toilets and bathrooms
Cleaning of site and levelling ✓
Earth work excavation as per required ✓
PCC as per required ✓
Formwork as per required ✓
RCC as per required ✓
Back filling of earth ✓
Disposal of excess soil ✓
Plumbing work for toilets and bathrooms ✓
All civil materials + MEP items supply ✓
Make hard copy of HOD's signed GFC drawing ✓
Prepare Manpower requirements and take approval of Quantity surveyor + HOD ✓
Prepare L2 or L3 work schedule and take approval of Planning Engineer + HOD ✓
Prepare list of Hiring equipment's and take approval of Quantity surveyor + HOD ✓
Prepare list of Safety equipment's and take approval of Safety Manager + HOD ✓
Prepare list of Quality testing and take approval of Quality Manager + HOD ✓
Prepare Indent and take approval of Quantity Surveyor + HOD ✓
Take budget of projects against all documents from Account and purchase department. ✓
Check water, electricity facilities of site. ✓
Freeze available materials at store and take approximate time schedule for
✓
procurements from purchase and logistic department
Start site execution. ✓
Work
Client's Scope
Mr. Satish/Mes
From : To : Ketan Sejpal & Bhatu Patil
Kolwezi
Inquiry
Ref. Site name - SunAfrica Maintainance Work
As per Site
SF4 Safety Signage Nos
Condition
ys
a 4 weeks
eeks
Category Remarks
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
Summary Of Work
Sl No Description of work/ Materials Quantity Unit
1 Construction of 1 soak pit 1 Nos
2 Plumbing work for soak pit and 10 portable toilets 1 Nos
3 Fittings of gyesor to bathrooms 5 nos 1 Nos
4 Wooden flooring works 1 Nos
1 Cement 16 Bags
2 20 mm aggregate 3 Cumt
3 Sand 1.65 Cumt
4 Hallow Blocks 400x200x200 mm 200 Nos
5 10 mm dia steel 120 Rmt
6 Wooden Battern of size 5000x200x25 mm 190 Nos
7 Wooden Battern Screws 190x4 800 Nos
8 Wire Nails 2 Kgs
9 Triplex 80 Nos
10 Carpet 230 Sqmt
11 PVC Materials
110 dia pipe 8 Nos
110 dia Y 10 Nos
110 dia Elbow 10 Nos
110 dia end cap 4 Nos
110 dia coupling 8 Nos
110 dia vent cowell 1 Nos
Solvent 1 Nos
12 UPVC Materials
1/2" pipe 7 Nos
1/2" elbow 30 Nos
1/2" brass elbow 15 Nos
1/2" Tee 15 Nos
1/2" coupling 15 Nos
1/2" brass Tee 10 Nos
1/2" FABT 10 Nos
1/2" MABT 10 Nos
1"/1/2" reducers 5 Nos
1/2" valve 12 Nos
Axe blade 3 Nos
Bib cock 20 Nos
1/2" clamps 1 Packet
Solvent 3 Nos
Screws 1 Packet
13 CPVC Fittings
1/2" elbow 5 Nos
1/2" coupling 10 Nos
1/2" Copper elbow 10 Nos
1/2" pipe 2 Nos
1/2" union 6 Nos
1/2" clamps 20 Nos
1/2" valve 10 Nos
Teflon tape 5 Nos
Angle Valve 12 Nos
Screws 40 Nos
Solvent 1 Nos
Connectors from Gyesor to pipe 12 Nos
Remarks
Sun Africa Measurements Soak Pit, plumbing works and wooden flooring
Sl No Description Nos Length Breadth Depth
1 Earth Work Excavation(3.14x3x3/4) 1 3.14 2.25 3
0.1956 Cumt
14.7 Sqmt
200 Nos
1.92 Cumt
0.85722 Cumt
60 Rmt
1.39 Cumt
184 Sqmt
10 Nos
5 Nos
Materials Calculations
Sl No Description Quantity Unit
1 PCC Materials 2.11 Cumt
Cement 2.11x3.5 7.38 Bags
20 mm aggregate 2.11x90% 1.9 Cumt
Sand 2.11x45% 0.95 Cumt
Materials Required
1 Cement 16 Bags
2 20 mm aggregate 3 Cumt
3 Sand 1.65 Cumt
4 Hallow Blocks 400x200x200 mm 200 Nos
5 10 mm dia steel 120 Rmt
6 Wooden Battern of size 5000x200x25 mm 190 Nos
7 Wooden Battern Screws 190x4 800 Nos
8 Wire Nails 2 Kgs
9 Triplex 80 Nos
10 Carpet 230 Sqmt
11 PVC Materials
110 dia pipe 8 Nos
110 dia Y 10 Nos
110 dia Elbow 10 Nos
110 dia end cap 4 Nos
110 dia coupling 8 Nos
110 dia vent cowell 1 Nos
Solvent 1 Nos
12 UPVC Materials
1/2" pipe 7 Nos
1/2" elbow 30 Nos
1/2" brass elbow 15 Nos
1/2" Tee 15 Nos
1/2" coupling 15 Nos
1/2" brass Tee 10 Nos
1/2" FABT 10 Nos
1/2" MABT 10 Nos
1"/1/2" reducers 5 Nos
1/2" valve 12 Nos
Axe blade 3 Nos
Bib cock 20 Nos
1/2" clamps 1 Packet
Solvent 3 Nos
Screws 1 Packet
13 CPVC Fittings
1/2" elbow 5 Nos
1/2" coupling 10 Nos
1/2" Copper elbow 10 Nos
1/2" pipe 2 Nos
1/2" union 6 Nos
1/2" clamps 20 Nos
1/2" valve 10 Nos
Teflon tape 5 Nos
Angle Valve 12 Nos
Screws 40 Nos
Solvent 1 Nos
Connectors from Gyesor to pipe 12 Nos
Manpower Calculations
Sl No Description No of Persons No of Days Total Persons
1 Supervisor Expert 1 15 15
2 Mason Expert 1 15 15
3 Technician Local 1 15 15
4 Technician Local plumber 1 15 15
5 Local Helpers 6 15 90
Total Manpower in mandays 150