You are on page 1of 21

Project Name : JAWA-1 Combined Cycle Gas Turbine Power Plant (1760MW

Company : PT. CIGADING HABEAM CENTRE


Work Classification : Erection And Contruction Steel Structure

Today: 30 November 2019 (Sat


Area Ac
CHC Site Office
and Lay Down CHC Prepare Material And Equipment For Erection Tb1&Tb2
Continue Bolt tightening
Load Unload Material Tb1&2
Prepare Erection
Inspection Qc Material Unload

Turbin Building #1 Load Unload Material


Continue bolt tightening ,A,B,C
Scaffold Flatform Working , Touchup Paint ,
Inspection Material
Scaffold Installation
boom extention works assembly crane 180 t

Turbin Building #2 Continue Bolt Tightening Line C,B 4-5 rafter at the point co
Load Unload Material
Scaffold Installation acsses
Material Inspection
Touch Up Paint
Continue Erection
Inspection coordinate dan padding di TB2 line 4D-E

Description
Erection TB2 SB12-6
HBR52-5
SB12-116
SB12-19
SB12-9
VBR52-2
D63-1

Erection TB1 SC14-14


SB12-8
SB12-9
SB12-116
WB13-7
1LC1-7
D56-1
D56-1
Materials
Item
SEE packing list, 0452/SCT/CHC-1/XI/2019 (weight 6,7 ton)
SEE packing list, 0453/SCT/CHC-1/XI/2019 (weight 3,6 ton)
Daily R
bined Cycle Gas Turbine Power Plant (1760MW)
G HABEAM CENTRE
Contruction Steel Structure

Work Summa
Today: 30 November 2019 (Saturday)
Activity

ial And Equipment For Erection Tb1&Tb2


tightening
Material Tb1&2
on
Material Unload

Material
ightening ,A,B,C
rm Working , Touchup Paint ,
terial
lation
n works assembly crane 180 t

Tightening Line C,B 4-5 rafter at the point connection and line B 4-5 Tier coloumn,
Material
lation acsses
ction
nt
tion
rdinate dan padding di TB2 line 4D-E

Work Progress
Unit Total Q'ty
1
2
4
1
1
3
1

1
1
1
1
2
1
1
1
Materials
Item Unit Prev.
19 (weight 6,7 ton) 1
19 (weight 3,6 ton) 1
Daily Report

Work Summarization
Tomorrow: 01 D
Area
CHC site Office
& Lay down CHC

Turbin Building #1

5 Tier coloumn, Turbin Building #2


Work Progress Quantity
Up to Last day Today Accum.
Today Accum.
Title (Job Position)
Indirect
PROJECT MANAGER
SITE MANAGER
QUALITY CONTROL
INSPECTORE SCAFFOLDER
SUPERVISOR LIFTING
SUPERVISOR ERECTION
SITE ADMIN
SURVEY + ASS
LOGISTIK
EHS SAFETY
MEKCANIC
PERMIT HOLDER
DRIVER

Sub Total

Direct
FOREMAN FITTER ERECTION
FITTER ERECTION
WELDER
RIGGER
SCAFFOLDER
SIGHYALMAN
LABOUR/HELPER
FLAGMAN
OPERATOR + ASISTEN + MECANIC

Sub Total
Total
Tomorrow: 01 December 2019 (Sunday)
Activity
cum. Progress Plan Remark
0% 100%
- 0.00% 100%
- 0.00% 100%

- 0.00%
- 0.00%
Manpower Status
On-Site (Number) Total Day time (Hour)
Day Night Prev. Prev. Today Accum.

- -
1 - 10 10
2 - 20 20
1 - 10 10
2 - 20 20
2 - 20 20
1 - 10 10
3 - 30 30
1 - 10 10
3 - 30 30
2 - 20 20
1 10
2 20

21 0 - - 210 180

2 - 20 20
14
2
1
14
6
4
4 - 40 40
13 13 13

60 0 - - 73 73
81 0 - - 283 ###
Prepared by Confirmed by Approved by

Teten H Husein H Lukman Hakim

30 November 2019

Equipments
Item On Site Prev. Today Accum.
Crane Roughter 60 t 1 1 1
Crane Roughter 50 t 1 1 1
Boom Lift 38 m 1 1 1
Boom Lift 26 m 1 1 1
Trcuk Crane TMC 1 1 1
Trailer rental - -
Genset 15 KVA 1 1 1
Genset 10 KVA 1 1 1
Boom Lift 41 m 1 1 1

Level 2 2 2
Total Station 2 2 2
Lifting gear 1 1 1
Crawler crane 90 t 1 1 1
Crane rougther 25t 1 1 1

crawler crane 180t 1 1 1


(Hour) Night Time (Hour) Total
Accum. Prev. Today Accum. Accum.

- - - - -
10 - - - 10
20 - - - 20
10 - - - 10
20 - - - 20
20 - - - 20
10 - - - 10
30 - - - 30
10 - - - 10
30 - - - 30
20 - - - 20

180 180

20 - - - 20
40 - - - 40
13 13
- -
73 - - - 73
- 0 0 0 253
5/7/2019