Project Name : JAWA-1 Combined Cycle Gas Turbine Power Plant (1760MW

Company : PT. CIGADING HABEAM CENTRE


Work Classification : Erection And Contruction Steel Structure

Today: 27 November 2019 (Wed


Area Ac
CHC Site Office
and Lay Down CHC Prepare Material And Equipment For Erection Tb1&Tb2
Bolt tightening
Load Unload Material Tb1&2
Prepare Erection
Inspection Qc Material Unload

Turbin Building #1 Load Unload Material


Continue bolt tightening
Scaffold Flatform Working , Touchup Paint ,
Inspection Material
Scaffold Installation

Turbin Building #2 Continue Bolt Tightening Line A 4-5 rafter at the point conne
Load Unload Material
Scaffold Installation acsses
Material Inspection
Touch Up Paint
Continue Erection
Continue Check verticality line 4(A,B,C) AND Line 5 (A,B,C)
after concrete line 4d and 4e

Description
Erection TB2 SG27-11
SC13-21
SC14-15
SC14-45
SC14-46

Erection TB1 Bolt tightening


Materials
Item
SEE packing list, 0446/SCT/CHC-1/XI/2019 (weight 18,2 ton)
Daily R
bined Cycle Gas Turbine Power Plant (1760MW)
G HABEAM CENTRE
Contruction Steel Structure

Work Summa
Today: 27 November 2019 (Wednesday)
Activity

ial And Equipment For Erection Tb1&Tb2

Material Tb1&2
on
Material Unload

Material
ightening
rm Working , Touchup Paint ,
terial
lation

Tightening Line A 4-5 rafter at the point connection and line B 4-5 rafter,repair washer bolt
Material
lation acsses
ction
nt
tion
ck verticality line 4(A,B,C) AND Line 5 (A,B,C) , Join survey with samsung check coordinate
e line 4d and 4e

Work Progress
Unit Total Q'ty
1
1
1
1
1
Materials
Item Unit Prev.
19 (weight 18,2 ton) 1
Daily Report

Work Summarization
Tomorrow: 28 No
Area
CHC site Office
& Lay down CHC

Turbin Building #1

ter,repair washer bolt Turbin Building #2


sung check coordinate

Work Progress Quantity


Up to Last day Today Accum.
Today Accum.
Title (Job Position)
Indirect
PROJECT MANAGER
SITE MANAGER
QUALITY CONTROL
INSPECTORE SCAFFOLDER
SUPERVISOR LIFTING
SUPERVISOR ERECTION
SITE ADMIN
SURVEY + ASS
LOGISTIK
EHS SAFETY
MEKCANIC
PERMIT HOLDER
DRIVER

Sub Total

Direct
FOREMAN FITTER ERECTION
FITTER ERECTION
WELDER
RIGGER
SCAFFOLDER
SIGHYALMAN
LABOUR/HELPER
FLAGMAN
OPERATOR + ASISTEN + MECANIC

Sub Total
Total
Tomorrow: 28 November 2019 (Thursday)
Activity
cum. Progress Plan Remark
0% 100%
- 0.00% 100%
- 0.00% 100%

- 0.00%
- 0.00%
Manpower Status
On-Site (Number) Total Day time (Hour)
Day Night Prev. Prev. Today Accum.

- -
1 - 10 10
1 - 10 10
1 - 10 10
2 - 20 20
2 - 20 20
1 - 10 10
2 - 20 20
1 - 10 10
2 - 20 20
2 - 20 20
1 10
2 20

18 0 - - 180 150

2 - 20 20
14
2
1
14
4
4
4 - 40 40
11 11 11

56 0 - - 71 71
74 0 - - 251 ###
Prepared by Confirmed by Approved by

Teten H Husein H Lukman Hakim

27 November 2019

Equipments
Item On Site Prev. Today Accum.
Crane Roughter 60 t 1 1 1
Crane Roughter 50 t 1 1 1
Boom Lift 38 m 1 1 1
Boom Lift 26 m 1 1 1
Trcuk Crane TMC 1 1 1
Trailer rental - -
Genset 15 KVA 1 1 1
Genset 10 KVA 1 1 1
Boom Lift 41 m 1 1 1

Level 2 2 2
Total Station 2 2 2
Lifting gear 1 1 1
Crawler crane 90 t 1 1 1
Crane rougther 25t 1 1 1

crawler crane 180t 1 1 1


(Hour) Night Time (Hour) Total
Accum. Prev. Today Accum. Accum.

- - - - -
10 - - - 10
10 - - - 10
10 - - - 10
20 - - - 20
20 - - - 20
10 - - - 10
20 - - - 20
10 - - - 10
20 - - - 20
20 - - - 20

150 150

20 - - - 20
40 - - - 40
11 11
- -
71 - - - 71
- 0 0 0 221