Project Name : JAWA-1 Combined Cycle Gas Turbine Power Plant (1760MW

Company : PT. CIGADING HABEAM CENTRE


Work Classification : Erection And Contruction Steel Structure

Today: 22 November 2019 (Fr


Area Ac
CHC Site Office
and Lay Down CHC Prepare Material And Equipment For Erection Tb1&Tb2

Load Unload Material Tb1&2


Prepare Erection
Inspection Qc Material Unload
Bolt tigthening Rafter tb1

Turbin Building #1 Load Unload Material


Continue Erection
Scaffold Flatform Working , Touchup Paint ,
Inspection Material
Scaffold Installation
Bolt Tightening rafer span

Turbin Building #2
Continue Bolt Tightening
Load Unload Material
Scaffold Installation
Material Inspection
Touch Up Paint
Continue Erection
Inspection koordinate angkur 4 D-E,

Description
Erection TB2 CRG13
2LC1-13
SG15
SC14-14

Erection TB1 D56-1


SB27-13
SB18-28
SB18-12
SB13-118
SB13-119
SC16-1
SC16-2
WB13-6
WB16-3
Materials
Item
SEE packing list, 0437/SCT/CHC-1/XI/2019 (weight 12,8 ton)
SEE packing list, 0436/SCT/CHC-1/XI/2019 (weight 9,6 ton)
Daily R
bined Cycle Gas Turbine Power Plant (1760MW)
G HABEAM CENTRE
Contruction Steel Structure

Work Summa
Today: 22 November 2019 (Friday)
Activity

ial And Equipment For Erection Tb1&Tb2

Material Tb1&2
on
Material Unload
Rafter tb1

Material
tion
rm Working , Touchup Paint ,
terial
lation
g rafer span

Tightening
Material
lation
ction
nt
tion
rdinate angkur 4 D-E,

Work Progress
Unit Total Q'ty
1
1
1
1

1
1
1
1
3
1
1
1
1
1
Materials
Item Unit Prev.
19 (weight 12,8 ton) 1
19 (weight 9,6 ton) 1
Daily Report

Work Summarization
Tomorrow: 23 N
Area
CHC site Office
& Lay down CHC

Turbin Building #1

Turbin Building #2
Work Progress Quantity
Up to Last day Today Accum.
Today Accum.
Title (Job Position)
Indirect
PROJECT MANAGER
SITE MANAGER
QUALITY CONTROL
INSPECTORE SCAFFOLDER
SUPERVISOR LIFTING
SUPERVISOR ERECTION
SITE ADMIN
SURVEY + ASS
LOGISTIK
EHS SAFETY
MEKCANIC
PERMIT HOLDER
DRIVER

Sub Total

Direct
FOREMAN FITTER ERECTION
FITTER ERECTION
WELDER
RIGGER
SCAFFOLDER
SIGHYALMAN
LABOUR/HELPER
FLAGMAN
OPERATOR + ASISTEN + MECANIC

Sub Total
Total
Tomorrow: 23 November 2019 (Saturday)
Activity
cum. Progress Plan Remark
0% 100%
- 0.00% 100%
- 0.00% 100%

- 0.00%
- 0.00%
Manpower Status
On-Site (Number) Total Day time (Hour)
Day Night Prev. Prev. Today Accum.

- -
1 - 10 10
1 - 10 10
1 - 10 10
2 - 20 20
2 - 20 20
1 - 10 10
2 - 20 20
1 - 10 10
3 - 30 30
2 - 20 20
1 10
2 20

19 0 - - 190 160

2 - 20 20
14
2
1
12
4
4
4 - 40 40
11 11 11

54 0 - - 71 71
73 0 - - 261 ###
Prepared by Confirmed by Approved by

Teten H Husein H Lukman Hakim

22 November 2019

Equipments
Item On Site Prev. Today Accum.
Crane Roughter 60 t 1 1 1
Crane Roughter 50 t 1 1 1
Boom Lift 38 m 1 1 1
Boom Lift 26 m 1 1 1
Trcuk Crane TMC 1 1 1
Trailer rental - -
Genset 15 KVA 1 1 1
Genset 10 KVA 1 1 1
Boom Lift 41 m 1 1 1

Level 2 2 2
Total Station 2 2 2
Lifting gear 1 1 1
Crawler crane 90 t 1 1 1
Crane rougther 25t 1 1 1

crawler crane 180t 1 1 1


(Hour) Night Time (Hour) Total
Accum. Prev. Today Accum. Accum.

- - - - -
10 - - - 10
10 - - - 10
10 - - - 10
20 - - - 20
20 - - - 20
10 - - - 10
20 - - - 20
10 - - - 10
30 - - - 30
20 - - - 20

160 160

20 - - - 20
40 - - - 40
11 11
- -
71 - - - 71
- 0 0 0 231