You are on page 1of 21

Project Name : JAWA-1 Combined Cycle Gas Turbine Power Plant (1760MW

Company : PT. CIGADING HABEAM CENTRE


Work Classification : Erection And Contruction Steel Structure

Today: 04 December 2019 (Wed


Area Ac
CHC Site Office
and Lay Down CHC Prepare Material And Equipment For Erection Tb1&Tb2
Continue Bolt tightening
Load Unload Material Tb1&2
Prepare Erection
Inspection Qc Material Unload

Turbin Building #1 Load Unload Material


Continue erection
Scaffold Flatform Working , Touchup Paint ,
Inspection Material
Scaffold Installation
continue bolting
INSPECTION VERTICALITY , AS 4-5 LINE A-C

Turbin Building #2 Continue Bolt Tightening Line 4A to 4B brace AND 5A TO 5


Load Unload Material
Scaffold Installation acsses
Material Inspection
Touch Up Paint
Continue Erection
CONTINUE Check Girder Crane Real Elevation

Description
Erection TB2 SG29-14
SG29-11
SB19-13
SB18-24
SB15-47
SG15
CRG1-4
SC14-42
VBR45-26
VBR45-25
2LC1-11

Erection TB1 VBR45-38


WB12-19
WB12-20
SB12-20
SB12-76
SB12-36
SB12-21
HRB55-93
HRB55-96
VBR45-39
VBR45-37

Materials
Item

NO MATERIAL
Daily R
bined Cycle Gas Turbine Power Plant (1760MW)
G HABEAM CENTRE
Contruction Steel Structure

Work Summa
Today: 04 December 2019 (Wednesday)
Activity

ial And Equipment For Erection Tb1&Tb2


tightening
Material Tb1&2
on
Material Unload

Material
tion
rm Working , Touchup Paint ,
terial
lation
g
VERTICALITY , AS 4-5 LINE A-C

Tightening Line 4A to 4B brace AND 5A TO 5B


Material
lation acsses
ction
nt
tion
heck Girder Crane Real Elevation

Work Progress
Unit Total Q'ty
1
1
1
1
1
1
1
1
1
1
1

2
2
2
1
1
1
1
1
1
2
2

Materials
Item Unit Prev.
Daily Report

Work Summarization
Tomorrow: 05 De
Area
CHC site Office
& Lay down CHC

Turbin Building #1

Turbin Building #2
Work Progress Quantity
Up to Last day Today Accum.
Today Accum.
Title (Job Position)
Indirect
PROJECT MANAGER
SITE MANAGER
QUALITY CONTROL
INSPECTORE SCAFFOLDER
SUPERVISOR LIFTING
SUPERVISOR ERECTION
SITE ADMIN
SURVEY + ASS
LOGISTIK
EHS SAFETY
MEKCANIC
PERMIT HOLDER
DRIVER

Sub Total

Direct
FOREMAN FITTER ERECTION
FITTER ERECTION
WELDER
RIGGER
SCAFFOLDER
SIGHYALMAN
LABOUR/HELPER
FLAGMAN
OPERATOR + ASISTEN + MECANIC

Sub Total
Total
Tomorrow: 05 December 2019 (Thursday)
Activity
cum. Progress Plan Remark
0% 100%
- 0.00% 100%
- 0.00% 100%

- 0.00%
- 0.00%
Manpower Status
On-Site (Number) Total Day time (Hour)
Day Night Prev. Prev. Today Accum.

- -
1 - 10 10
2 - 20 20
1 - 10 10
2 - 20 20
2 - 20 20
1 - 10 10
3 - 30 30
1 - 10 10
3 - 30 30
2 - 20 20
1 10
2 20

21 0 - - 210 180

2 - 20 20
15
2
2
12
6
6
4 - 40 40
13 13 13

62 0 - - 73 73
83 0 - - 283 ###
Prepared by Confirmed by Approved by

Teten H Husein H Lukman Hakim

04 Desember 2019

Equipments
Item On Site Prev. Today Accum.
Crane Roughter 60 t 1 1 1
Crane Roughter 50 t 1 1 1
Boom Lift 38 m 1 1 1
Boom Lift 26 m 1 1 1
Trcuk Crane TMC 1 1 1
Trailer rental - -
Genset 15 KVA 1 1 1
Genset 10 KVA 1 1 1
Boom Lift 41 m 1 1 1

Level 2 2 2
Total Station 2 2 2
Lifting gear 1 1 1
Crawler crane 90 t 1 1 1
Crane rougther 25t 1 1 1

crawler crane 180t 1 1 1


(Hour) Night Time (Hour) Total
Accum. Prev. Today Accum. Accum.

- - - - -
10 - - - 10
20 - - - 20
10 - - - 10
20 - - - 20
20 - - - 20
10 - - - 10
30 - - - 30
10 - - - 10
30 - - - 30
20 - - - 20

180 180

20 - - - 20
40 - - - 40
13 13
- -
73 - - - 73
- 0 0 0 253
5/7/2019