GENERAL NOTES :-

1. THIS DRAWING IS TO BE READ IN


CONJUNCTION WITH ALL OTHER
DRAWINGS AND SPECIFICATIONS
WITHIN THE PACKAGE.
2. ALL DIMENSIONS ARE IN mts &
DETAILS ARE IN mm.
3. DO NOT SCALE THIS
3000 5100 5100 5100 2100 5100 5100 5100 3000
DRAWING-WRITTEN DIMENSIONS
ARE TO BE FOLLOWED.
C1 C1 C1 C1 C1 C1 C1 C1 C1 C1

1200
4. THIS DRAWING MUST NOT BE

800
F1
F2 F2 F2 F2 F2 F2 F2 F2
F1 COPIED IN WHOLE OR PART
WITHOUT PRIOR WRITTEN
400 400
CONSENT FROM TSCCL / AECOM.
600 600
5. SHOP DRAWINGS TO BE
3700

APPROVED BY TSCCL BEFORE


EXECUTION ON SITE.
6. MOCKUP SHOULD BE PREPARED
FOR APPROVAL BY CLIENT'S
C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 (TSCCL) PRIOR TO EXECUTION.

1200
7. IN CASE OF DISCREPANCY
F2 F2 F2 F2 F2 F2 F2 F2 F2 F2
BETWEEN BOQ AND DRAWINGS,
DRAWINGS WILL TAKE
600 600 PRECEDENCE.
3700

8. ALL CONCRETE WORKS IN


ACCORDANCE WITH IS 456:2000
600 600
(REVISION 2016).
9. CONTRACTOR TO VERIFY
C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 DIMENSIONS WITH

1200
ARCHITECTURAL DRAWINGS
F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 BEFORE EXECUTION.
10. SBC CONSIDERED 18 T/M2 AT 2.4M
DEPTH, HOWEVER SOIL
CONDITION TO BE VERIFIED
3700

BEFORE EXECUTION.
400 400
600 600 11. PROVIDE A LAP LENGTH OF 50
TIMES Ø OF THE SMALLER REBAR
C1 C1 C1 C1 C1 C1 C1 C1 C1 C1
WHERE EVER REQUIRED.

1200
800

F1 F1
F2 F2 F2 F2 F2 F2 F2 F2

ALL FOOTINGS SHALL BE AT THE


CENTER OF COLUMNS

3000 5100 5100 5100 2100 5100 5100 5100 3000

PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB1

REV. DESCRIPTION DRN CHK DATE


3700

CLIENT
PB3

PB3

PB3

PB3

PB3

PB3

PB3

PB3

PB3

PB3
PB2 PB2 PB2 PB2 PB2 PB2 PB2 PB2 PB2 TIRUPATI SMART CITY
CORPORATION LIMITED

PROJECT NAME
PROPOSED CONSTRUCTION OF
3700

+0.00 FFL +0.00 FFL DORMITORY BUILDING


FOR CRICKET GROUND
PB3

PB3

PB3

PB3

PB3

PB3

PB3

PB3

PB3

PB3
AT GOLLALAVANIGUNTA
9th Floor,
PB2 PB2 PB2 PB2 PB2 PB2 PB2 PB2 PB2 Infinity Tower C
DLF Cyber City,
DLF Phase II
Gurgaon 122002
Haryana, India
T: +91 124 2816000
F: +91 124 2816008
www.aecom.com
3700

SHEET TITLE
PB3

PB3

PB3

PB3

PB3

PB3

PB3

PB3

PB3

PB3
LAYOUT PLAN FOR FOOTINGS,
COLUMNS AND PLINTH BEAMS
PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB1

SCALE DATE RELEASED FOR


30-03-2022
DRAWN. BY : GGK NORTH FOR TENDER
CHKD. BY : CVR REVIEW
APPD. BY : BT SIZE A2 GFC
STATUS
AS BUILT

DRAWING NUMBER REV


R 0
ACM-TSC-GG-DB-DWG-ST-2001