FACILITIES PRIOR TO IMPLAMENTATION.
2. MAINTAIN STANDARD SEPARATION W/ OTHER PUBLIC FACILITIES
3. TYPE OF SURFACE: ASPHALT EARTH
4. BREAK EXISTING HANDHOLE/MANHOLE WINDOW WITH EXTRA CARE AND RE-INFORCE WITH
PVC/PEC/PE DUCTS AS SHOWN.
5- FOR EXISTING MANHOLE:
ALL NEW MORE THAN TWO DUCTS MUST BE IN CONCRETE ENCASED AND DEPTH OF 1.0Mm TRENCH.
6. FOR NEW MINI MANHOLE:
ALL NEW DUCT ROUTE SHOULD BE BURIED AND DEPTH OF TRENCH 0.45m - 0.90m X 0.2m
7. ALL DUCTS SHAL BE CONCRETE ENCASED BURIED.
8. ALL DUCTS SHALL BE PLUGGED AND PROVIDED WITH PULLING ROPE.
9. DEPTH OF TRENCH 1.0m 0.9m 0.45 - 0.6m
10. PLACE:
MSAN BASE CABINET BASE CABINET SHELL PROTECTION POST
SMALL MANHOLE MANHOLE HANDHOLE
11. REMOVE:
MSAN BASE CABINET BASE CABINET SHELL PROTECTION POST
SMALL MANHOLE MANHOLE HANDHOLE
12. COORDINATE WITH ACCESS NETWORK DEPT. PRIMARY SECTION. IF ANY DEVIATION IN THE PLAN
WITH FIELD SITUATION PRIOR TO IMPLEMENTATION.
13. FOR MORE DETAILS SEE STTP : PR-1412-711.
14. OTHER DETAILS NOT SHOWN FOR CLARITY.
15. PLAN NOT TO SCALE.
STC CONSTRUCTION DEPARTMENT INFORMATION
6 5 COMPANY NAME
6HDPE-110mm-20m
4 3 TELEPHONE NUMBER MOBILE NUMBER TELEPHONE NUMBER
2PEC/5SD-20m
20m
PREVIOUS JOB DEPENDANCY
2 1 CIVIL JOB
FIBER JOB
PRIMARY JOB
FIBER JOB
PGS JOB
OUTDOOR CABINET
BICS CASE
JUBBAH/611-42-000
QUALITY CHECK EXCH/SITE NUMBER SHEET No.