You are on page 1of 1

SAUDIARAMCO.

NOTES (CONT'D)
NOTES:

8.THIS DRAWING IS PRELIMINARY AND IS ISSUED FOR


PROJECT PROPOSAL PHASE ONLY. HIGHER REVISION
NUMBER SHALL BE APPLIED DURING DETAIL DESIGN
STAGE.

9.EXISTING FIRE ALARM CONTROL PANEL (FACP) IS


PROPOSED TO BE REPLACED WITH A NEW FIRE

OF
SUPPRESSION CONTROL PANEL (FSCP).

CONSENT
10.EXISTING POWER SOURCE OF FIRE ALARM CONTROL
PANEL SHALL BE UTILIZE TO FEED THE NEW FIRE
SUPPRESSION CONTROL PANEL.

11.FOR CIRCUIT NUMBER FEEDING THE NEW FIRE


SUPPRESION CONTROL PANEL (FSCP), REFER TO

TTEN
PANELBOARD SCHEDULE DWG. NO. DA-727734.
6. UTILIZED THE EXISTING SPARE CONDUIT SLEEVES
FOR THE NEW CABLE ENTRY TO MCC BUILDING.

WRI
2
12.NEW SET OF CABLE (3CX4MM - XLPE/CU/PVC )
INSIDE 1/2-" CONDUIT ASSOCIATED WITH COMPLETE 7. CLOUDED PORTION INDICATES THE SCOPE OF
ACCESSORIES WILL BE USE DURING INSTALLATION. JO-10-03094-0001.

THE
13.ALL WIRES SHALL BE INSTALLED AS PER
SAES-P-104. SIZES, CONDUCTOR MATERIALS AND

THOUT
INSULATION TYPE SHALL BE IN ACCORDANCE WITH
SAES-P104 AND NEC 760.49.

WI NG
DRAWI
LEGEND

S
THI
SCOPE UNDER
J.O. 10-00844-001

FROM
LOW VOLTAGE CONDUIT WIRE

NED
2
3C-4MM XLPE/CU/PVC

OBTAI
FIRE SUPPRESSION CONTROL PANEL
(FSCP)

BE
EXISTING LIGHTING PANEL
K06-LP-B

PART,SHALL
FACP FIRE ALARM CONTROL PANEL

N
I
FULL,OR
N
I ON
REPRODUCTI
SAUDIARAMCO.NO
K06-FSCP-004 DRAWING CONTROL (JO-10-03094-0001) HD-312311
SEE NOTE 9 & 10
U/G POWER DISTRIBUTION PLAN DA-700838

DRAWING CONTROL (JO-10-00844-0001) PD-00ADCL

ELECTRICAL PANEL SCHEDULE DA-727734

PC-4595 SEE DETAIL-1


NOTE-6 5

OF
PROPERTY
40
PC-4595

189

SOLE
600
40 188

SPARE EXISTING

THE
CONDUIT SLEEVES
F.F.

ARE N
HEREI
0 1.0 2.0 3.0 4.0 5.0

242 182 METERS

NED
SCALE: 1 : 50M
184 40

CONTAI
REVISION VALIDATION

THIS REVISION NO. IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


F.G.
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

ON
610

NFORMATI
40 72 75 DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

SEE DWG. DA-700838 SH. 001


REV.NO. DATE REVISION DESCRIPTION
FOR CONTINUATION

I
0A3 07/01/21 ISSUED FOR 100% - PP
40 204 311

THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-00844-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED

DETAIL-1
SAUDI ARABIAN OIL COMPANY

AND
STUB-UP DETAIL DRAWING TYPE

ELECTRICAL POWER PLAN EPD


(THIS DWG.)

NG
4160V SWITCHGEAR BUILDING NO. 4162

DRAWI
EAST/WEST PIPELINE PUMP STATION #3

YANBU SAUDI ARABIA

S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

THI
K06 P DA-727739 005 0A3
Saudi Aramco 2615 ENG. (05/05)

RESTRICTED HYBRID CADD-01