Professional Documents
Culture Documents
NOTES:
OF
PROPOSED TO BE REPLACED WITH A NEW FIRE
SUPPRESSION CONTROL PANEL (FSCP).
CONSENT
3.EXISTING POWER SOURCE OF FIRE ALARM CONTROL
PANEL SHALL BE UTILIZE TO FEED THE NEW FIRE
SUPPRESSION CONTROL PANEL.
TTEN
SUPPRESION CONTROL PANEL (FSCP), REFER TO
PANELBOARD SCHEDULE DWG. NO. DA-728844.
WRI
2
4.NEW SET OF CABLE (3CX4MM - XLPE/CU/PVC )
INSIDE 1/2-" CONDUIT ASSOCIATED WITH COMPLETE
THE
ACCESSORIES WILL BE USE DURING INSTALLATION.
THOUT
SAES-P-104. SIZES, CONDUCTOR MATERIALS AND
INSULATION TYPE SHALL BE IN ACCORDANCE WITH
SAES-P104 AND NEC 760.49.
WI NG
LEGEND
DRAWI
SCOPE UNDER
S
THI
J.O. 10-00844-001
FROM
LOW VOLTAGE CONDUIT WIRE
2
3C-4MM XLPE/CU/PVC
NED
FIRE SUPPRESSION CONTROL PANEL
(FSCP)
OBTAI
EXISTING LIGHTING PANEL
K13-LP-B
BE
FACP FIRE ALARM CONTROL PANEL
PART,SHALL
N
I
FULL,OR
N
I ON
REPRODUCTI
PC-4737
FIRE ALARM
CONTROL PANEL NEW
TO K13--LPB-23
SAUDIARAMCO.NO
DRAWING CONTROL (BI-10-00493-0001) VD-688132
SCOPE OF WORK VE-688133
CABLE AND CONDUIT SCHEDULE VD-688358
K13-FSCP-004
SEE NOTE 2 & 3 DRAWING CONTROL (JO-10-00844-0001) PD-00ADCL
OF
PROPERTY
SOLE
THE
ARE N
HEREI
0 1.0 2.0 3.0 4.0 5.0
METERS
NED
SCALE: 1 : 50M
CONTAI
REVISION VALIDATION
ON
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
0A3 07/01/21 ISSUED FOR 100% - PP
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-00844-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
4160V SWITCHGEAR BUILDING NO. 4162
DRAWI
EAST/WEST PIPELINE PUMP STATION #10
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
K13 P DA-728849 005 0A3
Saudi Aramco 2615 ENG. (05/05)