You are on page 1of 1

SAUDIARAMCO.

NOTES:
1.EXISTING CIRCUIT BREAKER FEEDING THE EXISTING
HALON / FIRE ALARM CONTROL PANEL SHALL BE
REPLACE BY THE NEW CIRCUIT BREAKER (20AT) FOR
THE NEW FIRE SUPPRESION CONTROL PANEL AND
MUST BE IDENTIFIED IN RED COLOR ON BREAKER
HANDLE WITH PERMANENT LABEL IN ACCORDANCE
TO NEC 760 AND NFPA 72.

OF
2.CIRCUIT WIRING FOR NEW FIRE SUPPRESSION CONTROL
PANEL SHALL BE REPLACED AND INSTALL WITH A

CONSENT
NEW SET OF WIRES.

TTEN
WRI
THE
THOUT
WIS
THI
FROMNG
DRAWI
LEGEND

SPARE SPARE

NED
- SCOPE UNDER J.O. BI-10-00844-0001

OBTAI
SPARE

BE
PART,SHALL
SPARE

N
I
FULL,OR
N
I ON
REPRODUCTI
NEW FIRE ALARM PANEL

SAUDIARAMCO.NO
SPARE

SPARE

FIRE SUPPRESSION CONTROL 1000 {20mm 3x4.0


PANEL (FSCP) K05-FSCP-002 30 K05-CP-104

OF
(UCP)

PROPERTY
DRAWING CONTROL (BI-10-00493) VD-688132
SCOPE OF WORK VE-688133
ELECTRICAL POWER PLAN VA-688165.003
CABLE AND CONDUIT SCHEDULE VA-688166.001

SOLE
DRAWING CONTROL FOR BI-10-00844-0001 PD-00ADCL

THE
ARE N
HEREINED
SCALE:

CONTAI
REVISION VALIDATION

THIS REVISION NO. IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

ON
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

REV.NO. DATE REVISION DESCRIPTION

I
0A3 07/01/21 ISSUED FOR 100% - PP

THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-00844-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY

AND
DRAWING TYPE

120 VAC SERVICE PANEL SCHEDULE SCH

NG
(ACD1) 480V MCC-VE-10-202-02 VAN #2

DRAWI
EAST/WEST PIPELINE PUMP STATION #2

YANBU SAUDI ARABIA

S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

THI
K05 P DA-703277 005 0A3
Saudi Aramco 2615 ENG. (05/05)

RESTRICTED HYBRID CADD-01

You might also like