GENERAL NOTES:

PROJECT U.T.M.
GRID
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE
NORTH
NORTH SPECIFIED.
2. POWER SUPPLY SECURITY SYSTEM TO BE TAKEN FROM
NEAREST POWER SOURCES (UPS) (UN-INTERRUPTED
15° POWER SUPPLY).
3. MINIMUM SIZE OF PVC / EMT / RGS FLEXIBLE CONDUIT
SHALL BE 3/4 INCH.
4. ALL CABLES AND DEVICES SHALL BE LABELED IN
ACCORDANCE WITH THE RELEVANT EIA/TIA
KK
AH SPECIFICATIONS.
MA
5. MAXIMUM 3 DATA CABLE TO BE PULL FROM 3/4" CONDUIT.
6. NETWORK SWITCH SHALL BE PLACED IN IT & FILED
EQUIPMENT CABINET.
7. ALL OUTDOOR UNDER GROUND CABLES SHOULD BE
INSTALLED IN PVC SLEEVES.
CCTV SYSTEM:
1. ALL CAMERAS AND ACCESS CONTROL PANEL SHALL BE
CONNECTED TO POE NETWORK SWITCH.
2. ALL DATA CABLING WILL BE DONE WITH CAT-6 CABLE FOR
CCTV AND SEPARATE CABLES TO BE CONSIDER FOR
EQUIPMENT CONNECTION.
3. MAXIMUM DISTANCE OF CAMERA FROM NETWORK SWITCH
SHALL BE MAXIMUM 90 METERS.
4. CCTV IP CAMERA WILL BE POWERED THROUGH IP BASED
POE SWITCH.
5. OUTDOOR FIXED CAMERA SHALL BE INSTALLED WITHIN 5
METER FROM THE FLOOR LEVEL.
6. OUTDOOR RATED CABLE TO BE USED IN OUTDOOR AREA.
7. FIBER OPTIC CABLING TO BE DONE FOR NETWORK

2830 MM COMMUNICATION.
SECURITY EQUIPMENT ROOM:
1. 2ALL SECURITY EQUIPMENT SHALL BE PLACED IN
EQUIPMENT ROOM.
2. 3 DISPLAY OF VIDEOS AND ALARMS EVENTS SHALL BE
PROVIDED IN GUARD ROOM.

375 MM
SECURITY SYSTEM LEGENDS
L-1
HEAT DETECTOR
L-1
SMOKE DETECTOR
L-1

SMOKE DETECTOR
1400 MM
FIRE ALARM CONTROL PANEL

DEVICE CONTROL MODULE

1940 MM
1700 MM
1430 MM ADDRESS BUTTON

MAIN CYLINDER
1400 MM
1270 MM
FIRE BELL

HEIGHT OF THE ROOM 2350MM SOUNDERS & FLASHING LIGHT

635 MM
ZONE
1635 MM
L-1

U.T.M.

325 MM
WAREHOUSES GRID
NORTH

LOCATION

15°
PROJECT
NORTH

2670 MM 42 41 40 39 38 37 36 35 34

MA
KK
AH
L
K
J
I
H
G
F
E
D
C
B

KEY PLAN

REVISION:

00 05/05/2022 ISSUED FOR APPROVAL. -

REV. DATE DESCRIPTION OF REVISION APP.

DRAWN BY: DESIGNED BY: REVIEW BY: APPROVED BY: DATE:

AQM AQM SAM/MM AMH 05/05/2022

PROJECT

CCTV CAMERA FOR


DACO WAREHOUSES
CLIENT:

CONTRACTOR:

ENLARGE AREA OF FM 200 LAYOUT WAREHOUSE 10


DRAWING TITLE:

WAREHOUSE-10
FIRE SYSTEM GENERAL LAYOUT
( MAIN PLAN SHEET 02 OF 02)

PROJECT NUMBER DRAWING NUMBER SHEET REV.


DACP-SS01
002
SCALE (A1)
WH10-FSYS-GN-XX0001 01