Walls
Element Sub-Element Room name Room number Function Floor Base-Board Ceiling Notes Legend
North East South West
1 Public Areas
1 Public Areas 1 Food & Beverage 1 Counter Space Food & Beverage Sales Counter and back counter F9 B4 * * * * * * Finishes to be specified by Interior Design
F1 Carpet
F9 B4 W1 W1 W1 W1 C1
1 Public Areas 1 Food & Beverage 2 Support Function Food & Beverage support functions (Kitchen, Shelving,..) F2 Sheet Vinyl Floor/Linoleum
1 Public Areas 1 Food & Beverage 3 Storage Food & Beverage storage
F9 B4 W1 W1 W1 W1 C3
F3 Non Static Sheet Vinyl
F4 Sheet Vinyl Floor (cushioned back)
Retail space with wall display and shelving for display and
1 Public Areas 2 Retail 1 Boutique sales of merchandise. * * * * * * * F6 Floating dance floor
*Finishes to be specified by Interior Design
1 Public Areas 2 Retail 2 Fitting Room For patrons to try on clothing items * * * * * * * *Finishes to be specified by Interior Design
F7 Vinyl Composite Tile (VCT)
1 Public Areas 2 Retail 3 Storage Storage for boutique F2 B2 W1 W1 W1 W1 C6 F8 Ceramic Tile
1 Public Areas 2 Retail 4 Kiosk Satellite counter for quick sales * * * * * * * *Finishes to be specified by Interior Design
F9 Quarry Tile
F10
Exposed Concrete w/ Sealer or Epoxy paint
1 Public Areas 3 Lobby F11 Battleship Linoleum
Part of the front of house area of the theatre in which the
1 Public Areas 3 Lobby 1 Patron Lobby
audience may congregate or use services before the show * * * * * * * F12 Flat Plate
and/or at intermission. *Finishes to be specified by Interior Design
1 Public Areas 3 Lobby 2 Cloak Room Patron coat storage during the show * * * * * * * *Finishes to be specified by Interior Design
F13 Exposed Floor structure/Grating
F8 B3 W3 W3 W3 W3 C1
1 Public Areas 3 Lobby 3 Restrooms For patron use
1 Public Areas 3 Lobby 4 Terrace Exterior lobby space n/a n/a n/a n/a n/a n/a n/a
1 Public Areas 4 VIP Room 2 Cloak Room VIP Coat storage * * * * * * * *Finishes to be specified by Interior Design
B2 Vinyl
1 Public Areas 4 VIP Room 3 Restrooms For VIP patron use F8 B3 W3 W3 W3 W3 C1 B3 Ceramic tile
1 Public Areas 4 VIP Room 4 Kitchen Food preperation area for VIP functions * * * * * * * *Finishes to be specified by Interior Design
B4 Quarry Tile
1 Public Areas 4 VIP Room 5 Storage General VIP room storage F2 B2 W1 W1 W1 W1 C6 B5 3mm Thick painted Steel Plate
B6 Wall material is continued to the floor
2 Office F1 B1 W1 W1 W1 W1 C2 Wall
1 Public Areas 5 Ticketing 3 Box Office Point of sale where patrons can buy tickets * * * * * * * *Finishes to be specified by Interior Design
W1 Gypsum Board Painted
W2 Acoustical Panels
6 Building access W3 Ceramic Tile
Area at theatre main entrance where patrons can be dropped
n/a n/a n/a n/a n/a n/a n/a
1 Public Areas 6 Building access 1 Drop Off Area off by taxi or other. W4 Concrete or CMU painted
Acoustical Insulation (black) covered with
n/a n/a n/a n/a n/a n/a n/a
1 Public Areas 6 Building access 2 Parking Car park for patrons. W5 expanded metal (black)
W6 Stainless steel panels (elevators)
Sub-Total 1 (sub-elements
1 Public Areas 1.1 to 1.7)
1 Public Areas 7 Circulation 2 Stairs Patron vertical access. * * * * * * * *Finishes to be specified by Interior Design
C2 2'x2' or 2'x4' Acoustical Lay-in Tile
Production Service
M:\VP_Prod (Bureau)\Theatre Projects\Projects - Theatre\Studies\Brazil\Rio_de_Janeiro\Drawings\PDF\2008-10-16_Scedule_finishes_for_Pricing\Typical Schedule of Finishes (BOH).xls Page 1 of 7
RIO- THEATRE SCHEDULE OF FINISHES DRAFT - FOR INFORMATION ONLY
October 17th, 2008 CONTACT CIRQUE FOR FURTHER INFORMATION
Walls
Element Sub-Element Room name Room number Function Floor Base-Board Ceiling Notes Legend
North East South West
2 Auditorium
2 Auditorium 1 Seating Area where the patrons sit to watch the performance/show.
Sub-Total 1 (sub-element
1.1)
2 Auditorium 2 Circulation
2 Auditorium 2 Circulation 1 Stairs Stairs within Auditorium space F1 B6 W2 / * W2 / * W2 / * W2 / * * *Finishes to be specified by Interior Design
2 Auditorium 2 Circulation 2 Corridors F1 B6 W2 / * W2 / * W2 / * W2 / * * *Finishes to be specified by Interior Design
An open passageway running parallel to the seating rows
2 Auditorium 2 Circulation 3 Cross-Aisle allowing to access the aisles. F1 B6 W2 / * W2 / * W2 / * W2 / * * *Finishes to be specified by Interior Design
An open passageway between areas of seating providing
2 Auditorium 2 Circulation 4 Aisle access to the seats in an auditorium. F1 B6 W2 / * W2 / * W2 / * W2 / * * *Finishes to be specified by Interior Design
Auditorium entrance or exit up through banked seating from
2 Auditorium 2 Circulation 5 Vomitory below. F1 B6 W2 / W2 / W2 / W2 /
* * * * * *Finishes to be specified by Interior Design
3 Performance Spaces
F11 B2 W1 / W5 W1 / W5 W1 / W5 W1 / W5 C3/C5
3 Performance spaces 1 Stage 1 Stage Main stage floor area, excluding lifts and traps
Sections of the stage floor which can be raised and /or
F11 - W1 / W5 W1 / W5 W1 / W5 W1 / W5 C3/C5
3 Performance spaces 1 Stage 2 Lifts lowered by mechanical means.
Sections of the stage floor which can be opened either
F11 - W1 / W5 W1 / W5 W1 / W5 W1 / W5 C3/C5
3 Performance spaces 1 Stage 3 Trap mechanically or manually
Part of the stage which projects from the proscenium (or the
3 Performance spaces 2 Forestage main stage) into the auditorium.
F11 B2 W1 / W5 W1 / W5 W1 / W5 W1 / W5 C3/C5
3 Performance spaces 2 Forestage 1 Forestage Forestage floor area excluding lifts and traps.
Sections of the stage floor which can be raised and /or
F11 - W1 / W5 W1 / W5 W1 / W5 W1 / W5 C3/C5
3 Performance spaces 2 Forestage 2 Lifts lowered by mechanical means.
Sections of the stage floor which can be opened either
F11 - W1 / W5 W1 / W5 W1 / W5 W1 / W5 C3/C5
3 Performance spaces 2 Forestage 3 Trap mechanically or manually
The back and sides of the stage which cannot be seen by the
3 Performance spaces 3 Wings audience
The upstage area of the stage (part of the stage furthest from F10 B2 W1 / W5 W1 / W5 W1 / W5 W1 / W5 C3/C5
3 Performance spaces 3 Wings 1 Rear Stage Wings the audience) which cannot be seen by the audience.
Wing area on left side of stage as seen from the actors point
F10 B2 W1 / W5 W1 / W5 W1 / W5 W1 / W5 C3/C5
3 Performance spaces 3 Wings 2 Stage Left Wings of view.
Wing area on right side of stage as seen from the actors point
F10 B2 W1 / W5 W1 / W5 W1 / W5 W1 / W5 C3/C5
3 Performance spaces 3 Wings 3 Stage Right Wings of view.
A route leading from one side of the stage to the other, out of
3 Performance spaces 4 Crossover the Audiences view, generally far upstage.
F10 B2 W1 / W5 W1 / W5 W1 / W5 W1 / W5 C3/C5
Production Service
M:\VP_Prod (Bureau)\Theatre Projects\Projects - Theatre\Studies\Brazil\Rio_de_Janeiro\Drawings\PDF\2008-10-16_Scedule_finishes_for_Pricing\Typical Schedule of Finishes (BOH).xls Page 2 of 7
RIO- THEATRE SCHEDULE OF FINISHES DRAFT - FOR INFORMATION ONLY
October 17th, 2008 CONTACT CIRQUE FOR FURTHER INFORMATION
Walls
Element Sub-Element Room name Room number Function Floor Base-Board Ceiling Notes Legend
North East South West
Sub-Total 1 (sub-element
3.1 to 3.5)
4 Production Areas
4 Production Areas 1 Carpentry Shop For maintenance and repair of wooden elements
4 Production Areas 1 Carpentry Shop 1 Carpentry Shop Main shop area F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
4 Production Areas 1 Carpentry Shop 2 Spray Booth Small well-ventilated room for use of paint and toxic materials
4 Production Areas 1 Carpentry Shop 3 Storage For carpentry shop materials and equipment F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
4 Production Areas 2 Metal Shop 3 Storage For metal shop materials and equipment F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
4 Production Areas 3 Prop Shop 1 Prop Shop Main shop area
F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
4 Production Areas 3 Prop Shop 2 Spray Booth Small well-ventilated room for use of paint and toxic materials
4 Production Areas 3 Prop Shop 3 Storage For prop shop materials and equipment F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
F2 B2 W1 W1 W1 W1 C2
4 Production Areas 4 Shoe Shop 2 Spray Booth Small well-ventilated room for use of paint and toxic materials
4 Production Areas 4 Shoe Shop 3 Storage For shoe shop materials and equipment F2 B2 W1 W1 W1 W1 C2
4 Production Areas 5 Costume Shop Workshop for costume repair storage and washing
4 Production Areas 5 Costume Shop 1 Costume Shop Main shop area F4 B2 W1 W1 W1 W1 C2
4 Production Areas 5 Costume Shop 2 Fitting Room Costume fittings F4 B2 W1 W1 W1 W1 C2
F4 B2 W1 W1 W1 W1 C2
Area within costume shop equiped with sinks, washers and
4 Production Areas 5 Costume Shop 3 Laundry Room dryers for washing the costumes
4 Production Areas 5 Costume Shop 4 Office Office for Head of Department F4 B2 W1 W1 W1 W1 C2
4 Production Areas 6 Lighting Shop 2 Storage For lighting shop materials and equipment F3 B2 W1 W1 W1 W1 C2
4 Production Areas 7 Automation Shop 2 Storage For automation shop materials and equipment F3 B2 W1 W1 W1 W1 C2
Production Service
M:\VP_Prod (Bureau)\Theatre Projects\Projects - Theatre\Studies\Brazil\Rio_de_Janeiro\Drawings\PDF\2008-10-16_Scedule_finishes_for_Pricing\Typical Schedule of Finishes (BOH).xls Page 3 of 7
RIO- THEATRE SCHEDULE OF FINISHES DRAFT - FOR INFORMATION ONLY
October 17th, 2008 CONTACT CIRQUE FOR FURTHER INFORMATION
Walls
Element Sub-Element Room name Room number Function Floor Base-Board Ceiling Notes Legend
North East South West
4 Production Areas 8 Rigging Shop 2 Storage For rigging shop materials and equipment F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
4 Production Areas 10 Sound Shop 2 Storage For sound shop materials and equipment F3 B2 W1 W1 W1 W1 C2
F3 B2 W1 W1 W1 W1 -
4 Production Areas 11 Control Rooms 2 Sound Booth Sound operator location and equipment
F3 B2 W1 W1 W1 W1 C2
4 Production Areas 11 Control Rooms 3 Monitor Room Sound monitor operation location and equipment
F3 B2 W1 W1 W1 W1 C2
4 Production Areas 11 Control Rooms 4 Projection Booth Area for projectors and projection equipment
F3 B2 W1 W1 W1 W1 C2
4 Production Areas 11 Control Rooms 5 Automation Room
Additional Control
4 Production Areas 11 Control Rooms 6 Rooms
* * * * * * *
*Finishes to be determined according to control room type
Theatrical
4 Production Areas 12 equipment rooms
F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
4 Production Areas 12 Equipment room 1 Hydraulic Room Stage lift hydraulic equipment room
F10 B2 W1 W1 W1 W1 C3
4 Production Areas 12 Equipment room 2 Dimmer Room Room containing the theatrical dimmer systems
Sound Equipment Controlled temperature room where amplifiers, audio
F3 B2 W1 W1 W1 W1 C2
4 Production Areas 12 Equipment room 3 Room equipment room etc. are stored
- - - - - - -
4 Production Areas 13 Overhead structure 5 Counterweight Wall Space dedicated to the counterweight flying system
Front of house vertical lighting position (predominently
4 Production Areas 13 Overhead structure 6 Box Boom sidelight). F12 / F1 - W5 W5 W5 W5 C3
Production Service
M:\VP_Prod (Bureau)\Theatre Projects\Projects - Theatre\Studies\Brazil\Rio_de_Janeiro\Drawings\PDF\2008-10-16_Scedule_finishes_for_Pricing\Typical Schedule of Finishes (BOH).xls Page 4 of 7
RIO- THEATRE SCHEDULE OF FINISHES DRAFT - FOR INFORMATION ONLY
October 17th, 2008 CONTACT CIRQUE FOR FURTHER INFORMATION
Walls
Element Sub-Element Room name Room number Function Floor Base-Board Ceiling Notes Legend
North East South West
Area below the stage used for movement and storage of
F10 B2 W4 W4 W4 W4 C3
4 Production Areas 14 Understage 1 Understage scenic and technical equipement during the show.
Space within understage area at a lower level into which stage
4 Production Areas 14 Understage 2 Lift Pit lift machinery is installed. F10 B6 W4 W4 W4 W4 C3
F10 B6 W6 W6 W6 W6 C4
4 Production Areas 15 Materials Handling 1 Freight Elevator Hign load, large size elevator for technical functions
F10 B2 W4 W4 W4 W4 C3
4 Production Areas 15 Materials Handling 2 Loading Dock Truck parking area for unloading of materials into the theatre.
4 Production Areas 15 Materials Handling 3 Handling Area Transition zone to handle materials and equipment F10 B2 W4 W4 W4 W4 C3
5 Staff Areas
Administrative
5 Staff areas 1 Offices-CDS CDS administrative staff offices
F1 B1 W1 W1 W1 W1 C2
5 Staff areas 3 Artistic Offices 1 Artistic Coordinator
F1 B1 W1 W1 W1 W1 C2
5 Staff areas 3 Artistic Offices 2 Stage Management Includes General Stage Manager and Stage management staff
Heads of Departments F2 B2 W1 W1 W1 W1 C2
5 Staff areas 4 Technical Offices 1 Offices Offices for the heads of departments
5 Staff areas 5 Non CDS Offices 1 Theatre Operator Theatre operation's staff offices F1 * B1 * W1 * W1 * W1 * W1 * C2 * *Finishes to be validated with Partner
5 Staff areas 5 Non CDS Offices 2 Staff F.O.H. Front of House (F.O.H.) staff areas F2 * B2 * W1 * W1 * W1 * W1 * C2 * *Finishes to be validated with Partner
F2 * B2 * * * * * C2 *
5 Staff areas 5 Non CDS Offices 3 Break room W1 W1 W1 W1 *Finishes to be validated with Partner
Production Service
M:\VP_Prod (Bureau)\Theatre Projects\Projects - Theatre\Studies\Brazil\Rio_de_Janeiro\Drawings\PDF\2008-10-16_Scedule_finishes_for_Pricing\Typical Schedule of Finishes (BOH).xls Page 5 of 7
RIO- THEATRE SCHEDULE OF FINISHES DRAFT - FOR INFORMATION ONLY
October 17th, 2008 CONTACT CIRQUE FOR FURTHER INFORMATION
Walls
Element Sub-Element Room name Room number Function Floor Base-Board Ceiling Notes Legend
North East South West
F4 B2 W1 W1 W1 W1 C2
5 Staff areas 6 Physiotherapy 1 Treatment Room Artist treatment area
5 Staff areas 6 Physiotherapy 2 Offices Physiotherapy staff F4 B2 W1 W1 W1 W1 C2
5 Staff areas 6 Physiotherapy 3 Exam Room Examinations room F4 B2 W1 W1 W1 W1 C2
4 Storage Physiotherapy equipment storage F2 B2 W1 W1 W1 W1 C2
For first response to any emergency situation for crew, staff
5 Staff areas 6 Physiotherapy 5 First Aid and artists. F2 B2 W1 W1 W1 W1 C2
F10 / F5 or F6 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
5 Staff areas 7 Training room 1 Training Room Room reserved for training of artists
5 Staff areas 7 Training room 2 Storage Training equipment storage F2 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
Multipurpose training space for artists seperate from training
F6 B2 W1 W1 W1 W1 C3
7 Training room 3 Dance Studio room
5 Staff areas 7 Training room 4 Office Office space for coaches F2 B2 W1 W1 W1 W1 C2
F8 B3 W3 W3 W3 W3 C1
5 Staff areas 8 Dressing rooms 3 Restrooms Toilets for artists
5 Staff areas 11 Green Room Room for artist and crew to meet and relax.
F2 B2 W1 W1 W1 W1 C2
5 Staff areas 11 Green room 1 Internet Corner Area with tables and computers for artists internet access
5 Staff areas 11 Green room 2 Dining Area Area with tables and chairs for artists and crew to eat F2 B2 W1 W1 W1 W1 C2
F2 B2 W1 W1 W1 W1 C2
5 Staff areas 11 Green room 3 Lounge Area Area with couches and chairs for artists and crew to relax
Production Service
M:\VP_Prod (Bureau)\Theatre Projects\Projects - Theatre\Studies\Brazil\Rio_de_Janeiro\Drawings\PDF\2008-10-16_Scedule_finishes_for_Pricing\Typical Schedule of Finishes (BOH).xls Page 6 of 7
RIO- THEATRE SCHEDULE OF FINISHES DRAFT - FOR INFORMATION ONLY
October 17th, 2008 CONTACT CIRQUE FOR FURTHER INFORMATION
Walls
Element Sub-Element Room name Room number Function Floor Base-Board Ceiling Notes Legend
North East South West
7 Building Support
Building
7 Building support 1 Infrastructure
Building
F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
7 Building support 1 Infrastructure 1 HVAC Room Building Heating and ventilation equipment
Building
F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
7 Building support 1 Infrastructure 2 Mechanical Room Building Mechanical equipment
Building
F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
7 Building support 1 Infrastructure 3 Electrical Room Building Electrical equipment
Building
F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
7 Building support 1 Infrastructure 4 Elevator Room Building Elevator hydraulic system equipment
Building Communications
F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
7 Building support 1 Infrastructure 5 Closet definition
Building
F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
7 Building support 1 Infrastructure 6 Fire Pump Room Sprinkler system
Building
7 Building support 2 maintenance
F9 B4 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
7 Building support 2 Building Maintenance 1 Janitor Room
F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
7 Building support 2 Building Maintenance 2 Waste Disposal Room
Sub-Total 1 (sub-elements
6.1 to 6.3)
8 Building Egress
Building Vertical
8 Egress 1 Vertical Egress
Building Vertical
F10 B6 W1 W1 W1 W1 C3
8 Egress 1 Vertical Egress 1 Stairs
Building Vertical
F2 B2 W1 W1 W1 W1 C2
8 Egress 1 Vertical Egress 2 Corridors
Building Vertical
8 Egress 1 Vertical Egress 3
Production Service
M:\VP_Prod (Bureau)\Theatre Projects\Projects - Theatre\Studies\Brazil\Rio_de_Janeiro\Drawings\PDF\2008-10-16_Scedule_finishes_for_Pricing\Typical Schedule of Finishes (BOH).xls Page 7 of 7