RIO- THEATRE SCHEDULE OF FINISHES DRAFT - FOR INFORMATION ONLY

October 17th, 2008 CONTACT CIRQUE FOR FURTHER INFORMATION

Walls
Element Sub-Element Room name Room number Function Floor Base-Board Ceiling Notes Legend
North East South West

1 Public Areas

1 Public Areas 1 Food & Beverage Food concession/sales area Floor

1 Public Areas 1 Food & Beverage 1 Counter Space Food & Beverage Sales Counter and back counter F9 B4 * * * * * * Finishes to be specified by Interior Design
F1 Carpet

F9 B4 W1 W1 W1 W1 C1
1 Public Areas 1 Food & Beverage 2 Support Function Food & Beverage support functions (Kitchen, Shelving,..) F2 Sheet Vinyl Floor/Linoleum

1 Public Areas 1 Food & Beverage 3 Storage Food & Beverage storage
F9 B4 W1 W1 W1 W1 C3
F3 Non Static Sheet Vinyl
F4 Sheet Vinyl Floor (cushioned back)

1 Public Areas 2 Retail Retail sales-merchandising F5 Resilient Sport Floor

Retail space with wall display and shelving for display and
1 Public Areas 2 Retail 1 Boutique sales of merchandise. * * * * * * * F6 Floating dance floor
*Finishes to be specified by Interior Design
1 Public Areas 2 Retail 2 Fitting Room For patrons to try on clothing items * * * * * * * *Finishes to be specified by Interior Design
F7 Vinyl Composite Tile (VCT)
1 Public Areas 2 Retail 3 Storage Storage for boutique F2 B2 W1 W1 W1 W1 C6 F8 Ceramic Tile
1 Public Areas 2 Retail 4 Kiosk Satellite counter for quick sales * * * * * * * *Finishes to be specified by Interior Design
F9 Quarry Tile

F10
Exposed Concrete w/ Sealer or Epoxy paint
1 Public Areas 3 Lobby F11 Battleship Linoleum
Part of the front of house area of the theatre in which the
1 Public Areas 3 Lobby 1 Patron Lobby
audience may congregate or use services before the show * * * * * * * F12 Flat Plate
and/or at intermission. *Finishes to be specified by Interior Design
1 Public Areas 3 Lobby 2 Cloak Room Patron coat storage during the show * * * * * * * *Finishes to be specified by Interior Design
F13 Exposed Floor structure/Grating

F8 B3 W3 W3 W3 W3 C1
1 Public Areas 3 Lobby 3 Restrooms For patron use

1 Public Areas 3 Lobby 4 Terrace Exterior lobby space n/a n/a n/a n/a n/a n/a n/a

1 Public Areas 4 VIP VIP functions Baseboard


1 Public Areas 4 VIP Room 1 VIP Room Main VIP reception / function area * * * * * * * *Finishes to be specified by Interior Design
B1 Carpet

1 Public Areas 4 VIP Room 2 Cloak Room VIP Coat storage * * * * * * * *Finishes to be specified by Interior Design
B2 Vinyl
1 Public Areas 4 VIP Room 3 Restrooms For VIP patron use F8 B3 W3 W3 W3 W3 C1 B3 Ceramic tile
1 Public Areas 4 VIP Room 4 Kitchen Food preperation area for VIP functions * * * * * * * *Finishes to be specified by Interior Design
B4 Quarry Tile
1 Public Areas 4 VIP Room 5 Storage General VIP room storage F2 B2 W1 W1 W1 W1 C6 B5 3mm Thick painted Steel Plate
B6 Wall material is continued to the floor

1 Public Areas 5 Ticketing Ticket sales.


Closed office for manager. Area for counting money out of
1 Public Areas 5 Ticketing 1 Count Room public view F1 B1 W1 W1 W1 W1 C2

2 Office F1 B1 W1 W1 W1 W1 C2 Wall

1 Public Areas 5 Ticketing 3 Box Office Point of sale where patrons can buy tickets * * * * * * * *Finishes to be specified by Interior Design
W1 Gypsum Board Painted
W2 Acoustical Panels
6 Building access W3 Ceramic Tile
Area at theatre main entrance where patrons can be dropped
n/a n/a n/a n/a n/a n/a n/a
1 Public Areas 6 Building access 1 Drop Off Area off by taxi or other. W4 Concrete or CMU painted
Acoustical Insulation (black) covered with
n/a n/a n/a n/a n/a n/a n/a
1 Public Areas 6 Building access 2 Parking Car park for patrons. W5 expanded metal (black)
W6 Stainless steel panels (elevators)
Sub-Total 1 (sub-elements
1 Public Areas 1.1 to 1.7)

1 Public Areas 7 Circulation Ceiling


Patron access, public spaces. Accessibilty for disabled
1 Public Areas 7 Circulation 1 Passenger Elevator patrons. * * * * * * * *Finishes to be specified by Interior Design
C1 Gypsum Board Painted

1 Public Areas 7 Circulation 2 Stairs Patron vertical access. * * * * * * * *Finishes to be specified by Interior Design
C2 2'x2' or 2'x4' Acoustical Lay-in Tile

1 Public Areas 7 Circulation 3 Corridors Patron circulation


* * * * * * * *Finishes to be specified by Interior Design
C3 Exposed ceiling/structure painted

C4 Stainless steel panels (elevators)

Production Service
M:\VP_Prod (Bureau)\Theatre Projects\Projects - Theatre\Studies\Brazil\Rio_de_Janeiro\Drawings\PDF\2008-10-16_Scedule_finishes_for_Pricing\Typical Schedule of Finishes (BOH).xls Page 1 of 7
RIO- THEATRE SCHEDULE OF FINISHES DRAFT - FOR INFORMATION ONLY
October 17th, 2008 CONTACT CIRQUE FOR FURTHER INFORMATION

Walls
Element Sub-Element Room name Room number Function Floor Base-Board Ceiling Notes Legend
North East South West

2 Auditorium

2 Auditorium 1 Seating Area where the patrons sit to watch the performance/show.

2 Auditorium 1 Seating 1 Standard


Standard theatre seats arranged in rows. Includes wheelchair
accessible seating.
F9 B6 W2 / * W2 / * W2 / * W2 / * *
*Finishes to be specified by Interior Design
2 Auditorium 1 Seating 2 VIP VIP seating * * * * * * * *Finishes to be specified by Interior Design
2 Auditorium 1 Seating 3 Bar Seating Bar type seating (high stools) in Auditorium space * * * * * * * *Finishes to be specified by Interior Design
A partitionned section with seating for a small number of
2 Auditorium 1 Seating 4 Loggia people. Also refferred to as a Box. * * * * * * * *Finishes to be specified by Interior Design

Sub-Total 1 (sub-element
1.1)

2 Auditorium 2 Circulation

2 Auditorium 2 Circulation 1 Stairs Stairs within Auditorium space F1 B6 W2 / * W2 / * W2 / * W2 / * * *Finishes to be specified by Interior Design
2 Auditorium 2 Circulation 2 Corridors F1 B6 W2 / * W2 / * W2 / * W2 / * * *Finishes to be specified by Interior Design
An open passageway running parallel to the seating rows
2 Auditorium 2 Circulation 3 Cross-Aisle allowing to access the aisles. F1 B6 W2 / * W2 / * W2 / * W2 / * * *Finishes to be specified by Interior Design
An open passageway between areas of seating providing
2 Auditorium 2 Circulation 4 Aisle access to the seats in an auditorium. F1 B6 W2 / * W2 / * W2 / * W2 / * * *Finishes to be specified by Interior Design
Auditorium entrance or exit up through banked seating from
2 Auditorium 2 Circulation 5 Vomitory below. F1 B6 W2 / W2 / W2 / W2 /
* * * * * *Finishes to be specified by Interior Design

3 Performance Spaces

3 Performance spaces 1 Stage Main performance area

F11 B2 W1 / W5 W1 / W5 W1 / W5 W1 / W5 C3/C5
3 Performance spaces 1 Stage 1 Stage Main stage floor area, excluding lifts and traps
Sections of the stage floor which can be raised and /or
F11 - W1 / W5 W1 / W5 W1 / W5 W1 / W5 C3/C5
3 Performance spaces 1 Stage 2 Lifts lowered by mechanical means.
Sections of the stage floor which can be opened either
F11 - W1 / W5 W1 / W5 W1 / W5 W1 / W5 C3/C5
3 Performance spaces 1 Stage 3 Trap mechanically or manually

Part of the stage which projects from the proscenium (or the
3 Performance spaces 2 Forestage main stage) into the auditorium.

F11 B2 W1 / W5 W1 / W5 W1 / W5 W1 / W5 C3/C5
3 Performance spaces 2 Forestage 1 Forestage Forestage floor area excluding lifts and traps.
Sections of the stage floor which can be raised and /or
F11 - W1 / W5 W1 / W5 W1 / W5 W1 / W5 C3/C5
3 Performance spaces 2 Forestage 2 Lifts lowered by mechanical means.
Sections of the stage floor which can be opened either
F11 - W1 / W5 W1 / W5 W1 / W5 W1 / W5 C3/C5
3 Performance spaces 2 Forestage 3 Trap mechanically or manually

The back and sides of the stage which cannot be seen by the
3 Performance spaces 3 Wings audience

The upstage area of the stage (part of the stage furthest from F10 B2 W1 / W5 W1 / W5 W1 / W5 W1 / W5 C3/C5
3 Performance spaces 3 Wings 1 Rear Stage Wings the audience) which cannot be seen by the audience.
Wing area on left side of stage as seen from the actors point
F10 B2 W1 / W5 W1 / W5 W1 / W5 W1 / W5 C3/C5
3 Performance spaces 3 Wings 2 Stage Left Wings of view.
Wing area on right side of stage as seen from the actors point
F10 B2 W1 / W5 W1 / W5 W1 / W5 W1 / W5 C3/C5
3 Performance spaces 3 Wings 3 Stage Right Wings of view.

A route leading from one side of the stage to the other, out of
3 Performance spaces 4 Crossover the Audiences view, generally far upstage.
F10 B2 W1 / W5 W1 / W5 W1 / W5 W1 / W5 C3/C5

3 Performance spaces 5 Musicians Position


F11 B2 W1 / W2 W1 / W2 W1 / W2 W1 / W2

Production Service
M:\VP_Prod (Bureau)\Theatre Projects\Projects - Theatre\Studies\Brazil\Rio_de_Janeiro\Drawings\PDF\2008-10-16_Scedule_finishes_for_Pricing\Typical Schedule of Finishes (BOH).xls Page 2 of 7
RIO- THEATRE SCHEDULE OF FINISHES DRAFT - FOR INFORMATION ONLY
October 17th, 2008 CONTACT CIRQUE FOR FURTHER INFORMATION

Walls
Element Sub-Element Room name Room number Function Floor Base-Board Ceiling Notes Legend
North East South West

Sub-Total 1 (sub-element
3.1 to 3.5)

3 Performance spaces 6 Circulation

3 Performance spaces 6 Circulation 1 Stairs Stairs within stage area

3 Performance spaces 6 Circulation 2 Corridors

4 Production Areas

4 Production Areas 1 Carpentry Shop For maintenance and repair of wooden elements
4 Production Areas 1 Carpentry Shop 1 Carpentry Shop Main shop area F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
4 Production Areas 1 Carpentry Shop 2 Spray Booth Small well-ventilated room for use of paint and toxic materials

4 Production Areas 1 Carpentry Shop 3 Storage For carpentry shop materials and equipment F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3

For maintenance and repair of metal elements, including


4 Production Areas 2 Metal Shop welding
4 Production Areas 2 Metal Shop 1 Metal Shop Main shop area F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
4 Production Areas 2 Metal Shop 2 Welding Area Section of metal shop dedicated to welding F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3

4 Production Areas 2 Metal Shop 3 Storage For metal shop materials and equipment F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3

4 Production Areas 3 Prop Shop Props maintenance and repair

F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
4 Production Areas 3 Prop Shop 1 Prop Shop Main shop area

F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
4 Production Areas 3 Prop Shop 2 Spray Booth Small well-ventilated room for use of paint and toxic materials

4 Production Areas 3 Prop Shop 3 Storage For prop shop materials and equipment F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3

4 Production Areas 4 Shoe Shop Shoe maintenance and storage


4 Production Areas 4 Shoe Shop 1 Shoe Shop Main shop area F4 B2 W1 W1 W1 W1 C2

F2 B2 W1 W1 W1 W1 C2
4 Production Areas 4 Shoe Shop 2 Spray Booth Small well-ventilated room for use of paint and toxic materials

4 Production Areas 4 Shoe Shop 3 Storage For shoe shop materials and equipment F2 B2 W1 W1 W1 W1 C2

4 Production Areas 5 Costume Shop Workshop for costume repair storage and washing
4 Production Areas 5 Costume Shop 1 Costume Shop Main shop area F4 B2 W1 W1 W1 W1 C2
4 Production Areas 5 Costume Shop 2 Fitting Room Costume fittings F4 B2 W1 W1 W1 W1 C2

F4 B2 W1 W1 W1 W1 C2
Area within costume shop equiped with sinks, washers and
4 Production Areas 5 Costume Shop 3 Laundry Room dryers for washing the costumes
4 Production Areas 5 Costume Shop 4 Office Office for Head of Department F4 B2 W1 W1 W1 W1 C2

4 Production Areas 5 Costume Shop 5 Storage Storage of costumes and materials F2 B2 W1 W1 W1 W1 C2

4 Production Areas 6 Lighting Shop Theatrical lighting maintenance and storage


4 Production Areas 6 Lighting Shop 1 Lighting Shop Main shop area F3 B2 W1 W1 W1 W1 C2

4 Production Areas 6 Lighting Shop 2 Storage For lighting shop materials and equipment F3 B2 W1 W1 W1 W1 C2

4 Production Areas 7 Automation Shop Automation maintenace and storage


4 Production Areas 7 Automation Shop 1 Automation Shop Main shop area F3 B2 W1 W1 W1 W1 C2

4 Production Areas 7 Automation Shop 2 Storage For automation shop materials and equipment F3 B2 W1 W1 W1 W1 C2

4 Production Areas 8 Rigging Shop Rigging maintenance and storage


4 Production Areas 8 Rigging Shop 1 Rigging Shop Main shop area F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3

Production Service
M:\VP_Prod (Bureau)\Theatre Projects\Projects - Theatre\Studies\Brazil\Rio_de_Janeiro\Drawings\PDF\2008-10-16_Scedule_finishes_for_Pricing\Typical Schedule of Finishes (BOH).xls Page 3 of 7
RIO- THEATRE SCHEDULE OF FINISHES DRAFT - FOR INFORMATION ONLY
October 17th, 2008 CONTACT CIRQUE FOR FURTHER INFORMATION

Walls
Element Sub-Element Room name Room number Function Floor Base-Board Ceiling Notes Legend
North East South West

4 Production Areas 8 Rigging Shop 2 Storage For rigging shop materials and equipment F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3

4 Production Areas 9 SFX Shop Special effects maintenance and storage


4 Production Areas 9 SFX Shop 1 SFX Shop Main shop area F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
4 Production Areas 9 SFX Shop 2 Pyrotechnical Room Secure area for storage of pyrotechnical effects F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3

4 Production Areas 10 Sound Shop Sound equipment maintenance and storage


4 Production Areas 10 Sound Shop 1 Sound Shop Main shop area F3 B2 W1 W1 W1 W1 C2

4 Production Areas 10 Sound Shop 2 Storage For sound shop materials and equipment F3 B2 W1 W1 W1 W1 C2

4 Production Areas 11 Control Rooms


Soundproofed room with a large viewing window usually
located at the rear of the auditorium where lighting,
F3 B2 W1 W1 W1 W1 C2
Automation, SFX, projections and stage management are
4 Production Areas 11 Control Rooms 1 Main Control Booth operated from.

F3 B2 W1 W1 W1 W1 -
4 Production Areas 11 Control Rooms 2 Sound Booth Sound operator location and equipment

F3 B2 W1 W1 W1 W1 C2
4 Production Areas 11 Control Rooms 3 Monitor Room Sound monitor operation location and equipment

F3 B2 W1 W1 W1 W1 C2
4 Production Areas 11 Control Rooms 4 Projection Booth Area for projectors and projection equipment

F3 B2 W1 W1 W1 W1 C2
4 Production Areas 11 Control Rooms 5 Automation Room
Additional Control
4 Production Areas 11 Control Rooms 6 Rooms
* * * * * * *
*Finishes to be determined according to control room type
Theatrical
4 Production Areas 12 equipment rooms
F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
4 Production Areas 12 Equipment room 1 Hydraulic Room Stage lift hydraulic equipment room

F10 B2 W1 W1 W1 W1 C3

4 Production Areas 12 Equipment room 2 Dimmer Room Room containing the theatrical dimmer systems
Sound Equipment Controlled temperature room where amplifiers, audio
F3 B2 W1 W1 W1 W1 C2
4 Production Areas 12 Equipment room 3 Room equipment room etc. are stored

4 Production Areas 13 Overhead Structure Grid and catwalks

Above stage and Audience grid. Support structure (usually


made from light steel channels or grating) providing mounting
F13 B6 W5 W5 W5 W5 C3
locations for rigging equipment as well as maintenance access
to that equipment. May also be used for performance purposes
4 Production Areas 13 Overhead structure 1 High Grid as an artist access on stage.

Above Audience grid. Support structure (usually made from


light steel channels or grating) providing mounting locations
F13 B6 W5 W5 W5 W5 C3
for rigging equipment as well as maintenance access to that
equipment. May also be used for performance purposes as an
4 Production Areas 13 Overhead structure 2 Low Grid artist access on stage.

Technical access walkway above the stage or auditorium used F12 / F1 - W5 W5 W5 W5 C3


4 Production Areas 13 Overhead structure 3 Catwalks to reach equipment and lighting positions.

Where counterweights are stored and loaded into the F12 / F1 - W5 W5 W5 W5 C3


4 Production Areas 13 Overhead structure 4 Loading Gallery counterweight system's arbour

- - - - - - -
4 Production Areas 13 Overhead structure 5 Counterweight Wall Space dedicated to the counterweight flying system
Front of house vertical lighting position (predominently
4 Production Areas 13 Overhead structure 6 Box Boom sidelight). F12 / F1 - W5 W5 W5 W5 C3

4 Production Areas 14 Understage

Production Service
M:\VP_Prod (Bureau)\Theatre Projects\Projects - Theatre\Studies\Brazil\Rio_de_Janeiro\Drawings\PDF\2008-10-16_Scedule_finishes_for_Pricing\Typical Schedule of Finishes (BOH).xls Page 4 of 7
RIO- THEATRE SCHEDULE OF FINISHES DRAFT - FOR INFORMATION ONLY
October 17th, 2008 CONTACT CIRQUE FOR FURTHER INFORMATION

Walls
Element Sub-Element Room name Room number Function Floor Base-Board Ceiling Notes Legend
North East South West
Area below the stage used for movement and storage of
F10 B2 W4 W4 W4 W4 C3
4 Production Areas 14 Understage 1 Understage scenic and technical equipement during the show.
Space within understage area at a lower level into which stage
4 Production Areas 14 Understage 2 Lift Pit lift machinery is installed. F10 B6 W4 W4 W4 W4 C3

4 Production Areas 15 Materials Handling

F10 B6 W6 W6 W6 W6 C4

4 Production Areas 15 Materials Handling 1 Freight Elevator Hign load, large size elevator for technical functions

F10 B2 W4 W4 W4 W4 C3
4 Production Areas 15 Materials Handling 2 Loading Dock Truck parking area for unloading of materials into the theatre.

4 Production Areas 15 Materials Handling 3 Handling Area Transition zone to handle materials and equipment F10 B2 W4 W4 W4 W4 C3

4 Production Areas 16 Storage

4 Production Areas 16 Storage 1 Storage CDS Storage-general F10 B2 W4 W4 W4 W4 C3

5 Staff Areas
Administrative
5 Staff areas 1 Offices-CDS CDS administrative staff offices

5 Staff areas 1 Administrative Offices 1 Reception


F1 B1 W1 W1 W1 W1 C2
Company
5 Staff areas 1 Administrative Offices 2 Management Company Manager and Assistant Company Manager offices
F1 B1 W1 W1 W1 W1 C2

5 Staff areas 1 Administrative Offices 3 Human Ressources Human ressources staff


F1 B1 W1 W1 W1 W1 C2

5 Staff areas 1 Administrative Offices 4 Finance Director of finance and staff


F1 B1 W1 W1 W1 W1 C2

Operations Production Includes Operations Production Manager, Technical Director, F1 B1 W1 W1 W1 W1 C2


5 Staff areas 1 Administrative Offices 5 Management Technical buyer.

5 Staff areas 1 Administrative Offices 6 Public Relations F1 B1 W1 W1 W1 W1 C2

5 Staff areas 2 Office Support


5 Staff areas 2 Office Support 1 Conference Room Meeting room for staff F1 B1 W1 W1 W1 W1 C2
5 Staff areas 2 Office Support 2 Kitchenette Small kitchen for Office staff use F2 B2 W1 W1 W1 W1 C2
5 Staff areas 2 Office Support 3 Photocopy Room Photocopier, printer, fax and paper storage F2 B2 W1 W1 W1 W1 C2
5 Staff areas 2 Office Support 4 Storage Office equipment storage F2 B2 W1 W1 W1 W1 C2
5 Staff areas 2 Office Support 5 Server Server room for offices and IT work station F2 B2 W1 W1 W1 W1 C2

5 Staff areas 3 Artistic Offices CDS artistic staff

F1 B1 W1 W1 W1 W1 C2
5 Staff areas 3 Artistic Offices 1 Artistic Coordinator

F1 B1 W1 W1 W1 W1 C2
5 Staff areas 3 Artistic Offices 2 Stage Management Includes General Stage Manager and Stage management staff

5 Staff areas 4 Technical Offices

Heads of Departments F2 B2 W1 W1 W1 W1 C2
5 Staff areas 4 Technical Offices 1 Offices Offices for the heads of departments

5 Staff areas 5 Non CDS Offices

5 Staff areas 5 Non CDS Offices 1 Theatre Operator Theatre operation's staff offices F1 * B1 * W1 * W1 * W1 * W1 * C2 * *Finishes to be validated with Partner
5 Staff areas 5 Non CDS Offices 2 Staff F.O.H. Front of House (F.O.H.) staff areas F2 * B2 * W1 * W1 * W1 * W1 * C2 * *Finishes to be validated with Partner
F2 * B2 * * * * * C2 *
5 Staff areas 5 Non CDS Offices 3 Break room W1 W1 W1 W1 *Finishes to be validated with Partner

5 Staff areas 6 Physiotherapy

Production Service
M:\VP_Prod (Bureau)\Theatre Projects\Projects - Theatre\Studies\Brazil\Rio_de_Janeiro\Drawings\PDF\2008-10-16_Scedule_finishes_for_Pricing\Typical Schedule of Finishes (BOH).xls Page 5 of 7
RIO- THEATRE SCHEDULE OF FINISHES DRAFT - FOR INFORMATION ONLY
October 17th, 2008 CONTACT CIRQUE FOR FURTHER INFORMATION

Walls
Element Sub-Element Room name Room number Function Floor Base-Board Ceiling Notes Legend
North East South West

F4 B2 W1 W1 W1 W1 C2
5 Staff areas 6 Physiotherapy 1 Treatment Room Artist treatment area
5 Staff areas 6 Physiotherapy 2 Offices Physiotherapy staff F4 B2 W1 W1 W1 W1 C2
5 Staff areas 6 Physiotherapy 3 Exam Room Examinations room F4 B2 W1 W1 W1 W1 C2
4 Storage Physiotherapy equipment storage F2 B2 W1 W1 W1 W1 C2
For first response to any emergency situation for crew, staff
5 Staff areas 6 Physiotherapy 5 First Aid and artists. F2 B2 W1 W1 W1 W1 C2

5 Staff areas 7 Training Room Artist training

F10 / F5 or F6 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
5 Staff areas 7 Training room 1 Training Room Room reserved for training of artists
5 Staff areas 7 Training room 2 Storage Training equipment storage F2 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
Multipurpose training space for artists seperate from training
F6 B2 W1 W1 W1 W1 C3
7 Training room 3 Dance Studio room
5 Staff areas 7 Training room 4 Office Office space for coaches F2 B2 W1 W1 W1 W1 C2

5 Staff areas 8 Dressing Rooms


F4 B2 W1 W1 W1 W1 C2
5 Staff areas 8 Dressing rooms 1 Dressing Rooms Artist preparation - costume change and make-up preparation
6 Staff areas 9 Dressing rooms 2 Shower Rooms Showers for artists F8 B3 W3 W3 W3 W3 C1

F8 B3 W3 W3 W3 W3 C1
5 Staff areas 8 Dressing rooms 3 Restrooms Toilets for artists

5 Staff areas 9 Make-up Room Artist make-up F4 B2 W1 W1 W1 W1 C2

5 Staff areas 10 Music Room For musician pratice F1 B1 W2 W2 W2 W2 C2

5 Staff areas 11 Green Room Room for artist and crew to meet and relax.

F2 B2 W1 W1 W1 W1 C2
5 Staff areas 11 Green room 1 Internet Corner Area with tables and computers for artists internet access
5 Staff areas 11 Green room 2 Dining Area Area with tables and chairs for artists and crew to eat F2 B2 W1 W1 W1 W1 C2

F2 B2 W1 W1 W1 W1 C2
5 Staff areas 11 Green room 3 Lounge Area Area with couches and chairs for artists and crew to relax

n/a n/a n/a n/a n/a n/a n/a


5 Staff areas 11 Green room 4 Terrace Artist/crew exterior space for relaxation and smoking
5 Staff areas 11 Green room 5 Kitchen Artist and crew use F8 B3 W3 W3 W3 W3 C1

5 Staff areas 12 Crew Room


F2 B2 W1 W1 W1 W1 C2
5 Staff areas 12 Crew rooms 1 Change Rooms Change facilities for technical crew
Restrooms and
F8 B3 W3 W3 W3 W3 C1
5 Staff areas 12 Crew rooms 2 Showers Technical Crew restrooms and showers
5 Staff areas 12 Crew rooms 3 Lockers Technical Crew lockers F2 B2 W1 W1 W1 W1 C2

5 Staff areas 13 Rest Rooms


5 Staff areas 13 Rest rooms 1 Training Room Adjacent to Training Room F8 B3 W1 / W3 W1 / W3 W1 / W3 W1 / W3 C1
5 Staff areas 13 Rest rooms 2 Green Room Adjacent to Green Room F8 B3 W1 / W3 W1 / W3 W1 / W3 W1 / W3 C1
5 Staff areas 13 Rest rooms 3 Onstage Use during show F8 B3 W1 / W3 W1 / W3 W1 / W3 W1 / W3 C1
5 Staff areas 13 Rest rooms 4 Control Booth Technician use during show F8 B3 W1 / W3 W1 / W3 W1 / W3 W1 / W3 C1
5 Staff areas 13 Rest rooms 5 CDS Offices Administrative office use F8 B3 W1 / W3 W1 / W3 W1 / W3 W1 / W3 C1
5 Staff areas 13 Rest rooms 6 Non CDS Offices Administrative office use F8 B3 W1 / W3 W1 / W3 W1 / W3 W1 / W3 C1

5 Staff areas 14 Storage General storage


5 Staff areas 14 Storage 1 Storage F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3

6 Production and Staff Areas Circulation

Production and Staff


6 Areas Circulation 1 Circulation

Production and Staff F2 B6 W6 W6 W6 W6 C4


6 Areas Circulation 1 Circulation 1 Passenger Elevator Artist access

Production and Staff F10 B6 W1 W1 W1 W1 C3


6 Areas Circulation 1 Circulation 2 Stairs Backstage access

Production Service
M:\VP_Prod (Bureau)\Theatre Projects\Projects - Theatre\Studies\Brazil\Rio_de_Janeiro\Drawings\PDF\2008-10-16_Scedule_finishes_for_Pricing\Typical Schedule of Finishes (BOH).xls Page 6 of 7
RIO- THEATRE SCHEDULE OF FINISHES DRAFT - FOR INFORMATION ONLY
October 17th, 2008 CONTACT CIRQUE FOR FURTHER INFORMATION

Walls
Element Sub-Element Room name Room number Function Floor Base-Board Ceiling Notes Legend
North East South West

Production and Staff F2/F4 B2 W1 W1 W1 W1 C2


6 Areas Circulation 1 Circulation 3 Corridors Backstage circulation

7 Building Support
Building
7 Building support 1 Infrastructure
Building
F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
7 Building support 1 Infrastructure 1 HVAC Room Building Heating and ventilation equipment
Building
F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
7 Building support 1 Infrastructure 2 Mechanical Room Building Mechanical equipment
Building
F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
7 Building support 1 Infrastructure 3 Electrical Room Building Electrical equipment
Building
F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
7 Building support 1 Infrastructure 4 Elevator Room Building Elevator hydraulic system equipment
Building Communications
F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
7 Building support 1 Infrastructure 5 Closet definition
Building
F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
7 Building support 1 Infrastructure 6 Fire Pump Room Sprinkler system

Building
7 Building support 2 maintenance

F9 B4 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
7 Building support 2 Building Maintenance 1 Janitor Room
F10 B2 W1 / W4 W1 / W4 W1 / W4 W1 / W4 C3
7 Building support 2 Building Maintenance 2 Waste Disposal Room

7 Building support 2 Building Maintenance 3 Other

7 Building support 3 Building Security


7 Building support 3 Building Security 1 Security Office F2 B2 W1 W1 W1 W1 C2
7 Building support 3 Building Security 2 First Aid F2 B2 W1 W1 W1 W1 C2
7 Building support 3 Building Security 3 Other

Sub-Total 1 (sub-elements
6.1 to 6.3)

7 Building support 4 Circulation


7 Building support 4 Circulation 1 Passenger Elevator F2 B6 W6 W6 W6 W6 C4
7 Building support 4 Circulation 2 Stairs F10 B6 W1 W1 W1 W1 C3
7 Building support 4 Circulation 3 Corridors F2 B2 W1 W1 W1 W1 C2

8 Building Egress

Building Vertical
8 Egress 1 Vertical Egress
Building Vertical
F10 B6 W1 W1 W1 W1 C3
8 Egress 1 Vertical Egress 1 Stairs
Building Vertical
F2 B2 W1 W1 W1 W1 C2
8 Egress 1 Vertical Egress 2 Corridors
Building Vertical
8 Egress 1 Vertical Egress 3

Production Service
M:\VP_Prod (Bureau)\Theatre Projects\Projects - Theatre\Studies\Brazil\Rio_de_Janeiro\Drawings\PDF\2008-10-16_Scedule_finishes_for_Pricing\Typical Schedule of Finishes (BOH).xls Page 7 of 7