Professional Documents
Culture Documents
PDFs
PDFs
CUSTOMER:
Sensei Farms Leamington ULC
Address: 709 Mersea Road 11
Postal/ZIP: NOP2JO
Layout: 15-10-2018
City: Staples, Ontario
E-mail:
Phone:
Artechno Growsystems B.V.
Pastoor Verburglaan 20a
2678 NE De Lier
Plottime: 11:48:57
+31(0)174-512051
info@artechno.nl
23-11-2022
Plot date:
AVF+ Junior X_J01_WMU
36
1938_E11_WMU_221123
of
Plot page: 1
Path name: 1938_E11_WMU_221123
11
Drawing no: Project: Rev.: Engineer:
FRONT PAGE 1938_E11_WMU_221123AVF+ Junior X_J01_WMU
1.0 PVH_HEAD
Layout: 11-6-2018
Max. prefuse: 50A inside panel
Max. allowed shortcirquit current: 10kA Type cable glands: Plastic IP68
Total installed power: 7,7 kW Cable infeed: Bottom
Total installed current: 12,2 A
Wiring finish: Ferrule DIN color
Consumed power: 7,7 kW
Consumed current: 12,2 A Wiring type: LAPP MULTIC STANDAARD SC2.1 UL CSA
Plottime: 11:48:58
Power supply system: TN-S Hight cable duct: 60mm
23-11-2022
PLC TERM: Function:
Coding material: Applied: Coding type:
TERM_01,....10 Digital input terminals
Plot date:
TERM_11,....20 Digital output terminal
Component coding Yes, Component Weidmuller LM MT 300 15/6
TERM_21,....30 Analog input terminal
Terminal strip coding Yes Weidmuller WS 12/5 MC
TERM_31,....40 Analog output terminal
Wire coding N.A. N.A.
TERM_41,....50 Solid state relays terminal
Cable coding N.A. N.A.
36
TERM_51,....60 Modbus/Serial interface term.
Field component coding N.A. N.A.
TERM_61,....70 EtherCAT terminal
of
TERM_71,....80 IO link terminal
Plot page: 2
TERM_81,....90 Safety in/out terminal
TERM_91,....99 Other terminal
Layout: 06-06-2018
480 Vac switched Black
277 Vac Line Black
230 Vac Neutral White
Plottime: 11:48:58
23-11-2022
Plot date:
36
of
Plot page: 3
11 31
Drawing no.: Project: Rev.: Engineer:
WIRING MAIN AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
POWER CIRCUIT Date: Page: Last :
23-11-2022 30 608
1 2 3 4 5 6 7 8 9 10
Layout: 11-6-2018
208/120 neutral White <= 3A 22 AWG
208/120 switched wire Red <= 5A 20 AWG
Protective Earth Yellow/Green
<= 7A 18 AWG
24 vdc + Blue <= 10A 16 AWG
24 vdc - White
Plottime: 11:48:58
24 vdc switched wire Blue / White
24 vac Blue
24 vac neutral White
24 vac switched wire Blue / White
23-11-2022
External power Orange
PLC input Purple
Plot date:
PLC output ( AC ) Grey
PLC output ( DC ) Yellow
36
of
Plot page: 4
30 40
Drawing no.: Project: Rev.: Engineer:
WIRING CONTROL AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
POWER CIRCUIT Date: Page: Last :
23-11-2022 31 608
1 2 3 4 5 6 7 8 9 10
-
Version Engineer
V0.0 PVH_HEAD
Modification
First design
Date:
10-11-2022
Version control explanation
V0.1 PVH_HEAD First modification during design 15-11-2022 Version Explanation
V1.0 PVH_HEAD First modification after panel construction 23-11-2022 0.0 First design
. . . .
. . . . 0.1 First modification during design
Layout: 06-06-2018
. . . . 0.x Modification x during design
. . . .
. . . . 1.0 Version for panel construction
. . . . 1.1 First change during panel construction
. . . .
. . . . 1.x Change x during panel construction
. . . .
. . . . 2.0 Version for installation
. . . . 2.1 First change during installation
Plottime: 11:48:58
. . . . 2.x Change x during installation
. . . .
. . . .
. . . . 3.0 Version as-built for commissioning
. . . .
. . . .
. . . .
23-11-2022
. . . .
. . . .
. . . .
. . . .
Plot date:
. . . .
. . . .
. . . .
. . . .
36
of
Plot page: 5
31 100
Drawing no.: Project: Rev.: Engineer:
REVISIONS AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: Page: Last :
23-11-2022 40 608
1 2 3 4 5 6 7 8 9 10
ENERGY MEASUREMENT
L1 L1 101.10
-100XJ9.1 L2 L2 101.10
-100XJ9.2 L3 L3 101.10
-100XJ9.3 N NEUTRAL 101.10
-100XJ9.4
D1/+
D0/-
Layout: 11-5-2022
SH
L1'
L2'
L3'
0V
L1
L2
L3
N'
N
RS485
GN
-100W7
YE
-100U3
KWH meter
D+
D-
T1
T2
T3
IEM3150
Plottime: 11:48:58
-100Q1
63 A
450.1
450.1
L1
L2
L3
N
-100XJ2
23-11-2022
TOTAL POWER
3x480Vac 60Hz
7,7 KW ( max.3 x 50 A )
Plot date:
36
of
Plot page: 6
40 101
Drawing no.: Project: Rev.: Engineer:
MAIN POWER AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 100 608
1 2 3 4 5 6 7 8 9 10
OVERVOLTAGE PROTECTION 24VDC POWER SUPPLY 24VAC POWER SUPPLY
102.10 L1 L1 101.1
102.10 L2 L2 101.1
102.10 L3 L3 101.1
102.10 NEUTRAL NEUTRAL 101.1
L2/HL
PE
L1
L3
Layout: 03-02-2020
1
3
1
3
1
3
-101F5 -101F7.1 -101F9.1
11
-101U3
2
4
2
4
2
4
Surge Protection FAZ-C6/2-NA FAZ-C6/2-NA FAZ-C6/2-NA
12
501.5 14
VAL 277/40/3+1-FM
N
L1 L2 PE L1 L2 PE
480
180-550VAC 180-550V
Plottime: 11:48:58
33
36
1
2
-101T5 -101T7 -101T9
10A 24VDC 180->550VAC/48Vdc 2,5A 48VDC
+V +V -V -V DC OK +V -V DC OK 100VA
12
0
12
0
USTE 100/2x12
24
1
-101F7.2 -101F9.2
2A C4A
23-11-2022
1'
AFS 4 2C 10-36V BK FAZ-C4/1-NA
Plot date:
201.1 24VDC+
150.1 24VDC-
400.6 24VAC
607.1 0VAC
36
of
Plot page: 7
100 102
Drawing no.: Project: Rev.: Engineer:
MAIN POWER AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 101 608
1 2 3 4 5 6 7 8 9 10
230VAC POWER SUPPLY ACID DOSING PUMP LYE PUMP TANK A DOSING PUMP TANK B DOSING PUMP
1
3
1 -102F5
3
Layout: 27-2-2020
-102F2 C1A
2
4
C6A FAZ-C1/2-NA
2
4
FAZ-C6/2-NA
PE
PE
PE
PE
1
2
3
4
5
6
7
8
-X2 -X2 -X2 -X2
480
Plottime: 11:48:58
33
36
1
-102T2
1
2
3
1
2
3
1
2
3
1
2
3
250VA
PE
115
0
115
0
'1
'2
'3
'1
'2
'3
'1
'2
'3
'1
'2
'3
23-11-2022
-102W5 1 2 3 -102W6 4 5 6 -102W7 1 2 3 -102W8 1 2 3
LAPP OLF 191 3G1,5 LAPP OLF 110 3G1,5 LAPP OLF 110 3G1,5 LAPP OLF 110 3G1,5
ACID PUMP LYE PUMP TANK A PUMP TANK B PUMP
PE
PE
PE
PE
Plot date:
N
N
L
L
-102M5 -102M6 -102M7 -102M8
230Vac 230Vac 230Vac 230Vac
20W 20W 20W 20W
EWN-B11VH2R (UL) EWN-B11VC2R (UL) EWN-B11VC2R (UL) EWN-B11VC2R (UL)
160.2 160.4 160.6 160.8
503.3 503.5 503.7 503.9
36
of
Plot page: 8
101 103
Drawing no.: Project: Rev.: Engineer:
MAIN POWER AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 102 608
1 2 3 4 5 6 7 8 9 10
IRRIGATION PUMP MIXING PUMP DRAINAGE PUMP POWER SUPPLY
102.1 L1 L1 104.1
102.1 L2 L2 104.1
102.1 L3 L3 104.1
102.1 NEUTRAL NEUTRAL 110.1
L1
L2
L3
53
61
L1
L2
L3
53
61
L1
L2
L3
53
61
1
3
5
Layout: 19-11-2020
54
62
54
62
54
62
-103F8
-103F2 -103F4 -103F6 C15A
2
4
6
FAZ-C15/3-NA
502.2
502.4
502.6
PKZM0-1,6 PKZM0-1,6 PKZM0-2,5
T1
T2
T3
T1
T2
T3
T1
T2
T3
NHI-E-11-PKZ0 NHI-E-11-PKZ0 NHI-E-11-PKZ0
1
3
5
1
3
5
1
3
5
-603QM4 -603QM6 -603QM8
Plottime: 11:48:59
603.4 603.6 603.8
2
4
6
2
4
6
2
4
6
23-11-2022
PE
PE
PE
PE
10
12
13
11
1
2
3
4
5
6
7
8
9
-X1 -X1 -X1 -X1
Plot date:
-103W2 1 2 3 4 -103W4 1 2 3 4 -103W6 1 2 3 4 -103W8 1 2 3 4 5
LAPP OLF 191 4G1,5 LAPP OLF 191 4G1,5 LAPP OLF 191 4G1,5 LAPP OLF 191 5G4
IRRIGATION PUMP MIXING PUMP DRAIN PUMP POWER SUPPLY HVAC
36
-103M2 -103M4 -103M6 =X_P01/HVAC
208-230/400-480Vac 208-230/400-480Vac 277/480Vac
of
0.45kW 0.45kW 0.75kW
2.22/1.11A IRRIGATION PUMP 2.22/1.11A MIXING PUMP 2.9/1.7A DRAINAGE PUMP
Plot page: 9
102 104
Drawing no.: Project: Rev.: Engineer:
MAIN POWER AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 103 608
1 2 3 4 5 6 7 8 9 10
PHASE MONITORING RELAYS
103.10 L1 L1 110.1
103.10 L2 L2 110.1
103.10 L3 L3 110.1
1
3
5
-104F2
C4 2
4
6
FAZ-C4/3-NA
Layout: 11-2-2021
L1
L2
L3
Plottime: 11:48:59
11
-104U2 501.6
12
14
EMR6-F500-G-1
23-11-2022
Plot date:
36
of
Plot page: 10
103 110
Drawing no.: Project: Rev.: Engineer:
MAIN POWER AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 104 608
1 2 3 4 5 6 7 8 9 10
POWER SUPPLY
LED FIXTURES
104.10 L1 L1
104.10 L2 L2
104.10 L3 L3
103.10 NEUTRAL NEUTRAL
13
22
1
3
5
-110F2
Layout: 03-02-2020
C10A
14
21
2
4
FAZ-C10/3-NA 6
501.4
Z-IHK-NA
Plottime: 11:48:59
23-11-2022
-L1 LED FIXTURES 111.1
-L2 LED FIXTURES 111.1
-L3 LED FIXTURES
Plot date:
111.1
-N LED FIXTURES 111.1
36
of
Plot page: 11
104 111
Drawing no.: Project: Rev.: Engineer:
POWER SUPPLY LED FIXTURES AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 110 608
1 2 3 4 5 6 7 8 9 10
6 PIECES LED FIXTURES
J0101-0101-LED
Layout: 11-2-2020
N L COMD+D- PE 1 2 1 2 1 2 1 2 1 2
-111U5 POWER SUPPLY DMX EM DC1 DC2 DC3 jump.
120...277VAC TRANSM. DALI
Plottime: 11:48:59
1 2 + -
1 2
-111U6
23-11-2022
IN OUT
Plot date:
PE
14
15
-X1
-111W3 1 2 3
36
GEERS 3G1,5
LED FIXTURES J0101-0101
of
Plot page: 12
-RST16i3
8X LED Light
120-277V / 77W
110 112
Drawing no.: Project: Rev.: Engineer:
LED FIXTURES J0101-0101-LED AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 111 608
1 2 3 4 5 6 7 8 9 10
6 PIECES LED FIXTURES
J0101-0201-LED
Layout: 11-2-2020
N L COMD+D- PE 1 2 1 2 1 2 1 2 1 2
-112U5 POWER SUPPLY DMX EM DC1 DC2 DC3 jump.
120...277VAC TRANSM. DALI
Plottime: 11:48:59
1 2 + -
1 2
-112U6
23-11-2022
IN OUT
Plot date:
PE
16
17
-X1
-112W3 1 2 3
36
GEERS 3G1,5
LED FIXTURES J0101-0201
of
Plot page: 13
-RST16i3
8X LED Light
120-277V / 77W
111 113
Drawing no.: Project: Rev.: Engineer:
LED FIXTURES J0101-0201-LED AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 112 608
1 2 3 4 5 6 7 8 9 10
6 PIECES LED FIXTURES
J0101-0301-LED
Layout: 11-2-2020
N L COMD+D- PE 1 2 1 2 1 2 1 2 1 2
-113U5 POWER SUPPLY DMX EM DC1 DC2 DC3 jump.
120...277VAC TRANSM. DALI
Plottime: 11:49:00
1 2 + -
1 2
-113U6
23-11-2022
IN OUT
Plot date:
PE
18
19
-X1
-113W3 1 2 3
36
GEERS 3G1,5
LED FIXTURES J0101-0301
of
Plot page: 14
-RST16i3
8X LED Light
120-277V / 77W
112 114
Drawing no.: Project: Rev.: Engineer:
LED FIXTURES J0101-0301-LED AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 113 608
1 2 3 4 5 6 7 8 9 10
6 PIECES LED FIXTURES
J0101-0102-LED
Layout: 11-2-2020
N L COMD+D- PE 1 2 1 2 1 2 1 2 1 2
-114U5 POWER SUPPLY DMX EM DC1 DC2 DC3 jump.
120...277VAC TRANSM. DALI
Plottime: 11:49:00
1 2 + -
1 2
-114U6
23-11-2022
IN OUT
Plot date:
PE
20
21
-X1
-114W3 1 2 3
36
GEERS 3G1,5
LED FIXTURES J0101-0102
of
Plot page: 15
-RST16i3
8X LED Light
120-277V / 77W
113 115
Drawing no.: Project: Rev.: Engineer:
LED FIXTURES J0101-0102-LED AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 114 608
1 2 3 4 5 6 7 8 9 10
6 PIECES LED FIXTURES
J0101-0202-LED
Layout: 11-2-2020
N L COMD+D- PE 1 2 1 2 1 2 1 2 1 2
-115U5 POWER SUPPLY DMX EM DC1 DC2 DC3 jump.
120...277VAC TRANSM. DALI
Plottime: 11:49:00
1 2 + -
1 2
-115U6
23-11-2022
IN OUT
Plot date:
PE
22
23
-X1
-115W3 1 2 3
36
GEERS 3G1,5
LED FIXTURES J0101-0202
of
Plot page: 16
-RST16i3
8X LED Light
120-277V / 77W
114 116
Drawing no.: Project: Rev.: Engineer:
LED FIXTURES J0101-0202-LED AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 115 608
1 2 3 4 5 6 7 8 9 10
6 PIECES LED FIXTURES
J0101-0302-LED
Layout: 11-2-2020
N L COMD+D- PE 1 2 1 2 1 2 1 2 1 2
-116U5 POWER SUPPLY DMX EM DC1 DC2 DC3 jump.
120...277VAC TRANSM. DALI
Plottime: 11:49:00
1 2 + -
1 2
-116U6
23-11-2022
IN OUT
Plot date:
PE
24
25
-X1
-116W3 1 2 3
36
GEERS 3G1,5
LED FIXTURES J0101-0302
of
Plot page: 17
-RST16i3
8X LED Light
120-277V / 77W
115 150
Drawing no.: Project: Rev.: Engineer:
LED FIXTURES J0101-0302-LED AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 116 608
1 2 3 4 5 6 7 8 9 10
PH TRANSMITTER 01 PH MEASURMENT 01 PH TRANSMITTER 02 PH MEASURMENT 02
TR-04-02 TR-04-03
Layout: 19-11-2020
L+
L+
5
6
24VDC + A out A out 24VDC + A out A out
+ - + -
Plottime: 11:49:00
24VDC - PROBE GND 24VDC - PROBE GND
13
SHIELD 16
13
SHIELD 16
L-
L-
CORE
CORE
-150W2 -150W5
23-11-2022
TR-04-02 TR-04-03
Plot date:
-150U3 -150U6
36
24VDC- 24VDC-
of
101.5 300.1
Plot page: 18
116 160
Drawing no.: Project: Rev.: Engineer:
PH MEASURMENT AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 150 608
1 2 3 4 5 6 7 8 9 10
ACID DOSING PUMP LYE PUMP TANK A DOSING PUMP TANK B DOSING PUMP
Layout: 19-11-2020
1/1
2/1
3/1
4/1
5/1
6/1
7/1
8/1
-X4 -X4 -X4 -X4 -X4 -X4 -X4 -X4
Plottime: 11:49:01
-160W2 1 2 -160W4 -160W6 -160W8
LAPP OLF 150 4X0,5WH GY LAPP OLF 150 4X0,5WH GY LAPP OLF 150 4X0,5WH GY LAPP OLF 150 4X0,5WH GY
ACID DOSING PUMP ACID DOSING PUMP ACID DOSING PUMP ACID DOSING PUMP
23-11-2022
2
5
-102M5 DOSING PUMP -102M6 LYE PUMP -102M7 DOSING PUMP -102M8 DOSING PUMP
102.5 102.6 102.7 102.8
Plot date:
36
of
Plot page: 19
150 201
Drawing no.: Project: Rev.: Engineer:
DOSING PUMPS AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 160 608
1 2 3 4 5 6 7 8 9 10
24VDC+ 24VDC+ 24VDC+
101.5 24VDC+
Layout: 03-02-2020
-201F2 -201F3 -201F4
3A 3A 3A
AFS 4 2C 10-36V BK
Plottime: 11:49:01
24VDC_PLC
24VDC_EXT
24VDC_I/O
23-11-2022
400.1
400.1
Plot date:
36
of
Plot page: 20
160 300
Drawing no.: Project: Rev.: Engineer:
DC DISTRIB. AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
WASTE CONVEYOR Date: =X_WMU Page: Last :
23-11-2022 201 608
1 2 3 4 5 6 7 8 9 10
POE SWITCH INDUSTRIAL SWITCH
24VDC_NETWORK 24VDC_NETWORK
150.10 24VDC- 24VDC- 400.1
Layout: 28-1-2021
-300U4 + - -300U8 + -
48-57VDC 24VDC
X9
X1
X2
Plottime: 11:49:01
-300B3.1 -300B6.1
X3
X4
J0101-0101-CAM J0101-0202-CAM
X4
X8
-300B3.2 -300B6.2
X5
J0101-0201-CAM J0101-0302-CAM
X3
X7
23-11-2022
-300B3.3 -300B6.3
J0101-0301-CAM J0101-CAM
X2
X6
Plot date:
-300B3.4
J0101-0102-CAM
X1
X5
36
of
Plot page: 21
201 400
Drawing no.: Project: Rev.: Engineer:
NETWORK CAMERAS AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 300 608
1 2 3 4 5 6 7 8 9 10
_92
RM
-TERM_00
-TE
CX8190 EL6021 EL1018 EL1018 EL1018 EL3054 EL6224 EL2008 EL2008 EL9190 EL2784 EL2784 -TEC62 Ethercat EK1322
END TERMINAL
X001
300.7 ETH_PLC
Layout: 03-02-2020
Junction
24V 0V X1
X101
X_J01_AHU
+ +
EL9011
+ +
X102 Waat naar toe
Junction gaat naar de HVAC
X2
Plottime: 11:49:01
(lucht behandeling)
- - - -
23-11-2022
PE PE
-TERM_93
PEPE
US UP
24V
24V
-TERM_51-TERM_01-TERM_02-TERM_03-TERM_21-TERM_61-TERM_11-TERM_12 -TERM_41-TERM_42
0V
0V
Plot date:
36
101.9 24VAC 24VAC 607.1
of
201.3 24VDC_I/O 24VDC_I/O 501.1
Plot page: 22
201.2 24VDC_PLC 24VDC_PLC
300.10 24VDC- 24VDC- 501.1
300 450
Drawing no.: Project: Rev.: Engineer:
PLC LAYOUT AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 400 608
1 2 3 4 5 6 7 8 9 10
POWER MEASUREMENT
100.7 D+
100.7 D-
Layout: 10-11-2022
Plottime: 11:49:01
23-11-2022
-450R2
120 ohm
Plot date:
EL6021 -TERM_51
36
of
Plot page: 23
400 500
Drawing no.: Project: Rev.: Engineer:
PLC_MODBUS_TERM_51 AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 450 608
1 2 3 4 5 6 7 8 9 10
Layout: 03-02-2020
SURGE PROTECTION 6 IN 4 MIXING PUMP T-MAX 6 IN 4 LYE PUMP IN 4
6 503.5
501.5 SW-04-01 502.5 P-05-04
3 IN
PHASE MONITORING RELAYS5
501.6
DRAIN PUMP BREAKER 3OKIN 5
P-07-01 502.6
LEVEL SWITCH TANK A 3 IN 5
SW-05-02 503.6
IN 6
IRRIGATION FLOW MEASUREMENT
7 501.7 DRAIN PUMP TEMP. OK 7 IN 6 TANK A DOSING PUMP 7 IN 6
SW-03-02 SW-07-01 502.7 P-05-02 503.7
IN 7
DRAINAGE FLOW MEASUREMENT
4 501.8 SPARE 4 IN 7 LEVEL SWITCH TANK B 4 IN 7
SW-07-02 502.8 SW-05-01 503.8
CONDENSATE 8 IN 8
501.9
SPARE IN 8
8 502.9 TANK B DOSING PUMP 8 IN 8
P-05-01 503.9
Plottime: 11:49:01
23-11-2022
Plot date:
36
of
Plot page: 24
450 501
Drawing no.: Project: Rev.: Engineer:
PLC DIGITAL I/O AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
INPUT Date: =X_WMU Page: Last :
23-11-2022 500 608
1 2 3 4 5 6 7 8 9 10
24VDC IO DOOR SWITCH LED POWER OK SURGE PROTECTION PHASE MONITORING RELA
IRRIGATION
YS FLOW MEASUREMENT
DRAINAGE FLOW MEASUREMENT CONDENSATE
OK J01-CELL-SW SW-03-02 SW-07-02 SW-08-01
+
-X10 -X10 -X10 -X10
Layout: 03-02-2020
-501W7 1 -501W8 1 -501W9 1
LAPP OLF 150 2X0,5 LAPP OLF 150 2X0,5 LAPP OLF 150 2X0,5
-501W3 1 IRRIGATION FLOW IRRIGATION FLOW IRRIGATION FLOW
LAPP OLF 150 2X0,5
DOOR SWITCH
+ + +
13
11
11
-501S3 -110F2 -101U3 -104U2
DOOR SWITCH 110.2 101.3 104.2
J01-CELL-SW -501LC7 -501LC8 -501LC9
14
FLOW FLOW FLOW
12
14
12
14
SW-03-02 S
SW-07-02 S S
Plottime: 11:49:02
-501W3 2
-501W7 2 -501W8 2 -501W9 2
23-11-2022
1
4
-X10 -X10 -X10 -X10
Plot date:
1 5 2 6 3 7 4 8
500.2 IN 1 -TERM_01 500.2 IN 2 -TERM_01 500.2 IN 3 -TERM_01 500.2 IN 4 -TERM_01 500.2 IN 5 -TERM_01 500.2 IN 6 -TERM_01 500.2 IN 7 -TERM_01 500.2 IN 8 -TERM_01
36
of
Plot page: 25
500 502
Drawing no.: Project: Rev.: Engineer:
PLC_DI_TERM_01 - GENERAL AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 501 608
1 2 3 4 5 6 7 8 9 10
IRRIGATION PUMP BREAKER OKIRRIGATION PUMP T-MAX MIXING PUMP BREAKER OK MIXING PUMP T-MAX DRAIN PUMP BREAKER OK DRAIN PUMP TEMP. OK SPARE SPARE
P-03-01 SW-03-01 P-04-01 SW-04-01 P-07-01 SW-07-01
+
-X10 -X10 -X10 -X10 -X10
Layout: 26-2-2020
-502W3 1 -502W5 1 -502W7
LAPP OLF 150 2X0,5 LAPP OLF 150 2X0,5 SAC-4P-10,0- BNBU
IRRIGATION PUMP MIXING PUMP PUR/M12FS
T-MAX T-MAX DRAIN PUMP TEMP. OK
BR
BU
53
53
53
1
1
-103F2 -502B3 -103F4 -502B5 -103F6 -502U7
103.2 40°c 103.4 40°c 103.6 40°c
54
54
54
2
2
SW-03-01 SW-04-01 TK6130 NC NO
SW-07-01
WH
BK
Plottime: 11:49:02
-502W3 2 -502W5 2 -502W7
WH
23-11-2022
5
9
-X10 -X10 -X10 -X10 -X10
Plot date:
1 5 2 6 3 7 4 8
500.4 IN 1 -TERM_02 500.4 IN 2 -TERM_02 500.4 IN 3 -TERM_02 500.4 IN 4 -TERM_02 500.4 IN 5 -TERM_02 500.4 IN 6 -TERM_02 500.4 IN 7 -TERM_02 500.4 IN 8 -TERM_02
36
of
Plot page: 26
501 503
Drawing no.: Project: Rev.: Engineer:
PLC_DI_TERM_02 - WMU AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 502 608
1 2 3 4 5 6 7 8 9 10
LEVEL SWITCH ACID TANK ACID DOSING PUMP ALARM LEVEL SWITCH LYE LYE PUMP LEVEL SWITCH TANK A TANK A DOSING PUMP LEVEL SWITCH TANK B TANK B DOSING PUMP
SW-05-03 P-05-03 SW-05-04 P-05-04 SW-05-02 P-05-02 SW-05-01 P-05-01
+
-X10 -X10 -X10 -X10 -X10 -X10 -X10 -X10
Layout: 26-2-2020
-503W2 1 -503W4 1 -503W6.1 1 -503W8 1
LAPP OLF 150 2X0,5 LAPP OLF 150 2X0,5 LAPP OLF 150 2X0,5 LAPP OLF 150 2X0,5
LEVEL SWITCH ACID 160.3
102M5-5 LEVEL SWITCH ACID 160.5
102M6-5 LEVEL SWITCH ACID 160.7
102M7-5 LEVEL SWITCH ACID 160.9
102M8-5
5
-102M5 DOSING PUMP -102M6 LYE PUMP -102M7 DOSING PUMP -102M8 DOSING PUMP
102.5 102.6 102.7 102.8
-503LS2 -503LS4 -503LS6 -503LS8
SW-05-03 SW-05-04 SW-05-02 SW-05-01
Plottime: 11:49:02
OUT1 OUT2 OUT1 OUT2 OUT1 OUT2 OUT1 OUT2
4
4
-503W2 2 -160W2 4 -503W4 2 -160W4 4 -503W6.2 2 -160W6 4 -503W8 2 -160W8 4
LAPP OLF 150 4X0,5 BK LAPP OLF 150 4X0,5 BK LAPP OLF 150 4X0,5 BK LAPP OLF 150 4X0,5 BK
ACID DOSING PUMP ACID DOSING PUMP ACID DOSING PUMP ACID DOSING PUMP
23-11-2022
10
12
13
14
15
16
17
11
Plot date:
1 5 2 6 3 7 4 8
500.6 IN 1 -TERM_03 500.6 IN 2 -TERM_03 500.6 IN 3 -TERM_03 500.6 IN 4 -TERM_03 500.6 IN 5 -TERM_03 500.6 IN 6 -TERM_03 500.6 IN 7 -TERM_03 500.6 IN 8 -TERM_03
36
of
Plot page: 27
502 550
Drawing no.: Project: Rev.: Engineer:
PLC_DI_TERM_03 - WMU AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 503 608
1 2 3 4 5 6 7 8 9 10
Layout: 03-02-2020
SPARE IN 2
3 555.4
2
SPARE IN 3
5 555.6
DRAIN TANK LEVEL AI2
5 553.3
TR-07-01 SPARE IN 4
A 7 555.8
6
PH MEASURMENT 01 AI3
3 553.4
TR-04-02
Plottime: 11:49:02
A
4
PH MEASURMENT 02 AI4
7 553.5
TR-04-03
A
23-11-2022
8
Plot date:
36
of
Plot page: 28
503 553
Drawing no.: Project: Rev.: Engineer:
PLC ANALOG I/O AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
OUTPUT Date: =X_WMU Page: Last :
23-11-2022 550 608
1 2 3 4 5 6 7 8 9 10
DAY STORAGE TANK LEVEL DRAIN TANK LEVEL PH MEASURMENT 01 PH MEASURMENT 02
TR-03-01 TR-07-01 TR-04-02 TR-04-03
+
-X13 -X13
Layout: 30-3-2020
-553W2 -553W3
PVC CABLE PVC CABLE
BN
+ BN +
A A
Plottime: 11:49:02
-553P2 -553P3
150.4
150.7
PS3208 P PS3208 P
0,25 bar 4-20mA
S
0,25 bar 4-20mA
S
TR-03-01 TR-07-01
-150U2
-150U5
WH
HW
23-11-2022
1
-X13 -X13
1 2 5 6 3 4 7 8
Plot date:
550.3 AI1 -TERM_21 550.3 AI2 -TERM_21 550.3 AI3 -TERM_21 550.3 AI4 -TERM_21
36
of
Plot page: 29
550 555
Drawing no.: Project: Rev.: Engineer:
PLC_AI_TERM_21 - WMU AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 553 608
1 2 3 4 5 6 7 8 9 10
EC MEASURMENT SPARE SPARE SPARE
TR-04-01
PE
PE
+
+
-X13 -X13 -X13 -X13
Layout: 28-1-2021
-555W2
SAC-4P-5,0-PUR/M12FS Bn Wh
EC PROBE 01
WH (out2)
BK (out1)
BN (L+)
BU (L-)
GND
-555U2
Plottime: 11:49:03
TR-04-01
EC PROBE
-555W2
Bu
23-11-2022
3
-X13 -X13 4
Plot date:
550.6 IN 1 -TERM_61 550.6 IN 2 -TERM_61 550.6 IN 3 -TERM_61 550.6 IN 4 -TERM_61
36
of
Plot page: 30
553 600
Drawing no.: Project: Rev.: Engineer:
PLC_IO_TERM_61 - WMU AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 555 608
1 2 3 4 5 6 7 8 9 10
Layout: 03-02-2020
SPARE OUT 4
8 602.5 DRAINAGE PUMP OUT 4
8 603.8
P-07-01
SPARE OUT 5
3 602.6 ACID DOSING PUMP OUT 5
3 604.2
P-05-03
SPARE OUT 6
7 602.7 LYE PUMP OUT 6
7 604.4
P-05-04
SPARE OUT 7
4 602.8 TANK A DOSING PUMP OUT 7
4 604.6
P-05-02
SPARE OUT 8
8 602.9 TANK B DOSING PUMP OUT 8
8 604.8
P-05-01
Plottime: 11:49:03
-TERM_41 EL2784 -TERM_42 EL2784
OUT 1
DAY STORAGE TANK FILL VALVE
1 607.2 IRRIGATION VALVE R TOP 1 OUT 1
23-11-2022
SOV-01-01 SOV-06-04 608.2
2/- 2/-
IRRIGATION VALVE L TOP 5 OUT 2 IRRIGATION VALVE R MID 5 OUT 2
SOV-06-01 607.4 SOV-06-05 608.4
Plot date:
6/- 6/-
IRRIGATION VALVE L MID 4 OUT 3 IRRIGATION VALVE R BOTTOMOUT 3
4 608.6
SOV-06-02 607.6 SOV-06-06
3/- 3/-
36
IRRIGATION VALVE L BOTTOMOUT 4
8 607.8 SPARE OUT 4
8 608.8
SOV-06-03
of
7/- 7/-
Plot page: 31
SOLID STATE CONTACTS SOLID STATE CONTACTS
555 602
Drawing no.: Project: Rev.: Engineer:
PLC DIGITAL I/O AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
OUTPUT Date: =X_WMU Page: Last :
23-11-2022 600 608
1 2 3 4 5 6 7 8 9 10
LED RED LED GREEN SPARE SPARE SPARE SPARE SPARE SPARE
600.2 OUT 1 -TERM_11 600.2 OUT 2 -TERM_11 600.2 OUT 3 -TERM_11 600.2 OUT 4 -TERM_11 600.2 OUT 5 -TERM_11 600.2 OUT 6 -TERM_11 600.2 OUT 7 -TERM_11 600.2 OUT 8 -TERM_11
1 5 4 8 3 7 4 8
Layout: 03-02-2020
Plottime: 11:49:03
23-11-2022
X1
X1
Plot date:
-602P2 -602P3
RED GREEN
X2
X2
36
of
Plot page: 32
600 603
Drawing no.: Project: Rev.: Engineer:
PLC_DO_TERM_11 - GENERAL AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 602 608
1 2 3 4 5 6 7 8 9 10
SPARE IRRIGATION PUMP MIXING PUMP DRAINAGE PUMP
P-03-01 P-04-01 P-07-01
600.5 OUT 1 -TERM_12 600.5 OUT 2 -TERM_12 600.5 OUT 3 -TERM_12 600.5 OUT 4 -TERM_12
1 5 4 8
Layout: 4-3-2020
2
2
-603SK4 -603SK6 -603SK8
1= AUTO 1= AUTO 1= AUTO
0= UIT 0= UIT 0= UIT
2= HAND 2= HAND 2= HAND
Plottime: 11:49:03
555.10 24VDC_I/O 24VDC_I/O 604.1
23-11-2022
Plot date:
A1
A1
A1
-603QM4 -603QM6 -603QM8
A2
A2
A2
602.10 24VDC- 24VDC- 604.1
36
H M V H M V H M V
103.2 103.4 103.6
of
Plot page: 33
602 604
Drawing no.: Project: Rev.: Engineer:
PLC_DO_TERM_12 - WMU/CELL AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 603 608
1 2 3 4 5 6 7 8 9 10
ACID DOSING PUMP LYE PUMP TANK A DOSING PUMP TANK B DOSING PUMP
P-05-03 P-05-04 P-05-02 P-05-01
600.5 OUT 5 -TERM_12 600.5 OUT 6 -TERM_12 600.5 OUT 7 -TERM_12 600.5 OUT 8 -TERM_12
3 7 4 8
Layout: 25-11-2020
2
2
-604SK2 -604SK4 -604SK6 -604SK8
1= AUTO 1= AUTO 1= AUTO 1= AUTO
0= UIT 0= UIT 0= UIT 0= UIT
2= HAND 2= HAND 2= HAND 2= HAND
1
3
AUTO = SUSPENDED AUTO = SUSPENDED AUTO = SUSPENDED AUTO = SUSPENDED
Plottime: 11:49:03
603.10 24VDC_I/O 24VDC_I/O
23-11-2022
Plot date:
A1
A1
A1
A1
-604K2 -604K4 -604K6 -604K8
A2
A2
A2
A2
603.10 24VDC- 24VDC-
36
M V M V M V M V
160.2 160.4 160.6 160.8
of
Plot page: 34
603 607
Drawing no.: Project: Rev.: Engineer:
PLC_DO_TERM_12 - WMU AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 604 608
1 2 3 4 5 6 7 8 9 10
DAY STORAGE TANK FILL VALVE IRRIGATION VALVE L TOP IRRIGATION VALVE L MID IRRIGATION VALVE L BOTTOM
SOV-01-01 SOV-06-01 SOV-06-02 SOV-06-03
600.2 OUT 1 -TERM_41 600.2 OUT 2 -TERM_41 600.2 OUT 3 -TERM_41 600.2 OUT 4 -TERM_41
1 2/- 5 6/- 4 3/- 8 7/-
Layout: 4-3-2020
2
2
-607SK2 -607SK4 -607SK6 -607SK8
1= AUTO 1= AUTO 1= AUTO 1= AUTO
0= UIT 0= UIT 0= UIT 0= UIT
2= HAND 2= HAND 2= HAND 2= HAND
1
3
400.7 24VAC 24VAC 608.1
Plottime: 11:49:03
+
+
1
4
-X11 -X11 -X11 -X11
-607W2 1 -607W4 1 -607W4 2 -607W4 3
LAPP OLF 150 2X0,5 LAPP OLF 150 7G0,5 LAPP OLF 150 7G0,5 LAPP OLF 150 7G0,5
FILL VALVE IRRIGATION LANE 01 IRRIGATION LANE 01 IRRIGATION LANE 01
=SOV_LANE 01
23-11-2022
1
-607Y2
1
1
SOV-01-01 -607Y4 -607Y6 -607Y8
2
2
-607W2 2
Plot date:
-607W4 4
36
101.9 0VAC 0VAC 608.1
of
Plot page: 35
604 608
Drawing no.: Project: Rev.: Engineer:
PLC_DO_TERM_41 - WMU AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 607 608
1 2 3 4 5 6 7 8 9 10
IRRIGATION VALVE R TOP IRRIGATION VALVE R MID IRRIGATION VALVE R BOTTOM SPARE
SOV-06-04 SOV-06-05 SOV-06-06
600.5 OUT 1 -TERM_42 600.5 OUT 2 -TERM_42 600.5 OUT 3 -TERM_42 600.5 OUT 4 -TERM_42
1 2/- 5 6/- 4 3/- 8 7/-
Layout: 25-11-2020
2
2
-608SK2.2 -608SK4 -608SK6
1= AUTO 1= HAND 1= AUTO
0= UIT 0= UIT 0= UIT
2= HAND 2= AUTO 2= HAND
1
3
607.10 24VAC 24VAC
Plottime: 11:49:03
+
+
5
8
-X11 -X11 -X11 -X11
-608W2 1 -608W2 2 -608W2 3
LAPP OLF 150 2X0,5 LAPP OLF 150 2X0,5 LAPP OLF 150 2X0,5
IRRIGATION LANE 02 IRRIGATION LANE 02 IRRIGATION LANE 02
=SOV_LANE 02
23-11-2022
1
1
-608Y2 -608Y4 -608Y6
SOV-06-04 SOV-06-05 SOV-06-06
2
Plot date:
-608W2 4
36
607.10 0VAC 0VAC
of
Plot page: 36
607 1
Drawing no.: Project: Rev.: Engineer:
PLC_DO_TERM_42 - WMU AVF+ Junior X_J01_WMU 1.0 PVH_HEAD
1938_E11_WMU_221123
Date: =X_WMU Page: Last :
23-11-2022 608 608