Professional Documents
Culture Documents
PCR 3 PCR 4
PE SHEET
PCR 2 CU
117 KW
no
AHU
AHU 2
no AHU 117 KW
PCR 1
582 KW
Note :
= Condition OK, still running ( as no : 3, 5, 6, 7A )
STEELASTIC
161 KW
CUTTING
I/C
234 KW
872 KW
CURRENT CONDITION CHILLER F#2 cooling capacity
* If we separate steelastic, we can run 7 Unit AHU for tyre building F #2, as 1170 kw
1. AHU tyre buildings 7 X 117 = 819 kw
2. I/C cooller = 234 kw
3. PE sheet = 117 kw
Coolling capacity
1 PK = 0,746 KW
1 KW = 1.340 PK
1 KW = 12064 btu
1 PK = ± 9000 btu
CHILLER FACTORY #2 NEXT
OK PCR 3 OK OK
PCR 4
OK
PE SHEET
117 KW
PCR 2 CU
OK install
rubber
no mounting
AHU
PCR 1
582 KW
Note :
= Condition OK, still running ( as no : 3, 5, 6, 7A )
STEELASTIC
117 KW
next 161 KW
CUTTING
I/C
234 KW
872 KW
1053 1454
161
117
234
1565
CHILLER FACTORY #1 CURRENT CONDITION
CUTTING PCR
AC 30 AC29 AC28 AC 27 AC 26 AC 25
CUTTING PCR
Blocked
AHU OK OK
TB AREA
872 KW 872 KW
STOP RUN
Coolling capacity
1 PK = 0,746 KW
1 KW = 1.340 PK
1 KW = 12064 btu
1 PK = ± 9000 btu
PCR
OK
AHU 12
AC 23 AC 22 AC21
PCR
OK
AHU 12
AC 11 AC 13 AC 14 AC 15 AC 16
TB AREA
872 KW
RUN
CURRENT CONDITION CHILLER F#1 cooling capacity
* If no 4 AHU running
1. AHU tyre building 5 X 117 KW = 585 kw (as 67% from total capacity )
Coolling capacity
1 PK = 0,746 KW
1 KW = 1.340 PK
1 KW = 12064 btu
1 PK = ± 9000 btu
7.452991
CHILLER FACTORY #1 CURRENT CONDITION
CUTTING PCR
next
AHU 12
AC 30 AC28 AC 27 AC 26 AC 25
CUTTING PCR
Blocked OK OK
AHU will
repair
TB AREA
872 KW 872 KW
STOP RUN
Coolling capacity
1 PK = 0,746 KW
1 KW = 1.340 PK
1 KW = 12064 btu
1 PK = ± 9000 btu
PCR
OK
AHU 24
AC 23 AC 22 AC21
PCR
OK
AHU 12
AC 11 AC 13 AC 14 AC 15 AC 16
TB AREA
872 KW
RUN