CHILLER FACTORY #2 CURRENT CONDITION

PCR 3 PCR 4

AHU 3 AHU 4 AHU 5 AHU 6

PE SHEET
PCR 2 CU
117 KW

no
AHU

AHU 2
no AHU 117 KW

PCR 1

582 KW

Note :
= Condition OK, still running ( as no : 3, 5, 6, 7A )

= Condition OK, but not running ( as no : 2, 4, 7B, 8 )


= Non AHU using
Coolling capacity
1 PK = 0,746 KW
1 KW = 1.340 PK
1 KW = 12064 btu
1 PK = ± 9000 btu
PCR 4 T TYRE

AHU 7A AHU 7B AHU 8

STEELASTIC

161 KW

CUTTING

I/C

234 KW

872 KW
CURRENT CONDITION CHILLER F#2 cooling capacity

* Chiller running = 1454 KW ( 80% = 1163 KW )


1. 582 KW
2. 872 KW

* Using condition = 1097 kw


1. AHU tyre building 5 X 117 KW = 585 kw
2. AHU steelastic = 161 kw
3. Cooling for I/C = 234 kw
4. Cooling for PE sheet = 117 kw

* To separate chiller for steelastic = 201 kw


1. 161 kw X 100/80 = 201 kw

* If we separate steelastic, we can run 7 Unit AHU for tyre building F #2, as 1170 kw
1. AHU tyre buildings 7 X 117 = 819 kw
2. I/C cooller = 234 kw
3. PE sheet = 117 kw

Coolling capacity
1 PK = 0,746 KW
1 KW = 1.340 PK
1 KW = 12064 btu
1 PK = ± 9000 btu
CHILLER FACTORY #2 NEXT

OK PCR 3 OK OK
PCR 4
OK

AHU 3 AHU 4 AHU 5 AHU 6

PE SHEET

117 KW
PCR 2 CU
OK install
rubber
no mounting
AHU

no AHU AHU 2 117 KW

PCR 1

582 KW

Note :
= Condition OK, still running ( as no : 3, 5, 6, 7A )

= Condition OK, but not running ( as no : 2, 4, 7B, 8 )


= Non AHU using
Coolling capacity
1 PK = 0,746 KW
1 KW = 1.340 PK
1 KW = 12064 btu
1 PK = ± 9000 btu
PCR 4 OK OK
T TYRE 200 KW
OK OK

AHU 7A AHU 7B AHU 8

STEELASTIC
117 KW
next 161 KW

CUTTING

I/C

234 KW

872 KW
1053 1454
161
117
234
1565
CHILLER FACTORY #1 CURRENT CONDITION

CUTTING PCR

AC 30 AC29 AC28 AC 27 AC 26 AC 25

CUTTING PCR
Blocked
AHU OK OK

AHU 4 AHU 8 AHU 9


AC 1 AC 2 AC 3 AC 5 AC 6 AC 7 AC 10 AC 11

TB AREA

872 KW 872 KW
STOP RUN
Coolling capacity
1 PK = 0,746 KW
1 KW = 1.340 PK
1 KW = 12064 btu
1 PK = ± 9000 btu
PCR
OK

AHU 12
AC 23 AC 22 AC21

PCR
OK

AHU 12
AC 11 AC 13 AC 14 AC 15 AC 16

TB AREA

872 KW
RUN
CURRENT CONDITION CHILLER F#1 cooling capacity

* Chiller running = 872 KW ( 80% = 698 KW )


1. 872 KW

* Current Using condition


1. AHU tyre building 4 X 117 KW = 468 kw ( as 53% from total capacity )

* If no 4 AHU running
1. AHU tyre building 5 X 117 KW = 585 kw (as 67% from total capacity )

* For next condition


1. AHU tyre building 6 X 117 KW = 702 kw (as 81% from total capacity )

Coolling capacity
1 PK = 0,746 KW
1 KW = 1.340 PK
1 KW = 12064 btu
1 PK = ± 9000 btu
7.452991
CHILLER FACTORY #1 CURRENT CONDITION

CUTTING PCR
next

AHU 12
AC 30 AC28 AC 27 AC 26 AC 25

CUTTING PCR
Blocked OK OK
AHU will
repair

AHU 4 AHU 8 AHU 9


AC 1 AC 2 AC 3 AC 5 AC 6 AC 7 AC 10 AC 11

TB AREA

872 KW 872 KW
STOP RUN
Coolling capacity
1 PK = 0,746 KW
1 KW = 1.340 PK
1 KW = 12064 btu
1 PK = ± 9000 btu
PCR
OK

AHU 24
AC 23 AC 22 AC21

PCR
OK

AHU 12
AC 11 AC 13 AC 14 AC 15 AC 16

TB AREA

872 KW
RUN