(ADCOP)
CONSULTING
EN GI N EERS
2 REFERENCE DOCUMENTS…………………………………….…..…………………………………..4
3 RESPONSIBILITIES………………………………………..……………………………………………..4
4 DEFINITION………………………………………………………………………………………………..4
5 PROCEDURE……………………………………………………………………………………………..4
6 RELATED DOCUMENTATION………………………..……………………………………..…………..6
7 RECORD FORMATS…………………………………….………………………………………………..6
The purpose of this procedure is to define the extent, sequence and methods of the quality assurance audits
inside ADCOP Project, including the audits to subcontractors and vendors by CPECC to verify the conformity
and effectiveness of implementation of the quality management system.
This procedure is applicable to the audit activities of ADCOP Project quality management system.
2 REFERENCE DOCUMENTS
3 RESPONSIBILITIES
3.1 QA/QC manager is responsible for ensuring the development and implementation of the project Internal Audit
Programme.
3.2 The CPECC departments/ Suppliers/Subcontractors to which nonconformity items are issued shall ensure
that actions are taken without delay to eliminate detected nonconformities and their causes. Follow-up
activities shall include the verification of the actions taken and the reporting of verification results.
4 DEFINITION:
Corrective Action – the action taken to correct an identified noncompliance, Criticality level is assigned to
corrective action as below.
4.1 C1 : Correction required immediately due to immediate threat to personnel well being, integrity of
product or threat to the environment, current or impending financial loss.
4.2 C2 : Correction required within one month due to situation that could lead to systematic breakdown of
process causing personnel injury, product failure or financial loss.
4.3 C3 : Correction required within three month due to an ineffective, convoluted or unproductive process
or activity that would not seriously affect the business but required to be improved.
5 PROCEDURE
5.1.2 It may be raised by the Lead/Internal Auditor during the course of an Internal Audit.
DOCUMENT TITLE : EPC Service Activities of ADCOP Project
Project No:
QUALITY AUDIT CONTROL PROCEDURE E
PROJECT: ABU DHABI CRUDE OIL PIPELINE PROJECT Page 4 of 10
DOCUMENT No.: 30-99-90-1615 Rev. 1 DATE : 26/06/2008
5.2 Numbering of CAR’s. Typical example of structure
Here BEL for Belleli and VO for Van Oord similarly for other subcontract/department.
10A and 10B First ( 10A)and second (10B) Part of Bi-annual schedule
CAR for Corrective Action Request and 001 and 003 are serial number for that sub contract/department.
5.3.1 The Lead/Internal Auditor shall obtain agreement from management of the function/department on subjects
of CARs to the facts stated.
• The requirement which is on compliant (including paragraph or clause number of the procedures codes
or standards legislation etc.)
5.3.3 The CAR shall be formally issued by the relevant Auditor to the manager of the function within which
noncompliance has been reported. Lead Auditor/Auditor with the help of Quality Coordinators is responsible
for obtaining corrective/Preventive action, follow up and close out of these actions.
5.3.4 CARs raised as result of an audit will be presented to the manager of the responsible function for signatory
agreement and action response at the audit close out meeting.
5.3.5 Responsibility for providing corrective and preventive action and effective date for their implementation lies
with the management of the function or department affected who shall complete Part B of the CAR.
Effective date for corrective and preventive actions should take consideration of the realistic time scale
required to institute those action specified.
5.3.6 Copies of the CARs received outwith the audit process will be issued to the Lead Auditor/Auditor.
5.3.7 CAR Over due will be followed by the Lead Auditor/Auditor in the following circumstances:
5.4.1 When on follow up the promised actions have been implemented but are seen and agreed to be
ineffective then new action and revised effective date shall be recorded and CAR will remain open for
further action.
5.4.2 When the effectiveness of the corrective/preventive action can not be verified due to the activity
concerned being of an infrequent nature then Lead auditor may close out the CAR. When this decision is
taken then the close out section of the CAR shall so indicate.
5.4.3 On Satisfactory close out, Part C shall be completed and signed off by the Auditor.
Audit CAR status shall be discussed and minuted in regular quality meetings and distributed to all
concerned.
5.5 When CAR raised during an audit can not be agreed between auditor and auditee. Auditee can note his
comment of disagreement and CAR be issued by auditor with auditee remarks.
5.6 Records
Records& Register of CARs raised from the audit process shall be maintained and tracked to completion by
the auditor.
5.7 Reporting
Trends Graphs and Charts will be reported at least monthly to the CPECC QA/QC Manager by the lead
auditor, showing trends and quantities by type and location.
5.8 Analysis of CARs and subsequent corrective and preventive actions shall form part of the Managemet
review process.
The End
QR.8.2.2-1
.....
......
AUDIT REPORT
QR8.2.2-3
DOCUMENT TITLE : EPC Service Activities of ADCOP Project
Project No:
QUALITY AUDIT CONTROL PROCEDURE E
PROJECT: ABU DHABI CRUDE OIL PIPELINE PROJECT Page 8 of 10
DOCUMENT No.: 30-99-90-1615 Rev. 1 DATE : 26/06/2008
CORRECTIVE ACTION REPORT
CAR Accepted:
Name: | Signature: | Dept:
POSITIVE REPORTING ASPECTS:
RESPONSE TO NONCOMPLIANCE:
B(RESPONSIBLE) DEPARTMENT/SUPPLIERS/SUBCONTRACTORS
ROOT CAUSE:
CORRECTIVE ACTION(S):
PREVENTIVE ACTION(S)
CLOSE OUT :
C
Name: Signature:
Date: Date:
(QA)
Legends: