You are on page 1of 1

Column

Column 1

Dead load:
a. Roof

(
Metal roofing and purlins - 0.140
kN
m2 )
( 1 0 m )( 8.5 m )=11 . 9 kN

(
Rafters and Bracing - 0.24
kN
m
2 )
(1 0 m ) (8.5 m)=2 0.4 k N

b. Floor Finishes

(
Ceramic 20 mm tiles - 1.1
kN
m2 )
( 10 m ) ( 8.5 m )=93 . 5 kN

c. Weight of concrete -

(
( unit weight of concrete ) × ( 0.50 mm2 ) × ( total floor area ) → 23.56
kN
m 3)( 0.5 0 mm2 ) ( 1 0 m )( 8.5 m)=
Total Dead Load=11271.1 kN

Live load:

(
Basic Floor Area (Residential) - 1.9
kN
m2 )
( 1 0 m) (8.5 m)=1 61 .5 kN /m

kN
Total Live Load=161. 5
m
Compute for Pu:
P u=1.2 ( Dl ) +1.6 ( Ll )

P u=1.2 ( 1001.3 kN ) +1.6 ( 161. 5 kN )


P u=1610 . 92 kN