You are on page 1of 13

L&T Construction

XXXXXXXXXXXXXXX
Project NEOM GREEN HYDROGEN PROJECT
Power Transmission & Distribution
Doc. No: PM210012-XXXXXXXXXXXXXX Rev No: 01 Date: XX.XX.2022 Page 1 of 13

PM210012-LTT5XXX-XXX-XXXXXX
Method Statement for ceramic tiles
Project: NEOM GREEN HYDROGEN PROJECT
NEOM GREEN HYDROGEN PROJECT
Page 1 of 13
XXXXXXXXXXXXXXX
Project NEOM GREEN HYDROGEN PROJECT
Doc. No: PM210012-XXXXXXXXXXXXXX Rev No: 01 Date: XX.XX.2022 Page 2 of 13

Project NEOM GREEN HYDROGEN PROJECT – POWER NETWORK

Customer AIR PRODUCTS

Contractor LARSEN & TOUBRO

Discipline  Civil

Document Title Method Statement for ceramic tiles

Document No. PM210012-LTTXXX-XXX-XXXXX

Revision No. Rev. XX

Prepared by Reviewed by Approved by

<<NAME>> <<NAME>> <<NAME>>


<<Designation>> <<Designation>> <<Designation>>

Date: DD.MM.YYYY Date: DD.MM.YYYY Date: DD.MM.YYYY

Project: NEOM GREEN HYDROGEN PROJECT Page 2 of 13


XXXXXXXXXXXXXXX
Project NEOM GREEN HYDROGEN PROJECT
Doc. No: PM210012-XXXXXXXXXXXXXX Rev No: 01 Date: XX.XX.2022 Page 3 of 13

Revision History
Purpose of
Rev. Description of Changes Date
Issue
00 XXXXXXXX IFA DD.MM.YYYY
01 XXXXXXXX IFA DD.MM.YYYY
02 XXXXXXXX IFA DD.MM.YYYY

Status Codes:
IFR: Issued for Review
IFA: Issued for Approval
IFC: Issued for Construction

Project: NEOM GREEN HYDROGEN PROJECT Page 3 of 13


XXXXXXXXXXXXXXX
Project NEOM GREEN HYDROGEN PROJECT
Doc. No: PM210012-XXXXXXXXXXXXXX Rev No: 01 Date: XX.XX.2022 Page 4 of 13

CONTENTS

1. PURPOSE.......................................................................................................................................................................
2. SCOPE............................................................................................................................................................................
3. REFERENCES..................................................................................................................................................................
4. ACRONYMS & DEFINITIONS.........................................................................................................................................
5. ROLES & RESPONSIBILITIES..........................................................................................................................................
6. PLANT, EQUIPMENT, TOOLS & TACKLES......................................................................................................................
7. MATERIALS...................................................................................................................................................................
8. WORKFORCE.................................................................................................................................................................
9. WORK METHODOLOGY................................................................................................................................................
10. APPENDICES..............................................................................................................................................................
APPENDIX – A............................................................................................................................................................
APPENDIX – B............................................................................................................................................................
APPENDIX – C............................................................................................................................................................

Project: NEOM GREEN HYDROGEN PROJECT Page 4 of 13


XXXXXXXXXXXXXXX
Project NEOM GREEN HYDROGEN PROJECT
Doc. No: PM210012-XXXXXXXXXXXXXX Rev No: 01 Date: XX.XX.2022 Page 5 of 13

1. PURPOSE
To ensure the Fixing of ceramic tiles has been done and inspected according to the NEOM /
AP requirements, project drawings specifications, and safety compliance, to protect the
people and to prevent damages and completion of work on time.

2. SCOPE
 Site preparation.
 Fixing ceramic tiles.

3. REFERENCES
 HSE Management Plan.
 Project Technical Specifications.
 ASTM D-482
 Applicable local regulation.

4. ACRONYMS & DEFINITIONS


 MOS – Method of Statement
 ASTM – American Society for Testing and Materials.
 EHS – Environmental Health.
 IFC – Issued For Construction
 PPE - Personal Protective Equipment
 ATM - Approved To Mobilize
 JSA - Job Safety Analysis
 OSHA- Occupational safety and health administration.

5. ROLES & RESPONSIBILITIES


Below mentioned personnel with the responsibilities entrusted to them shall be responsible
for carrying out below mentioned works. In addition to their roles and responsibilities
disseminated in the Project Quality & EHS Plans and the following specific activity functions
shall be carried out:

Project: NEOM GREEN HYDROGEN PROJECT Page 5 of 13


XXXXXXXXXXXXXXX
Project NEOM GREEN HYDROGEN PROJECT
Doc. No: PM210012-XXXXXXXXXXXXXX Rev No: 01 Date: XX.XX.2022 Page 6 of 13

1.
2.
3.
4.
5.
5.1. Project Manager
 Provide the team with appropriate resources to ensure that works are done in
accordance with the project Quality and EHS requirements and shall be responsible for
the approval of method statement and overall project management.

5.2. Construction Manager


 Reporting to the Project Manager and assisted by construction team as indicated in the
project organization chart.
 Ensure that method statement is prepared, established & control measures taken
before starting the work and guiding the team for implementation.
 Ensure latest approved drawings are available at site prior to start work.
 Follow-up & coordinate with design engineering team for preparation of drawing
Layout.
 Conduct training and awareness program for all personnel deployed for the activity.
 Obtain necessary approval as per contract requirement.

5.3. Site Engineer


 Directly reporting to the Construction Manager.
 Prepare method statement, take approval, and implement.
 Execute works according to latest method statement, drawing Layout, and contract
specifications.
 Orient/train the team to implement the method statements effectively.
 Maintain related records.
 Coordinate with Surveyor for survey works.
 Identify and adopt best practices.

Project: NEOM GREEN HYDROGEN PROJECT Page 6 of 13


XXXXXXXXXXXXXXX
Project NEOM GREEN HYDROGEN PROJECT
Doc. No: PM210012-XXXXXXXXXXXXXX Rev No: 01 Date: XX.XX.2022 Page 7 of 13

 Co-ordinate with Quality in charge for scheduling inspection & approval as per ITP.
 Make all necessary arrangements for inspection of work as per ITP.

5.4. Civil Foreman


 Directly reporting to the Site Engineer.
 Responsible on his own discipline for direct execution of works according to the plan.
 Directly control and instruct the working personnel.
 Ensure that works are performed with proper tool, equipment, and PPE’s.
 Ensure regular housekeeping of the entire work area.

5.5. Surveyor
 Study drawing and establish control points as per plot plan / approved drawing.
 Acquire information from reference stations & datum level provided by client; establish
new control points at site & cross verify with reference station/s and datum level.
 Conduct survey, prepare survey report, and maintain records.
 Provide route markings and obtain approvals.
 Ensure calibration of survey equipment and its maintenance.

5.6. QA/QC In-Charge and Engineer


 Quality In-charge shall review the method statements and ensure all requirements are
included.
 Schedule inspection of works in coordination with Site Engineer and as per ITP.
 Prepare and maintain inspection logs, records, and obtain approval from client
 Inspect the measuring equipment for calibration.
 Review Quality Control records and ensure correctness.
 Guide QC inspectors and ensure inspections & test of the activities are conducted as
per ITP.
 Check the activities as per ITP & checklist and prepare records and obtain approval.
 Prepare & maintain inspection log and records.

Project: NEOM GREEN HYDROGEN PROJECT Page 7 of 13


XXXXXXXXXXXXXXX
Project NEOM GREEN HYDROGEN PROJECT
Doc. No: PM210012-XXXXXXXXXXXXXX Rev No: 01 Date: XX.XX.2022 Page 8 of 13

5.7. Safety In-Charge


 Disseminate EHS requirements specific to the activities involved and facilitate
implementation.
 Prepare and coordinate the implementation of Risk Assessment plan.
 Ensure that work is carried out in safe manner in coordination with Site Engineer, sub-
contractors, etc.
 All concerned parties shall be exposed to the method statements applicable to their
working scope and must attend a safety briefing prior to carrying out any works on site.
 All personnel shall ensure safe working conditions prior to the start of work.
 Great emphasis shall be made on all matters of health, safety, and environmental both
in the workplace, and to the public during the execution of works.
 Check and ensure compliance of issuance and usage of Personal Protective Equipment
(PPE) by all employees and visitors

6. PLANT, EQUIPMENT, TOOLS & TACKLES


 Hand tools ( notched trowels).
 Metallic rules.
 Plastic universal anchors.
 Water level.
 Rubber hummer.
 Hand diamond cutter.
 Electrical table diamond cutter with water.
 Electrical drill.

7. MATERIALS
7.1 Materials
 Ceramic tiles.
 Fixing product.
 Nitotile GP: General purpose tile adhesive (…… …….. …..).
 Nitobond (SBR): water resistant polymer bonding admixture (…… ………. …).

Project: NEOM GREEN HYDROGEN PROJECT Page 8 of 13


XXXXXXXXXXXXXXX
Project NEOM GREEN HYDROGEN PROJECT
Doc. No: PM210012-XXXXXXXXXXXXXX Rev No: 01 Date: XX.XX.2022 Page 9 of 13

7.2 Consumable
 Stainless steel 8 m/m rod corner protection.
 Cross plastic spacers (6 m/m).

8. WORKFORCE
for one shift of 8hrs / day
 1 engineer
 1 Forman
 tiles fixer as needed
 workers as needed

9. WORK METHODOLOGY
9.1 Leveling & alignment
 The level & alignment point must be done carefully before starting the work.
 Backing to wall filling must be completed in accordance with technical specification.

 Corner protection shall be fixed in each corner to protect ceramic tiles edges.
It consist of a stainless steel Y8 m/m rod fixed with plastic universal anchors
(fisher).
9.2 Fixing ceramic tiles
The application procedure for fixing ceramic tiles using Nitotile GP & Nitobon SBR.
 All leakage through dW to be rectifired before setting.
 All surfaces must be soundness, clean and free from all traces of grease and oil.
All loose particles of mortar and deleterious materials must be removed.
 Concrete substrate should be soaked with water.
 Approximately 3 ltr. Of Nitobond SBR, and 3 ltr. Of clean water should be
added to 25 kg of Nitotile GP that mixed with a slow speed drill until a uniform,
lump free consistency is achieved.
 Allow the mix to stand for about 10 minutes mix again, then it is ready for use.
 Mixed Nitotile GP is spread on the substrate to a thickness not exceeding 10
m/m with a notched trowel. The tiles are then placed firmly into the adhesive
bed with a twisting motion.
 As an alternative, the product may be spread on the substrate to a thickness
of approximately half the total thickness of the bed, while the remaining
thickness is applied on the back of the tiles.
 After 4 to 5 days minimum of fixing the ceramic tiles, filling of joints must be
done with approved material.

Project: NEOM GREEN HYDROGEN PROJECT Page 9 of 13


XXXXXXXXXXXXXXX
Project NEOM GREEN HYDROGEN PROJECT
Doc. No: PM210012-XXXXXXXXXXXXXX Rev No: 01 Date: XX.XX.2022 Page 10 of 13

10. APPENDICES

Project: NEOM GREEN HYDROGEN PROJECT Page 10 of 13


XXXXXXXXXXXXXXX
Project NEOM GREEN HYDROGEN PROJECT
Doc. No: PM210012-XXXXXXXXXXXXXX Rev No: 01 Date: XX.XX.2022 Page 11 of 13

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

APPENDIX – A
<<TITLE>>

Project: NEOM GREEN HYDROGEN PROJECT Page 11 of 13


XXXXXXXXXXXXXXX
Project NEOM GREEN HYDROGEN PROJECT
Doc. No: PM210012-XXXXXXXXXXXXXX Rev No: 01 Date: XX.XX.2022 Page 12 of 13

APPENDIX – B
<<TITLE>>

Project: NEOM GREEN HYDROGEN PROJECT Page 12 of 13


XXXXXXXXXXXXXXX
Project NEOM GREEN HYDROGEN PROJECT
Doc. No: PM210012-XXXXXXXXXXXXXX Rev No: 01 Date: XX.XX.2022 Page 13 of 13

APPENDIX – C
<<TITLE>>

Project: NEOM GREEN HYDROGEN PROJECT Page 13 of 13