Professional Documents
Culture Documents
CH 1 – SYSTEM CONCEPT:
A - INTRODUCTION:
C - SYSTEM PARAMETERS:
3. Enlist parameters of the system. (2 Marks, W-2020)
4. State the system parameters. (2 Marks, S-2021) (2 Marks, W-2019) (2 Marks, S-2018)
D - SYSTEM VARIABLES:
E - TYPES OF SYSTEM:
6. List the types of system and show any two on line diagram. (2 Marks, W-2020)
7. Enlist the various types of systems. (2 Marks, S-2019)
8. State the various types of systems. (2 Marks, S-2020) (2 Marks, S-2018)
9. State types of system and explain any one. (4 Marks, W-2021)
G – SYSTEM BEHAVIOUR:
10. Briefly explain the concept of system behaviour. (3 Marks, W-2019)
A - INTRODUCTION:
C – Functions of management:
3. List various functions of Management and describe any two. (4 Marks, S-2020)
CH 3 – ORGANIZATIONAL STRUCTURE:
A - Introduction:
E – Types of Organization:
3. State the type of Organizational structure. (2 Marks, S-2021) (2 Marks, W-2019)
Jiteshsir’s Om Namah Shivay
4. Explain the Functional organization with its merits and demerits. (3 Marks, W-2019)
5. Explain Line and staff organization. (4 Marks, W-2020) (3 Marks, S-2019) (3 Marks, S-2018)
G – Some Distinctions:
7. Differentiate between “line” and “line and staff” organization. (4 Marks, W-2018)
CH 4 – ORGANIZATIONAL PRINCIPLES:
A - Introduction:
A - Introduction:
D – Organizational Climate:
CH 6 – LABOUR LAW:
A - Introduction:
C – Labour Laws:
3. State any four labour laws enacted by Government of India. (2 Marks, S-2020) (2 Marks, S-
2018)
4. State the Important provisions of the Factory Act, 1948. (2 Marks, W-2019)
5. Explain the important provisions of Factory Act, 1948. (3 Marks, S-2021)
6. Explain the main features of Minimum wages act 1948. (3 Marks, S-2021) (3 Marks, S-
2020)
7. Explain Minimum Wages Act, 1948. (3 Marks, S-2019)
Jiteshsir’s Om Namah Shivay
A - Introduction:
1. Give full name of CPM and PERT. (2 Marks, S-2020)
2. Give the full name of CPM and PERT in network. (2 Marks, W-2019)
9. Explain dummy activities with reference to network diagram. (3 Marks, W-2021) (3 Marks,
W-2020) (3 Marks, W-2018)
10. Define Dummy Activity. (2 Marks, S-2020)
11. Explain Total float and Dummy activity with illustrations. (4 Marks, S-2021)
D – CPM Illustration:
12. Define Critical path. (2 Marks, S-2021) (2 Marks, S-2020)
13. Give definition of PERT and CPM. (2 Marks, W-2020)
14. Give definition of CPM & PERT. (2 Marks, W-2021) (2 Marks, W-2018)
H – Illustrations:
21. One project consist six activities from A to F, related information is given below (7 Marks,
W-2021)
24. Draw network diagram and indicate critical path on it based on following details. (7 Marks,
W-2019)
25. Draw a network diagram for the following activities. Show critical path and Calculate total
project time. (7 Marks, S-2019)
26. One project consist seven activities from P to V, related information given below,
27. Draw a network diagram for the following activities. Show critical path and calculate total
project time. (7 Marks, S-2018)
28. Draw network diagram for tabulated data. Find out and Mark Critical path and calculate
Project Duration. (7 Marks, S-2021)
A - Introduction:
B – Types of Float:
1. Explain four types of float. (3 Marks, W-2018)
2. List the types of floats of the network diagram and define any two. (2 Marks, S-2018)
C – Determination of Float:
D – Crashing of Network:
3. Explain Crashing concept in respect of CPM. (3 Marks, S-2020)
E – Illustration of Crashing:
F – Updating:
4. What do you understand by Updating of network? Why it is required? (3 Marks, S-2020)
5. How and why network updated? (network updating) (4 Marks, W-2019)
6. Explain Network updating. (2 Marks, S-2019)
A - Introduction:
1. Define material management. (2 Marks, W-2021)
2. What is material management? And list the four popular methods of material management
evaluation. (3 Marks, W-2018)
CH 10 – Purchase Function:
A - Introduction:
C - Objectives of purchasing:
1. Give “Objectives of Purchasing”. (2 Marks, W-2021) (2 Marks, W-2018)
2. State five "R's" of purchase function. (2 Marks, W-2021)(2 Marks, S-2020) (2 Marks, W-
2020) (2 Marks, W-2019) (2 Marks, W-2018) (2 Marks, S-2018)
D – Purchasing Systems:
E – Purchasing Procedure:
3. Explain the purchase procedure. (3 Marks, W-2021) (3 Marks, S-2020) (3 Marks, W-2020)
(3 Marks, S-2019) (3 Marks, S-2018)
4. Explain important steps in purchase procedure. (4 Marks, W-2019)
5. Explain the important steps in purchase procedure. (4 Marks, W-2018)
CH 11 – Store-keeping:
A - Introduction:
B – Functions of Store-keeping:
1. List functions of Store keeper. (3 Marks, W-2020) (2 Marks, W-2018)
2. State functions of storekeeper. (3 Marks, S-2021) (3 Marks, S-2019) (3 Marks, S-2018)
4. State the advantage and disadvantage of centralized storing versus decentralized storing.
(4 Marks, W-2021) (4 Marks, W-2020)
5. State the advantages of Centralized storing. (3 Marks, S-2020)
6. State advantage and disadvantage of centralized and decentralized storing. (4 Marks, W-
2018)
7. State the advantages of centralized storing. (3 Marks, S-2018)
Exercise
9. What is FIFO system? (2 Marks, S-2020) (2 Marks, S-2019)
10. What is LIFO system? (2 Marks, S-2021)
CH 12 – Inventory Control:
A - Introduction:
1. Define (1) Inventory control, (2) Lead time, (3) Buffer stock. (3 Marks, S-2020)
2. Define:- (1) Inventory Control (2) Lead time (3) Buffer stock (4) Stock out (4 Marks, S-2018)
3. Explain the terms (1) MRP, (2) Lead time, (3) Buffer stock. (3 Marks, S-2021)
14. Explain Wilson’s inventory model. (4 Marks, S-2021) (4 Marks, S-2019) (4 Marks, S-2018)
15. Write short note on "Two bin" model of inventory. (3 Marks, W-2021) (3 Marks, W-2020)
16. Explain two bin system of inventory control. (4 Marks, S-2019)
Numerical:
17. CMV manufacturing’s material has following details : (4 Marks, S-2018)
Annual requirements = 24,000 units
Ordering cost = Rs. 270 / order
Unit cost = Rs. 5 / unit
Carrying cost = 20 % of storage value
Find out the EOQ
Jiteshsir’s Om Namah Shivay
A - Introduction:
C – Application of MRP:
18. Briefly explain the application of various concepts widely used in Materials requirements
planning. (4 Marks, W-2019)
4. Write a short note on a Job type of production situation. (4 Marks, W-2021) (4 Marks, W-
2018)
5. Differentiate between Job order production and continuous Production. (4 Marks, S-2021)
E – Objectives of PPC:
7. What are the objectives or need of (PPC) Production planning and control. (4 Marks, W-
2021)
F – Functions of PPC:
8. List functions of PPC and describe any two functions. (4 Marks, S-2020)
Jiteshsir’s Om Namah Shivay
9. List the function of PPC and explain follow up or expediting in brief. (4 Marks, W-2019)
10. List the functions of PPC. (2 Marks, S-2021) (2 Marks, S-2019)
11. List the functions of PPC and explain the follow up and expediting. (2 Marks, S-2018) (2
Marks, W-2018)
12. Explain the following terms with reference to PPC. (4 Marks, S-2019)
(a) Routing (b) Dispatching.
13. Explain the importance of routine in PPC (2 Marks, W-2018)
14. Explain following terms with reference to PPC. a) Routing b) Scheduling (4 Marks, W-2018)
15. Explain the following terms with reference to PPC. (a) Routing (b) Dispatching. (4 Marks, S-
2018)
G – Importance of PPC:
CH 15 – Scheduling:
A – Introduction to Scheduling:
1. Explain the importance of scheduling in PPC (production planning and control). (4 Marks,
W-2021) (4 Marks, W-2020)
2. Explain the importance of scheduling in PPC. (4 Marks, W-2018)
3. Explain the importance of scheduling. (4 Marks, S-2021) (3 Marks, S-2018)
7. Draw symbols used in Gantt chart and describe any three (3) with respect to the function.
(3 Marks, W-2021)
8. State difference between Gantt chart and Network diagram. (3 Marks, W-2021)
C – Scheduling Techniques:
Jiteshsir’s Om Namah Shivay
9. Explain critical ratio scheduling in brief. (4 Marks, S-2021) (3 Marks, W-2020) (3 Marks, S-
2019) (3 Marks, S-2018)
10. Explain Critical Ratio Scheduling for different criteria. (4 Marks, S-2020)
11. Explain the significance of critical ratio of production scheduling if CR<1, CR>1. (2 Marks, S-
2019) (2 Marks, S-2018)
A – Introduction:
D – Meaning of Bottleneck:
1. Define Bottleneck and explain the methods to reduce them. (4 Marks, W-2019)
E – Effects of Bottleneck:
2. Define bottleneck and state the effects of bottleneck. (4 Marks, S-2021) (4 Marks, S-2020)
(3 Marks, S-2018)
3. Explain meaning and effects of Bottleneck. (4 Marks, S-2019)
A – Introduction:
12. Explain the terms used in DARSIRI method. (2 Marks, W-2021) (2 Marks, W-2020) (2
Marks, S-2018)
A – Introduction:
D – Types of Waste:
D – Applications of ERP:
5. What is application of ERP (Enterprise Resource Planning)? (2 Marks, W-2021)
E – M S Project Software:
F – Features of M S Project:
6. List any two features of MS Project (2 Marks, S-2020)
Jiteshsir’s Om Namah Shivay
H – Need of Logistics:
Extra:
1. Differentiate between Product layout and Process layout. (4 Marks, W-2020) (3 Marks, W-
2018)
2. Define Kaizen and Re engineering. (2 Marks, S-2021)