Professional Documents
Culture Documents
Unlock the Liquid Loaded Gas Wells with ESP Technology: The Successful
ESP Dewatering Application in China Sichuan Gas Field
Y. Peng, PetroChina Southwest Oil & Gas Field Co.; T. Liao, Baker Hughes Inc; Y. Kang, Amerlink Energy
Development Services Ltd.; Q. Zhu and C. Li, PetroChina Southwest Oil & Gas Field Co.
This paper was prepared for presentation at the International Petroleum Technology Conference held in Bangkok, Thailand, 14-16 November 2016.
This paper was selected for presentation by an IPTC Programme Committee following review of information contained in an abstract submitted by the author(s).
Contents of the paper, as presented, have not been reviewed by the International Petroleum Technology Conference and are subject to correction by the author(s). The
material, as presented, does not necessarily reflect any position of the International Petroleum Technology Conference, its officers, or members. Papers presented at
IPTC are subject to publication review by Sponsor Society Committees of IPTC. Electronic reproduction, distribution, or storage of any part of this paper for commercial
purposes without the written consent of the International Petroleum Technology Conference is prohibited. Permission to reproduce in print is restricted to an abstract of
not more than 300 words; illustrations may not be copied. The abstract must contain conspicuous acknowledgment of where and by whom the paper was presented.
Write Librarian, IPTC, P.O. Box 833836, Richardson, TX 75083-3836, U.S.A., fax +1-972-952-9435.
Abstract
The operator in China Sichuan gas field is often faced with challenges of efficiently removing water
from aged gas production wells in which reservoir pressure depletes and liquid loading problem ensues.
Applying the proper dewatering method is essential to keep the well flowing and avoid water accumulating
in bottom hole. Among the many proven dewatering artificial lift methods, ESP (Electric Submersible
Pump) technology has its advantage in wells which need a high volume of water produced with maximum
pressure drawdown, which are beyond the capability of other artificial lift methods.
First introduced in year of 1984, the operator and ESP provider have made considerable progress
to develop an ESP application method in the field through theoretical studies, field trials and regular
production.
This paper concentrates on discussing the ESP sizing and optimization practice to tackle the corrosive,
extremely gassy, fluctuating liquid inflow environment typically seen in gas wells - an area used to be
perceived as infeasible for ESP technology. The methodology of well selection, completion string design
and production management could be used for reference where there are similar challenges with Sichuan
gas field.
Introduction
Sichuan gas field is among the earliest area in China where the exploration and production of natural gas
began. The gas reservoir in the entire area are mostly water-bearing, thus the production of gas is often
accompanied with formation water. The operator is often faced with challenges of efficiently removing
water from aged gas production wells in which reservoir pressure depletes and liquid loading problem
ensues. The liquid loading problem will deteriorate and eventually choke the well if effective measures are
not taken in time.
Started from the 1970s, the operator of Sichuan gas field has been practicing different gas well
dewatering technologies, to ensure gas production in the mature gas fields. ESP (Electric Submersible
Pump) technology is selected due to its capability of producing high volume of water and maximum
2 IPTC-18801-MS
head. To deal with the corrosive, extremely gassy, fluctuating inflow environment in gas wells - an area
used to be perceived as infeasible for ESP technology, special consideration must be made to ensure the
successful application. Improvements were made in production string design, gas avoiding and separation
technology, multiphase fluid handling, selection of different rated pump, surface control system algorithms
and production management.
With properly designed equipment, the ESP system has proved reliable in various applications in the field,
ranging from gas-water production wells, gas reservoir dewatering wells to revival of aged gas wells. The
ESP technology has been successfully applied in wells requiring high volume of water with high pressure
drawdown, which are beyond the capability of other artificial lift methods.
First introduced in the year of 1984, a total number of 19 wells have successfully deployed ESP
dewatering technology, assisting producing 182,000 m3/y of water and unlocking 28,000,000 m3/y of natural
gas in Sichuan gas field.
Main challenges
In the early time of applying ESP dewatering technology in Sichuan gas field, the reliability and performance
were challenged by various factors, which resulted in short system run life and poor performance. The
challenges include reservoir complexity, well depth, high temperature, corrosive environment and scale
problems.
Gas interference
The ESP is comprised of multiple stages of centrifugal pumps, which imparts velocity to fluid to produce
energy to lift the fluid to surface. Due to the difference of density between liquid and gas, the total energy
imparted to gas is much less than to liquid. Consequently when gas is present in the fluid, the lifting head
and efficiency of pump will be impaired. When the amount of gas reaches to a certain extent, the pump
cannot generate enough pressure to lift the fluid to surface, production ceases causing the "gas locking"
phenomena. This could lead to substantial temperature increases in the pump, seal, cable and motor. Taking
G12 well in Sichuan gas field as an example, gas interference has become a problem since the ESP was put
into production. In the later stage the ESP had to stop 2 to 4 times per day due to gas locking, causing very
low operating time, and so the dewatering was unsuccessful.
Fluctuating inflow
Because of the geological complexity and fractural reservoir type of Sichuan gas field, the water production
rate is difficult to estimate. Moreover, in the different production stages, the water production rate can
fluctuate drastically. An example is well S9, in the early production stage, the water production is 90m3/d,
and gas 5.15×104m3/d. During the later stage water production rate increased to 150m3/d and gas production
declined to 3×104 m3/d, causing the problem of selecting a flow for the ESP.
System reliablity
The ESP performance record of Sichuan gas field reveals that cable and motor lead extension related failures
account for the largest portion of ESP failures. The "decompression" effect is the one which contributes most
to the failures. Lab test and field experience have shown gas could migrate into cable insulation layers easily
under the downhole high pressure environment. When the environment pressure declined drastically, the
gas trapped in the cable insulation layers will expand and eventually the cable integrity will fail and short the
downhole cable, due to the so called "decompression". In the gas wells where the pressure changes rapidly
this phenomenon has often been seen. The other factor is mechanical damage during the installation and
pulling process. The loose banding and tight clearance can cause cable drag on wellbore and compromise
IPTC-18801-MS 3
electric integrity. Reusing the cable must be done with cautioun. Besides, the ESP is often set deep where
the temperature can be very high. The insulation material selection, field splice quality is critical.
Well selection
ESP dewatering technology has its advantages and disadvantages. Not all liquid loaded gas wells are suitable
for ESP. Since it is one of the most complex gas well dewatering technologies, involving high investment
and massive application work, the selection of candidate wells for ESP dewatering technology is critical.
Improper selection of the candidate wells can lead to ineffectiveness of the dewatering result, or poor
ESP performance. Based on the Sichuan gas field experience, the designs which account for the only the
initial period of production stage will often find that the ESP is not compatible with gas, water, and power
consumption needs in the late stage. Furthermore, the selection of dewatering well should consider the need
of the whole gas reservoir, so that to fully make use of the ESP dewatering capability.
Engineering improvements
Based on the theoretical studies and experience in the field, considerable improvements have been made to
optimize ESP dewatering technology performance.
force on the fluid with higher density fluid to the periphery while the lower density gas towards the shaft.
The crossover on the discharge of gas separator directs the gas to the annulus while the liquid enters the
centrifugal pump. With new technologies in recent years, the separation efficiency and work range have
increased significantly. The properly designed gas separator could separate as much as 90% of gas at intake
conditions. The separation could be enhanced by deploying a tandem gas separator in extremely gassy
environments.
When the free gas entering pump is still a problem after use of gas avoidance techniques, increasing pump
gas handling ability becomes critical. The theoretical studies and field experience suggest tapered pump is
a key to handling the gas in the fluid and ensure stable production. A tapered pump uses two or three stage
types to achieve a volumetric taper within the pump. The designed lower pumps are of higher volume range
and can generally handle higher gas content. The total fluid volume decreases as it progresses from the
lower pump to upper pump as a result of free gas being compressed and some free gas going into solution.
The tapered design can keep the different stage types pumps operating within its recommended operating
range and maintain efficiency. From field experience, the use of mix flow stages or special multi-phase gas
handling stages gas handling pumps as lower pumps can effectively enhance the ESP gas handling ability
and lower the gas interference.
Cable improvement
Cable related failures account for the largest portion of all ESP failures. Improvements have been made:
a. The cable insulation material temperature rating should be always higher than the maximum estimated
temperature during operation. When temperature is high or dynamic situation is expected, select a
higher level of temperature rating cable;
b. Improved motor lead connectors and cable splicing;
c. Lead sheath is always required in gas wells, to avoid gas migrating into cable insulations;
d. Use stainless steel armor cable to account for the gas cavitation and corrosion.
and the well is back to natural flow, the automatic diverting valve (ADV) is installed above the pump, thus
allowing the natural flow to take place when the ESP is shut down.
The motor selected is 450 series motor, nameplate of 100HP. The software assisted simulation has shown
the maximum motor temperature is 93°C, which is well in the range of the selected high temp rating motor.
The main cable is AWG#4 flat cable with lead sheath and stainless steel armor, the cable temperature rating
is 232°C. The seal section is using tandem bag and labyrinth chambers design, which can handle well of
the corrosive environment and provide good protection in the gassy application. A sensor is attached to the
bottom of motor to provide real time monitoring of motor temperature, intake temperature, intake pressure,
vibrations and current leakage, to allow for real time optimization and controlling purpose.
Production analysis
Installed in 2012, the ESP has been removing 150 ~ 200 m3/d of water, and producing 1.3 ~ 1.8 × 104 m3/
d of gas in the stable production period. The well was brought back to continuous production and achieved
superior performance in comparison to the prior artificial lift method. After the initial continuous ESP
assisted production completely cleaned the loaded liquid, in the later stage of dewatering, the operating
method was shifted to ESP dewatering assisted natural gas mode, which periodically starts the ESP to
remove the loaded liquid and shut for natural flow. The ESP has stayed online for over three years since
installation.
J26 wells.
Background
The well was originally an intermittent production well and the production wells layers are from 2600m
to 2640m. The original formation pressure was 12MPa, with downhole temperature 72 °C, the production
casing diameter is 7″ to depth of 2400 meters and 5″ from 2400 to 2600 meters, in a vertical well. Water is
present in the very early production stage. Gas lift was used as the initial dewatering method and the water
production rate is around 160 m3/d, unable to fulfill the need for water removal. The recovery factor was
only 20% and has good remaining reserves.
Artificial lift method selection
After analyzing the production and well history, efficiently removing sufficient amount of water is the
key to bring the well back to production. The gas lift method performance was constrained by the high back
pressure generated during production, causing the gas injected to not return to the surface continuously.
The removal of loaded liquid could be not effectively removed and production cannot be sustained. ESP
dewatering is considered to replace gas lift due to its ability to handle the high back pressure and produce
target volume of water.
ESP design and sizing
The target water flow rate is expected to be 400 m3/d, to maximally dewater the well, remove the loaded
liquid, lower the bottom hole flow pressure and achieve gas production. In consideration of the casing
diameter, the ESP was set in depth of 2390 meters in the 7″ casing. The design of using tandem gas separators
with tapered pumps of gas handling stages with mix flow stages is chosen. The tandem gas separator can
efficiently separate the gas to annulus and lower the free gas content in fluid entering pump. While the
tapered pump G42 gas handling with P34 mix flow design can well cover the free gas and work stably in
the production range from 200~500 m3/d. All the separator and pump sections are equipped with abrasive
resistance modules to cope with the low flow scenarios when gas interference becomes severe.
The motor selected is 450 series motor, nameplate of 336HP. The software assisted simulation has shown
the maximum motor temperature is 102°C, which is well in range of the selected high temp rating motor.
The main cable is AWG#2 flat cable with lead sheath and stainless steel armor, the cable temperature rating
is 232°C. The seal section is using tandem bag and labyrinth chambers design, which can handle well of
the corrosive environment and provide good protection in the gassy application. A sensor is attached to the
bottom of motor to provide real time monitoring of motor temperature, intake temperature, intake pressure,
vibrations and current leakage, to allow for real time optimization and controlling purpose.
IPTC-18801-MS 9
Production analysis
After the ESP was installed and put to production, in the initial dewatering stage the water production
was as high as 450 m3/d, which increased the production by 90~150% in comparison to previous artificial
lift method. After the first two months period of dewatering, the gas production revived to 10.2 × 104m3/d,
removing 210 m3/d of water. With the gas production increased water could be brought to surface without
ESP assistance, and so the well was shifted to natural flow. The natural flow was sustained for three years
until liquid problem occurred again and choked the well. A new set of ESPs was deployed again to dewater
the well, and maintain the gas production. Due to the depletion of formation pressure, the well cannot return
to natural flow and is in continuous production assisted by ESP. The ESP is still operating in good condition,
removing 100 m3/d of water and producing 3.6~4 × 104m3/d of gas. In comparison to gas lift, the higher
volume with maximum lifting head is the key to bring the well back to production.
The motor selected is 450 series motor, nameplate of 180HP. The software assisted simulation has shown
the maximum motor temperature is 99°C, which is well in range of the selected high temp rating motor.
The main cable is AWG#2 flat cable with lead sheath and stainless steel armor, the cable temperature rating
is 232°C. The seal section is using tandem bag and labyrinth chambers design, which can handle well of
the corrosive environment and provide good protection in the gassy application. A sensor is attached to the
bottom of motor to provide real time monitoring of motor temperature, intake temperature, pump intake
pressure, pump discharge pressure, vibrations and current leakage, to allow for real time optimization and
controlling purpose.
Production analysis
After Z35 ESP was installed, the initial stage water production increased to 100 m3/d, in comparison
of gas lift of 80 m3/d. The water production was then increased to 150 m3/d gradually after production
optimization. The bottom hole flowing pressure was lowered to 5MPa, comparing to 7MPa with gas lift.
The gas production rate increased to 1.5×104 m3/d from 0.3~0.5×104 m3/d.
IPTC-18801-MS 11
There are four production wells in the same gas reservoirs near Z35. After the ESP was deployed in Z35
well, the four production well performance increased consequently. The result has shown the Z35 acting as
a gas reservoir dewatering well has been successful, controlled overall water production and improved the