RFI SESSION

PLN ADVANCE METERING


INFRASTRUCTURE (AMI)
2021
14 July 2021

Page 2
Destination
RFI Session

01
Describe the background and scope of implementing the 2021 AMI

02
Describe the structure of the Request for Information (RFI) document
www.pln.co.id | 2

Page 3
Agenda
RFI Session

01 Project Background & Scope

02 Request for Information (RFI) Structure

03 Activity Schedule & Next Steps

www.pln.co.id | 3

Page 4
Agenda
RFI Session

01 Project Background & Scope

02 Request for Information (RFI) Structure

03 Activity Schedule & Next Steps


www.pln.co.id | 4

Page 5
Project Background & Scope
Project Background & Objectives

Background Job Purpose & Purpose

AMI is a Smart Grid Infrastructure in the form of an ecosystem that Providing an Advanced Metering Infrastructure ecosystem
consists of Smart meters Communication media, Data (AMI) for Pre-commercialization Trials starting from kWh
Concentrator Unit (DCU), Data exchange protocol between Meters, Data Concentrator Units, and Head End Systems that
equipment & Head End System (HES), Data Processing meter covers 110,000 meters in 3 cities before
and Data Centers (MDMS). massive implementation.

Advanced Metering-based smart meter development


Infrastructure (AMI) is carried out to address related issues
the accuracy of the electricity bill from the meter reading
Energy Transactions and address the challenges of efficiency and
electric power service innovation in Indonesia.

In addition, the application of smart meters is also defined as


PLN Directors KPI by the Ministry of SOEs (Enter in 88
Strategic Projects that are monitored directly by the Minister of SOEs).

* xxx www.pln.co.id | 5

Page 6
Project Background & Scope
PLN 2021 AMI Potential Locations

Project Scope Implementation Location

Implementing pre-commercialization stage AMI solutions that


covers the scope of work below: UID JAYA
1 1. UP3 Kramat Jati
The entire kWh meter Distribution which consists of:
1 and 3 phase
2. UP3 Marunda

• Postpaid and prepaid 3. UP3 Bintaro
• kWh meter on PLN distribution equipment (e.g. transformer) 4. UP3 Lenteng Agung
• Manual and automatic meter reading system

JATIM UID
2 3
Data Communication Media Data Concentrator Unit
1. UP3 North Surabaya
2. UP3 West Surabaya
4 5 Installation supervision and pemasangan 3. UP3 South Surabaya
Head End System
AMI activation

6 UID JABAR
Provide training to installers from PLN
1. UP3 Bandung

* xxx www.pln.co.id | 6

Page 7
Agenda
RFI Session

01 Project Background & Scope

02 Request for Information (RFI) Structure

03 Activity Schedule & Next Steps

www.pln.co.id | 7

Page 8
RFI Purpose
Here are 4 Goals of RFI
In the framework of the 2021 PLN AMI procurement plan, the following are the objectives of holding an RFI to Candidates
Provider
Capabilities Validation & Supply Capacity of Prospective Providers
Validation of the capability and capacity of potential providers related to AMI solutions: meter-2-way (1 phase/3 phase, GSM/ RF/ PLC, Pre-
pay/ Postpaid), DCU (PLC, RF), and HES

Validation of Product Specifications against Testing Eyes


PLN has several test points (insulation, accuracy, electrical, etc.). Prospective providers are welcome to provide
responses in this area.

Request for Input Regarding AMI Implementation


Prospective providers are welcome to provide input related to leading practice activities that need to be carried out to
implementation

Inquiry for Meter, DCU, & HES Price Information


To collect the latest material and service price information.

www.pln.co.id | 8

Page 9
Agenda
RFI Session

01 Project Background & Scope

02 Request for Information (RFI) Structure

03 Activity Schedule & Next Steps

www.pln.co.id | 9

Page 10
The next step
Filling out RFI Documents
PT PLN (Persero) asks suppliers to fill out the RFI documents that have been given and sent at the agreed time
determined

No Subject Activity Responsible Start Date Date of completion Status

Monday, 19 July 2021


1 RFI Data Charging Filling and Updating RFI Data Prospective Provider Wednesday, July 14, 2021 Open
16.00 WIB

RFI Clarification with Supplier Wednesday, July 21, 2021


2 RFI Clarification PLN Wednesday, July 21, 2021 Open
(if needed) 08.00 – 17.00 WIB

www.pln.co.id | 10

Page 11
The next step
Interview Schedule (Tentative)

No Prospective Provider Schedule

1 PT CITRA SANXING INDONESIA Wednesday, 21 July 2021 (08.00 – 09.00)

2 PT SMART METER INDONESIA Wednesday, 21 July 2021 (09.00 – 10.00)

3 PT EDMI INDONESIA Wednesday, 21 July 2021 (10.00 – 11.00)

4 PT MECOINDO Wednesday, 21 July 2021 (11.00 – 12.00)

5 PT HEXING TECHNOLOGY Wednesday, 21 July 2021 (12.00 – 13.00)

6 PT MAHAKAAM JAYA SEJAHTERA Wednesday, 21 July 2021 (13.00 – 14.00)

7 PT ELECTRA INTI PERKASA Wednesday, 21 July 2021 (14.00 – 15.00)

8 PT AVAIRRA INDO KARYA Wednesday, 21 July 2021 (15.00 – 16.00)

9 PT INTERAKTIF MEDIA Wednesday, 21 July 2021 (16.00 – 17.00)