Professional Documents
Culture Documents
1.4 Rope Access Job Method Statement
1.4 Rope Access Job Method Statement
Type of
Location BORF Flare tower
Structure
Type of Job Inspections & standby rescue Height 50 meter
Prepared by:
Noor Hazman Jackie Date 1 to 10 September 2020
L3 Supervisor
Access Method
Identify routes / Check routes for hazards / Identify climbing system / List necessary equipment
Rigging
Identify and assess anchor points / Detail anchor system / Check for hazards in path of ropes
- Using monkey ladder for access anchor point area (attach pulley on structure)
- For control potential fall during climb monkey ladder, always have minimum 1 point attachment during fall arrest
position and minimum 2 point of attachment when suspended.
- Using 2 Stop / I’D for attached on each anchor ( prepare Rig-for Rescue System – Tension line)
- Avoid from tangle and abrasion of rope ( manage rope properly )
- Avoid rope to attach with sharp or hot surface ( Using rope protection or avoid with deviation)
- Use Y-hang on anchor point when set-up tension line.
- Use ID and back-up with ASAP for lowering system.
TEC-750-009-QR-02
REV: 1
JOB METHOD STATEMENT
Co. No. 636290-H
Rescue Plan
Identify rescue method / Is sufficient dedicated rescue kit available at site / Make all team members aware their role
Tension line /
Tramway
Safety line
TEC-750-009-QR-02
REV: 1
JOB METHOD STATEMENT
Co. No. 636290-H
On ground - Anchor
point & Standby person
TEC-750-009-QR-02
REV: 1
JOB METHOD STATEMENT
Co. No. 636290-H
1. Apply PTW (Hot Work Permit) and get approval for Client
2. Toolbox meeting to discuss safety issue on work area and latest issue from IRATA (Safety Bulletin) & Client.
3. Discuss hazards from Risk Assessment Form.
4. Toolbox conducted by rope access level 3 / Supervisor
5. Ensure all team member understand and sign off the toolbox meeting form.
6. Preparation of work site – Install barricade tape with signage for setup Exclusion Zone
7. Preparation equipment – Pre use / inspects all equipment before used (guide by Level 3)
8. Setup anchor point (Rigging for rescue) and pre-test the system.
9. Briefing team member about technique and hazards when perform task.
10. All emergency equipment on place monitor by Level 3 (1st Aid box & standby Radio to communicate with Radio
Operator / CCR)
11. Level 1 perform NDT Inspection and constant monitor by level 3
12. Level 3 standby and monitor all other team working on tower.
13. After Tea brake / Lunch, Level 3 re-inspect all anchor point and equipment to ensure all on safe to use.
14. Housekeeping – Count all equipment (refer equipment checklist) and proper manage all gear and level 3 double
check around work area to avoid leave any equipment.
15. Remove barricade and signage from exclusive zone.
16. Closed PTW
1. All technician working on Flare Tower must valid WAH or IRATA certificate.
2. All technician declare of fitness condition to rope access level 3 and report to standby person.
3. Before climbing the tower all personal must report to standby person to fill up form Time In Time Out.
4. Rope access level 3 must do buddy check to all personnel to ensure all wear PPE correctly.
5. Rope access level 3 must monitor all personnel climb the tower and ensure back-up device always maintain Fall
Factor 0.
6. For safety, all personnel working on tower not allowed standing near to the hand rill.
7. During emergency or bad weather, all personnel working on tower must stop all activity, secure all equipment
and follow instruction form rope access level 3. Level 3 must monitor the safety of everyone during down the
ladder. Level 3 is the last person descend to the ground.
TEC-750-009-QR-02
REV: 1
JOB METHOD STATEMENT
Co. No. 636290-H
4. Emergency equipment
• 1st Aid = 1 box
• Walkie Talkie = 2
5. Camera = 1
Team Communication
Direct Audio-visual / Hand-signals / Radio / Is your system adequate?
- Communicate with Radio (Walkie Talkie), loud voice and hand signal
Other Considerations
TEC-750-009-QR-02
REV: 1
JOB METHOD STATEMENT
Co. No. 636290-H
Team Member
Name Signature
IRATA No.
This This form has to be filled by IRATA Level 3 as prove to show that Method Statement has been read and acknowledge.
TEC-750-009-QR-02
REV: 1