Ledgers are the main horizontal tubes and provide lateral support to the
structure
They must be level and fixed to the inside of standards with right-angle, load
bearing couplers
Ledgers should be joint with sleeve couplers and should be as close to the
node points (the point at which the ledger is fixed to the standard) as possible
Scaffold Terminology
Scaffold Lifts
Scaffold Measurements
WORKING PLATFORM ACCESS- QUY ĐỊNH SÀN THAO
UNOBSTRUCTED ACCESS- CHIỀU RỘNG TỐI THIỂU SÀN
TÁC
• Sàn thao tác có vật tư - For transporting materials:-
Minimum 675mm , or (3 x boards wide)
•Sàn thao tác chỉ có công nhân và dụng cụ cầm tay nhẹ
- For persons with Handtools only:
- Minimum 450mm or (2 x boards wide)
* Ván sàn gỗ có chiều rộng Min 225 mm, còn lại 250mm; 275mm; 300mm;
320mm
Working Platform
Working Platform
MAXIMUM SPAN FOR TIMBER SCAFFOLD BOARDS
BS, EN, OSHA, AS PER 1577
NOTE:- ALL BOARDS MUST BE FULLY LASHED – VÁN SÀN PHẢI ĐƯỢC KẸP CHẶT
ACCESS AND EGRESS
Access:
Access to a working platform is usually by a
ladder
Guardrails must be provided where persons can fall 2m or more, at least 910mm
above the platform and fixed inside the standards
Toeboards must accompany guardrails and fixed inside the standard with proper clips
Working Platform
The minimum requirement for a working platform is for a width of 600 mm,
irrespective of whether it is a trestle scaffold or a scaffold surrounding a multi-store
building
TIES (CONT’D)- MỞ RỘNG CHÂN ĐẾ GIÀN
TIES AND HANDRAILS ACCESS
HAND RAILS & TOE BOARDS:- TOP RAIL: MIN 900mm
MAX 1100mm
NOTE:- 1. Double H/R and Toe Board required over 2.0m in height.
2. Hand/R Post max of 3.0m spacing on slabs etc.
TIES:-
MAX. SPACING NORMAL MAX. SPACING USING PLAN BRACES
NO MORE
HORIZONTAL MAX. OF 6 x BAYS
THAN 3 x BAYS
NOTE:- ALL TIES MUST BE FIXED TO STANDARDS, IF POSSIBLE WITH 90o COUPLERS
(PICK UP BOTH STANDARDS). IF COMING OFF LEDGERS MAX. DISTANCE FROM
STANDARDS = 300mm
TUBE AND FITTING REQUIREMENTS- VERTICAL TIES
QUY ĐỊNH LIÊN KẾT GIẰNG THEO CHIỀU CAO
END BRACE
Min. requirement:- on each end of Scaffold DENOTES: On the job extra brace
DENOTES: Min. brace requirement
FRONT BRACE DENOTES: Face brace if tube and fittings
Min. requirement:- every 4th bay,(3 clear bays) are used
NOTE: existing face brace 4 clear bays is not correct
BRACING (Cont’d)
Braced Braced
3 x Clear Bays
3 x Clear Bays
AUSTRALIAN STANDARDS:-
• JOINS SHOULD NOT BE MORE THAN 300mm FROM THE NODE POINT, EITHER VERTICAL OR
HORIZONTAL (LEDGERS AND STANDARDS).
• NO JOINS IN END BAYS (LEDGERS ONLY).
• DO NOT HAVE 2 JOINS OPPOSITE EACH OTHER BOTH ON LEDGERS AND STANDARDS.
STAGGERING THE JOINTS - - CÁC MỐI NỐI TRONG 1 KHOANG PHẢI BỐ TRÍ SO LE NHAU
TUBE AND FITTING REQUIREMENTS
WORKING PLATFORMS:-
2.4m
2.0m
MAX. 2 X BOARDS
* WIDE WITHOUT
2.0m
SPUR
* 3.0m WITH
DOUBLE
2.0m
STANDARDS
FORKHEAD
• ONE OF MANY TUBE AND FITTING METHODS:
NEEDLE
SCREW JACKS
MAY USE ACROW PROPS?
SPUR TUBE
SUPPORT SCAFFOLD
CHECK
FITTINGS
* DO NOT USE DRILL – IN ANCHORS
**
NEEDLE FIX POINT
GIÀN CÔNG SÔN TRÊN
Chân DẦM CHỐNG TRẦN
Đế
CANTILEVERED BEAM
Tăng Liên kết
Adjustable Giằng SCAFFOLD- FRAME METHODS
Base tường Outbooard Max a- Inboard Min.3a
Tie to
the wall
Chân đế U
U-Adjustable Dầm chữ I
baseplate Chân đế U - BasePlate
Xuyên tường
CHECK FITTING
NEEDLE PHẢI DÙNG CÙM
SPUR 90
CÔNG-SÔN SPUR TUBE
CHỐNG XIÊN
1000mm
LADDER BEAM (NEEDLE)
Chỉ thang chịu lực công sôn 1m
W.L.L.=80Kg*8=640kg
Timber Packing
Cantilever Drop Scaffold
Cantilever Drop Scaffold
SPUR SCAFFOLDING CONTINUED
SPUR SCAFFOLDING CONTINUED
FORCED DIAGRAMS :-
1.0M LOAD (E.g.. 800
Kg)
VERTICAL
DISTANCE
1.6M
(PUNCHEON)
FIXING POINT
TOE BOARD
TOE BOARD
TIES TIES
BRIDLE TUBE
BOARDS
SCAFFOLD BOARDS
LEDGER
ACCESS WAY
SPUR
Góc 60 độ vật rợi dưới 1kg
Chỉ cần ống giáo
1.0M
90
7 7
8.0M
1 MAX ALLOWABLE ANGLE OF A WORKING PLATFORM
= 1 : 8 RATIO.
3.0M
BARROW RAMPS:-
PUBLIC A SAFETY
THE MAIN CONTRACTOR ; MUST ERECT EITHER OF THE FOLLOWING, ADJACENT TO
ANY PUBLIC PLACE BEFORE COMMENCEMENT OF CONSTRUCTION WORK:-
1. TO EXCLUDE PERSONS FROM ENTERING THE SITE ERECT A BARRICADE OR
HOARDING.
2. IF THE HEIGHT OF ANY PART OF THE BUILDING STRUCTURE OR PROPOSED
STRUCTURE EXCEEDS A HEIGHT WHICH IS 2 x TIMES THE HORIZONTAL DISTANCE
BETWEEN THE BUILDING OR STRUCTURE & THE BOUNDARY OF ANY PUBLIC PLACE
ADJACENT TO THE SITE – ERECT A GANTRY.
GANTRY’S (Continued)
A. HEAVY DUTY:-
• MAX. LOAD 730 KG. PER M2.
• FOR STORING MATERIALS AND WHERE LOADS ARE BEING LIFTED OVER THE GANTRY.
B. MEDIUM DUTY :-
• MAX . LOAD 360 KG. PER M2 .
FOR PLACING SITE OFFICE ETC. AND DEMOLITION WORK.
C. LIGHT DUTY:-
* MAXIMUM LOAD 100KG. PER M2.
* FOR PUBLIC PROTECTION DURING ALTERATIONS OR PAINTING OR SIMILAR WORK.
NOTE:-
* GANTRY MUST EXTEND AT LEAST 2.0M PAST EACH END OF SITE.
* WORKING PLATFORMS MUST SHED WATER TO ONE END MAX. SLOPE 1:40.
* PLATFORM BOARDS MUST BE CLOSELY LAID AND BE DUST PROOFED WITH A WATERPROOF COVER OF METAL OR
MATERIAL (APPROVED).
* SIDES FULLY BOARDED TO MINIMUM OF 900MM. OR BRICK GUARDS WITH DUST PROOFING.
HOARDING OR
BARRICADE
NIGHT LIGHTS
BOTH ENDS
SPURS
DOUBLE STANDARDS
MUST BE PAINTED
WHITE UP TO A
HEIGHT OF 2.050mm
2.1M (MIN)
MIN 300mm
ALL FITTINGS TO BE TO OUTSIDE
WRAPPED ON HAND EDGE OF
RAILS, BRACES & FOOTPATH
FOOT TIES
DOUBLE STANDARDS
FOOT TIE FOOTPATH
SOLE BOARDS
HEAVY DUTY:- 2 x BOARDS THICK
MEDIUM DUTY:- 1 BOARD THICK
LIGHT DUTY:- 1 BOARD THICK
CIRCULAR SCAFFOLDING
12.2M INNER DIAMETER OR SCAFFOLDING
TUBE FITTING SCAFFOLDING ONLY:
• A SCAFFOLD IS TO BE ERECTED AROUND
THE OUTSIDE OF A CIRCULAR TANK WITH A
DIAMETER OF 12.OM.
• HEAVY DUTY SCAFFOLD WITH A WIDTH OF
900MM (4 x BOARDS)
• CALCULATE THE NUMBER OF STANDARDS
REQUIRED WITH A 100MM CLEARANCE FROM
THE TANK.
12M DIAMETER TANK
NOTE:- YOU ALWAYS HAVE TO FIND
THE NUMBER OF BAYS
14M OUTER DIAMETER OF SCAFFOLDING TO FIND No OF BAYS REQUIRED HEAVY DUTY (1.8M)
:- 44M 1.8M = 25 BAYS u 44M 25 = 1.76M
* *
METHOD “A”
PHƯƠNG ÁN A
GIA CƯỜNG BẰNG CHÉO NÉN
IN TMETHOD “B” * *
SPURS IN COMPRESSION **
STANDARDS
PHƯƠNG ÁN B DOUBLE TO FULL
HEIGHT OF
GIA CƯỜNG BẰNG CHÉO KÉO OPENING