EXCAVATION AND EARTH WORK

Sr.no description unit length width height Area m2

1 site clearance m2 4808

2 top soil removal 150 mm thk. m2 4808

3 excavation m3 8.9 4808

add elevator pit 1.2 64.26

sum pit 1 1.4 24.01

sumpit2 1.4 24.01

4 disposal (excavation qty +top soil m3

5 Anti-termite (ver.area +hor.area m2 298.7 9.05 4808

add elevator pit 34.6 1.2

sum pit 1 19.6 1.4

sumpit2 19.6 1.4

6 backfilling m3 9.05 29.83

BLINDING CONCRETE

description unit height Area QTY


length M width M M M2
blinding concrete m2 4808
dedt
elev.pit 57.5
sum.pit-1 20.25
sum.pit-2 20.25
SUB-TOTAL 4710

ADD
elev.pit 64.26
sum.pit-1 24.01
sum.pit-2 24.01

TOTAL 4822.28

SCREED CONCRETE

description unit height Area QTY


length M width M M M2
SCREED concrete m2 4778.13
RAFT EDGE 298 0.05
ADD ELEVATOR PIT 33 0.05
SUM PIT 1 18 0.05
SUM PIT 2 18 0.05

TOTAL 4778.13

RAFT CONCRETE
height Area QTY
description unit length M width M
M M2
RAFT M3 298 1.2 4778.13
dedt
elev.pit 1.2 17
sum.pit-1 1.4 2.25
sum.pit-2 1.4 2.25
SUB-TOTAL

ADD
elev.pit 1.2 57.5
sum.pit-1 1.4 20.25
sum.pit-2 1.4 20.25

TOTAL

BASEMENT 2 COLUMN
Con.Qty
COLUMN TYPE length width height No's M3
c1 2.1 0.6 3.7 2 9.324
c2 1 1 3.7 2 7.4
c3 1.5 0.7 3.7 5 19.425
c5 3.7 6 0
c6 3.7 9 0
c7 3.7 8 0
c8 3.7 4 0
c9 3.7 2 0
c10 3.7 35 0
c12 3.7 0
c13 3.7 0
3.7 0
total 26.825

BASEMENT 1 COLUMN
Con.Qty
COLUMN TYPE length width height No's
M3
0.00 LVL
C17 0.8 0.2 3.25 4 2.08
C18 0.6 0.2 3.25 16 6.24
C19 0.4 0.4 3.25 1 0.52
C20 0.5 0.3 3.25 4 1.95
C21 0.8 0.5 3.25 15 19.5
1.25 LVL
c1 2.1 0.6 4.55 2 11.466
c2 4.55 2 0
c3 4.55 5 0
c5 4.55 6 0
c6 4.55 9 0
c7 4.55 8 0
c8 4.55 4 0
c9 4.55 2 0
c10 4.55 35 0
c12 4.55 0
c13 4.55 0
4.55 0
total 41.756
GROUND FLOOR COLUMN
COLUMN TYPE length width height No's Con.Qty
M3
c1 2 0.5 3.85 2 7.7
c2 1 0.9 3.85 2 6.93
c3 1.5 0.6 3.85 5 17.325
c5 3.85 6 0
c6 3.85 9 0
c7 3.85 8 0
c8 3.85 4 0
c9 3.85 2 0
c10 3.85 35 0
c12 3.85 0
c13 3.85 0
3.85 0
total 24.255

MEZZANINE FLOOR COLUMN


Con.Qty
COLUMN TYPE length width height No's
M3
c1 2 0.5 3.85 2 7.7
c2 1 0.9 3.85 2 6.93
c3 1.5 0.6 3.85 5 17.325
c5 3.85 6 0
c6 3.85 9 0
c7 3.85 8 0
c8 3.85 4 0
c9 3.85 2 0
c10 3.85 35 0
c12 3.85 0
c13 3.85 0
3.85 0
total 24.255
1ST FLOOR COLUMN
Con.Qty
COLUMN TYPE length width height No's M3
c1 1.8 0.45 3.85 2 6.237
c2 1 0.8 3.85 2 6.16
c3 1.5 0.5 3.85 5 14.4375
c5 3.85 6 0
c6 3.85 9 0
c7 3.85 8 0
c8 3.85 4 0
c9 3.85 2 0
c10 3.85 35 0
c12 3.85 0
c13 3.85 0
3.85 0
total 20.5975

2ND FLOOR COLUMN


COLUMN TYPE length width height No's Con.Qty
M3
c1 1.8 0.45 3.85 1 3.1185
c2 1 0.8 3.85 2 6.16
c3 1.5 0.5 3.85 5 14.4375
c5 3.85 6 0
c6 3.85 9 0
c7 3.85 8 0
c8 3.85 4 0
c9 3.85 2 0
c10 3.85 35 0
c12 3.85 0
c13 3.85 0
3.85 0
total 20.5975

basement 2 ceiling slab (BASEMENT 2 BEAM)


BEAM TYPE length width height Con.Qty Formwork
M3 m2
B1(200X600) 5.175 0.2 0.25 0.25875 3.6225
B1(200X500)
B2 4.58 0.2 0.25 0.229 3.206
B3 2.75 0.2 0.4 0.22 2.75
c5 0 0
c6 0 0
c7 0 0
c8 0 0
c9 0 0
c10 0 0
c12 0 0
c13 0 0
0 0
total 0.449 5.956

BASEMENT 1 BEAM
BEAM TYPE length width height Con.Qty Formwork
M3 m2
B1 0 0
B2 with ramp 9 0.2 0.4 0.72 9
B2 with slab 5.16 0.2 0.2 0.2064 3.096
b30 dropping 7.6 0.35 0.15 0.399 4.94
b30 inv 7.6 0.35 0.3 0.798 4.56
b29 inv 7.6 0.2 1 1.52 15.2
b8 3 0.35 1.1 1.155 7.65
b18 dropping 3.55 0.35 0.15 0.186375 2.3075
b18 inv 3.55 0.35 0.3 0.37275 2.13
b16 inv 3.55 0.2 1 0.71 7.1
c12 0 0
c13 0 0
0 0
total 6.067525 55.9835

BASEMENT 1 BEAM
Con.Qty Formwork
BEAM TYPE length width height
M3 m2
B1 0 0
B2 with ramp 9 0.2 0.4 0.72 9
B2 with slab 5.16 0.2 0.2 0.2064 3.096
b30 dropping 7.6 0.35 0.15 0.399 4.94
b30 inv 7.6 0.35 0.3 0.798 4.56
b29 inv 7.6 0.2 1 1.52 15.2
b8 3 0.35 1.1 1.155 7.65
b18 dropping 3.55 0.35 0.15 0.186375 2.3075
b18 inv 3.55 0.35 0.3 0.37275 2.13
b16 inv 3.55 0.2 1 0.71 7.1
c12 0 0
c13 0 0
0 0
total 6.067525 55.9835

ground BEAM
Con.Qty Formwork
BEAM TYPE length width height
M3 m2
b5 2.55 0.4 0.85 0.867 5.355
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
total 0 0

BASEMENT 2 CEILING SLAB


SOFFIT VERTICAL
slab TYPE AREA THK. CON.QTY M3
AREA AREA
350MM 4558 0.35 1595.3 4558 137.1055

TOTAL 1595.3

BASEMENT 1 CEILING SLAB


SOFFIT PERIMETER
slab TYPE AREA THK. CON.QTY M3
AREA M
400mm 0.00 lvl 1013.43 0.4 405.372 1013.43 197.89
350mm 0.00 lvl 114.13 0.35 39.9455 114.13 77.72
200mm 0.00lvl 206.91 0.2 41.382 206.91 113
350mm 0.85/0.65 lvl 233.25 0.35 81.6375 233.25 112
350mm 1.25 lvl 2723.8 0.35 953.33 2723.8 224
EXTRA FORMWORK 0.4 171.05
OUTSIDE 0.35 83.97

TOTAL 1521.667

SUBSTATION SLAB

SOFFIT PERIMETER
SLAB TYPE AREA THK. CON.QTY M3
AREA M
150MM 76.3 0.15 11.445 76.3
180MM 36.44 0.18 6.5592 36.44
0 0

TOTAL 18.0042

SUBSTATION WALL
Con.Qty Formwork
WALL TYPE length width height
M3 m2
350MM 10.92 0.35 1.4 5.3508 28.938
425MM 12.88 0.425 1.4 7.6636 34.132
352MM 10 0.352 1.4 4.928 26.5
200MM 2.9 0.2 1.4 0.812 7.685
200MM 123.92 0.2 1.25 30.98 328.388
200MM 8.2 0.2 0.65 1.066 12.71
0 0
0 0
total 50.8004 438.353
BASEMENT 2 SHEAR WALL CORE WALL
Con.Qty
WALL TYPE length width height No's
M3
W1 8.9 0.5 3.7 2 32.93
W2 7.45 0.3 3.7 2 16.539
W2 7.5 0.3 3.7 1 8.325
W2 9.8 0.3 3.7 1 10.878
3.7 0
3.7 0
3.7 0
3.7 0
3.7 0
3.7 0
3.7 0
3.7 0
total 35.742

COLUMN dowel bar


DIA
COLUMN TYPE 50*Dia(M) LENGTH T.LENGTH NO OF BAR
MM
C1 1.6 1.11 4.31 32 40
C2 1.6 1.11 4.31 32 40
C3 1.6 1.11 4.31 32 28
C4 1 1.11 3.11 20 16
C4* 1 1.11 3.11 20 16
C5 1 1.11 3.11 20 16
C6 1 1.11 3.11 20 16
C7 1 1.11 3.11 20 14
C8 1 1.11 3.11 20 16
C9 1 1.11 3.11 20 16
C10 1 1.11 3.11 20 16
C10* 1 1.11 3.11 20 16
C11 1 1.11 3.11 20 16
C12 1 1.11 3.11 20 14
C13 0.8 1.11 2.71 16 12
C14 1 1.11 3.11 20 12
C15 0.8 1.11 2.71 16 12
C16 1 1.11 3.11 20 16
C23 1 1.11 3.11 20 10
C24* 1 1.11 3.11 20 20
PC. C3* 1 1.11 3.11 20 12
post 0.8 1.11 2.71 16 4
Total

COLUMN MAIN BAR BS2


DIA
COLUMN TYPE 50*Dia(M) LENGTH T.LENGTH NO OF BAR
MM
C1 1.6 4.05 5.65 32 40
C2 1.6 4.05 5.65 32 40
C3 1.6 4.05 5.65 32 28
C4 1 4.05 5.05 20 16
C4* 1 4.05 5.05 20 16
C5 1 4.05 5.05 20 16
C6 1 4.05 5.05 20 16
C7 1 4.05 5.05 20 14
C8 1 4.05 5.05 20 16
C9 1 4.05 5.05 20 16
C10 1 4.05 5.05 20 16
C10* 1 4.05 5.05 20 16
C11 1 4.05 5.05 20 16
C12 1 4.05 5.05 20 14
C13 0.8 4.05 4.85 16 12
C14 1 4.05 5.05 20 12
C15 0.8 4.05 4.85 16 12
C16 1 4.05 5.05 20 16
C23 1 4.05 5.05 20 10
C24* 1 4.05 5.05 20 20
PC. C3* 1 4.05 5.05 20 12
post 0.8 4.05 4.85 16 4
Total
TAKE OFF SHEET COLUMNS (stirup
DIA
COLUMN Bar .L DIS-LENGTH Space NO OF BAR
MM
C1 16.27 4.05 0.15 8 28
C2 12.12 4.05 0.15 8 28
C3 4.05 0.15 8 28
C4 4.05 0.15 8 28
C4* 4.05 0.15 8 28
C5 4.05 0.15 8 28
C6 4.05 0.15 8 28
C7 4.05 0.15 8 28
C8 4.05 0.15 8 28
C9 4.05 0.15 8 28
C10 4.05 0.15 8 28
C10* 4.05 0.15 8 28
C11 4.05 0.15 8 28
C12 4.05 0.15 8 28
C13 4.05 0.15 8 28
C14 4.05 0.15 8 28
C15 4.05 0.15 8 28
C16 4.05 0.15 8 28
C23 4.05 0.15 8 28
C24* 4.05 0.15 8 28
PC. C3* 4.05 0.15 8 28
post 0.4 4.05 0.15 8 28
Total

COLUMN MAIN BAR BS1


DIA
COLUMN TYPE 50*Dia(M) LENGTH T.LENGTH NO OF BAR
MM
0.00 LVL 0.3 3.65 3.95 32 40
C17 0.3 3.65 3.95 32 40
C18 0.3 3.65 3.95 32 28
C19 0.3 3.65 3.95 20 16
C20 0.3 3.65 3.95 20 16
C21 0.3 3.65 3.95 20 16
1.25 LVL 1 1 20 16
c1 1 4.9 5.9 20 14
c2 1 4.9 5.9 20 16
c3 1 4.9 5.9 20 16
c5 1 4.9 5.9 20 16
c6 1 4.9 5.9 20 16
c7 1 4.9 5.9 20 16
c8 1 4.9 5.9 20 14
c9 0.8 4.9 5.7 16 12
c10 1 4.9 5.9 20 12
c12 0.8 4.9 5.7 16 12
c13 1 4.9 5.9 20 16
1 4.9 5.9 20 10
C24* 1 4.9 5.9 20 20
PC. C3* 1 4.9 5.9 20 12
post 0.8 4.9 5.7 16 4
Total

TAKE OFF SHEET COLUMNS (stirup


DIA
COLUMN Bar .L DIS-LENGTH Space NO OF BAR
MM
0.00 LVL 16.27 0.15 8 1
C17 12.12 3.65 0.15 8 25
C18 3.65 0.15 8 25
C19 3.65 0.15 8 25
C20 3.65 0.15 8 25
C21 3.65 0.15 8 25
1.25 LVL 0.15 8 1
c1 4.9 0.15 8 34
c2 4.9 0.15 8 34
c3 4.9 0.15 8 34
c5 4.9 0.15 8 34
c6 4.9 0.15 8 34
c7 4.9 0.15 8 34
c8 4.9 0.15 8 34
c9 4.9 0.15 8 34
c10 4.9 0.15 8 34
c12 4.9 0.15 8 34
c13 4.9 0.15 8 34
C23 4.9 0.15 8 34
C24* 4.9 0.15 8 34
PC. C3* 4.9 0.15 8 34
post 0.4 4.9 0.15 8 34
Total

COLUMN MAIN BAR GR


DIA
COLUMN TYPE 50*Dia(M) LENGTH T.LENGTH NO OF BAR
MM
c1 1.6 4.2 5.8 32 20
c1 1.25 4.2 5.45 25 20
c2 1.6 4.2 5.8 32 18
c2 1.25 4.2 5.45 25 18
c3 1.6 4.2 5.8 32 24
c4 1.6 4.2 5.8 32 16
c4 1.25 4.2 5.45 25 14
c5 0 4.2 4.2
c6 0 4.2 4.2
c7 0 4.2 4.2
c8 0 4.2 4.2
c9 0 4.2 4.2
c10 0 4.2 4.2
c12 0 4.2 4.2
c13 0 4.2 4.2
0 4.2 4.2
C24* 0 4.2 4.2
PC. C3* 0 4.2 4.2
post 0 4.2 4.2
Total
TAKE OFF SHEET COLUMNS (stirup
DIA
COLUMN Bar .L DIS-LENGTH Space NO OF BAR
MM
c1 12.5 4.2 0.15 8 29
c2 12 4.2 0.15 8 29
c3 4.2 0.15 8 29
c5 4.2 0.15 8 29
c6 4.2 0.15 8 29
c7 4.2 0.15 8 29
c8 4.2 0.15 8 29
c9 4.2 0.15 8 29
c10 4.2 0.15 8 29
c12 4.2 0.15 8 29
c13 4.2 0.15 8 29
C23 4.2 0.15 8 29
C24* 4.2 0.15 8 29
PC. C3* 4.2 0.15 8 29
post 0.4 4.2 0.15 8 29
Total

COLUMN MAIN BAR MEZZ


DIA
COLUMN TYPE 50*Dia(M) LENGTH T.LENGTH NO OF BAR
MM
c1 1.6 4.2 5.8 32 20
c1 1.25 4.2 5.45 25 20
c2 1.6 4.2 5.8 32 18
c2 1.25 4.2 5.45 25 18
c3 1.6 4.2 5.8 32 24
c4 1.6 4.2 5.8 32 16
c4 1.25 4.2 5.45 25 14
c5 0 4.2 4.2
c6 0 4.2 4.2
c7 0 4.2 4.2
c8 0 4.2 4.2
c9 0 4.2 4.2
c10 0 4.2 4.2
c12 0 4.2 4.2
c13 0 4.2 4.2
0 4.2 4.2
C24* 0 4.2 4.2
PC. C3* 0 4.2 4.2
post 0 4.2 4.2
Total

TAKE OFF SHEET COLUMNS (stirup


DIA
COLUMN Bar .L DIS-LENGTH Space NO OF BAR
MM
c1 12.5 4.2 0.15 8 29
c2 12 4.2 0.15 8 29
c3 4.2 0.15 8 29
c5 4.2 0.15 8 29
c6 4.2 0.15 8 29
c7 4.2 0.15 8 29
c8 4.2 0.15 8 29
c9 4.2 0.15 8 29
c10 4.2 0.15 8 29
c12 4.2 0.15 8 29
c13 4.2 0.15 8 29
C23 4.2 0.15 8 29
C24* 4.2 0.15 8 29
PC. C3* 4.2 0.15 8 29
post 0.4 4.2 0.15 8 29
Total

COLUMN MAIN BAR 1ST


DIA
COLUMN TYPE 50*Dia(M) LENGTH T.LENGTH NO OF BAR
MM
c1 1.25 4.2 5.45 25 40
c2 1.25 4.2 5.45 25 30
c3 0 4.2 4.2
c3 0 4.2 4.2
c4 0 4.2 4.2
c5 0 4.2 4.2
c6 0 4.2 4.2
c7 0 4.2 4.2
c8 0 4.2 4.2
c9 0 4.2 4.2
c10 0 4.2 4.2
c12 0 4.2 4.2
c13 0 4.2 4.2
0 4.2 4.2
C24* 0 4.2 4.2
PC. C3* 0 4.2 4.2
post 0 4.2 4.2
Total

TAKE OFF SHEET COLUMNS (stirup


DIA
COLUMN Bar .L DIS-LENGTH Space NO OF BAR
MM
c1 12.5 4.2 0.15 8 29
c2 12 4.2 0.15 8 29
c3 4.2 0.15 8 29
c5 4.2 0.15 8 29
c6 4.2 0.15 8 29
c7 4.2 0.15 8 29
c8 4.2 0.15 8 29
c9 4.2 0.15 8 29
c10 4.2 0.15 8 29
c12 4.2 0.15 8 29
c13 4.2 0.15 8 29
C23 4.2 0.15 8 29
C24* 4.2 0.15 8 29
PC. C3* 4.2 0.15 8 29
post 0.4 4.2 0.15 8 29
Total
dowel bar retaining wall
DIA
50*Dia(M) LENGTH T.LENGTH NO OF BAR
MM
1 1.2 3.2 20 2385
0.8 1.2 2.8 16 2385

Total

bs 2 retaining wall
DIA
COLUMN 50*Dia(M) LENGTH T.LENGTH NO OF BAR
MM
vertical bar 1 4.05 5.05 20 2385
vertical bar 0.8 4.05 4.85 16 2385
horizontal bar 0.6 298 312.4 12 21
horizontal bar 0.6 298 312.4 12 21

Total

bs 1 retaining wall
DIA
COLUMN 50*Dia(M) LENGTH T.LENGTH NO OF BAR
MM
vertical bar +0.00 0.3 3.65 3.95 16 1985
vertical bar +0.00 0.3 3.65 3.95 16 1985
vertical bar +0.65 0.3 4.3 4.6 16 177
vertical bar +0.65 0.3 4.3 4.6 16 177
vertical bar +0.85 0.3 4.5 4.8 16 225
vertical bar +0.85 0.3 4.5 4.8 16 225
horizontal bar +0.00 0.6 248 260.6 12 19
horizontal bar +0.00 0.6 248 260.6 12 19
horizontal bar +0.65 0.6 22 22.6 12 23
horizontal bar +0.65 0.6 22 22.6 12 23
horizontal bar +0.85 0.6 28 29.2 12 24
horizontal bar +0.85 0.6 28 29.2 12 24

Total
Qty m3 final qty m3

4808

4808

42791.2 42,936 4,807,965,880.03


77.112

33.614 298,694.61
33.614

43,656.74

2703.235 7,607.64

41.52 29,829,853.01
27.44

27.44

269.96

Formwork
m2
29.87 RAFT EDGE
14.28 PIT AREA F/W

3.46
3.3
1.8 1.96
1.96
1.8
1.96
14.28

44.15

Formwork
m2

14.9
1.65
0.9
0.9

18.35

VOLUME
Formwork m2
QTY M3
5733.756 357.6 WOOD SHUTTERING

20.4
3.15
3.15
5707.056

69 89.02 BLOCK SHUTTERING


28.35
28.35

5832.756
Formwork
m2
39.96
29.6
81.4 3.7
0
0
0
0
0
0
0
0
0
111

Formwork
m2

26
83.2
5.2
20.8
126.75

49.14
0
0
0
0
0
0
0
0
0
0
0
311.09
Formwork
m2
38.5
29.26
80.85
0
0
0
0
0
0
0
0
0
110.11

Formwork
m2
38.5
29.26
80.85
0
0
0
0
0
0
0
0
0
110.11
Formwork
m2
34.65
27.72
77
0
0
0
0
0
0
0
0
0
104.72

Formwork
m2
17.325
27.72
77
0
0
0
0
0
0
0
0
0
104.72
###

F/W CON
M2
4,695.11

4,695.11
VERTICAL
F/W QTY M2
AREA
79.156 1,092.59
27.202 141.33
22.6 229.51
39.2 272.45
78.4 2,802.20
68.42 68.42
29.3895 29.39

4,635.89

VERTICAL
F/W QTY M2
AREA
0 76.30
0 36.44
0 -

112.74

76,306,200.00
Formwork
m2
139.12
114.7
57.72
74.74
0
0
0
0
0
0
0
0
247.16

r
QTY WT/M WT(KG)

2 6.318 2178.474
2 6.318 2178.474
2 6.318 1524.932
1 2.468 122.808
1 2.468 122.808
3 2.468 368.423
2 2.468 245.615
6 2.468 644.740
4 2.468 491.231
7 2.468 859.654
1 2.468 122.808
1 2.468 122.808
2 2.468 245.615
7 2.468 752.197
9 1.580 462.294
2 2.468 184.212
1.580
4 2.468 491.231
1 2.468 76.755
1 2.468 153.510
4 2.468 368.423
2 1.580 34.244
###

BS2
QTY WT/M WT(KG)

2 6.318 2855.772
2 6.318 2855.772
2 6.318 1999.041
1 2.468 199.414
1 2.468 199.414
3 2.468 598.243
2 2.468 398.829
6 2.468 1046.926
4 2.468 797.658
7 2.468 1395.901
1 2.468 199.414
1 2.468 199.414
2 2.468 398.829
7 2.468 1221.413
9 1.580 827.353
2 2.468 299.122
1.580
4 2.468 797.658
1 2.468 124.634
1 2.468 249.268
4 2.468 598.243
2 1.580 61.285
###
UMNS (stirupps) BS2
QTY WT/M WT(KG)

2 0.395 359.783
2 0.395 268.013
2 0.395 0.000
1 0.395 0.000
1 0.395 0.000
3 0.395 0.000
2 0.395 0.000
6 0.395 0.000
4 0.395 0.000
7 0.395 0.000
1 0.395 0.000
1 0.395 0.000
2 0.395 0.000
7 0.395 0.000
9 0.395 0.000
2 0.395 0.000
0.395 0.000
4 0.395 0.000
1 0.395 0.000
1 0.395 0.000
4 0.395 0.000
2 0.395 8.845
636.641

BS1
QTY WT/M WT(KG)
4 6.318 3993.027
16 6.318 15972.106
1 6.318 698.780
4 2.468 623.910
15 2.468 2339.664
2.468 0.000
2 2.468 78.976
2 2.468 407.714
5 2.468 1164.896
6 2.468 1397.875
9 2.468 2096.813
8 2.468 1863.834
4 2.468 931.917
2 2.468 407.714
35 1.580 3781.371
2.468 0.000
1.580
2.468 0.000
2.468 0.000
1 2.468 291.224
4 2.468 698.938
2 1.580 72.026
###

UMNS (stirupps) BS2


QTY WT/M WT(KG)

2 0.395 12.849
2 0.395 242.488
2 0.395 0.000
1 0.395 0.000
1 0.395 0.000
3 0.395 0.000
2 0.395 0.000
6 0.395 0.000
4 0.395 0.000
7 0.395 0.000
1 0.395 0.000
1 0.395 0.000
2 0.395 0.000
7 0.395 0.000
9 0.395 0.000
2 0.395 0.000
0.395 0.000
4 0.395 0.000
1 0.395 0.000
1 0.395 0.000
4 0.395 0.000
2 0.395 10.635
265.973

GR
QTY WT/M WT(KG)
2 6.318 1465.795
2 3.856 840.663
5 6.318 3298.038
5 3.856 1891.491
6 6.318 5276.860
8 6.318 4690.543
8 3.856 2353.855
9 0.000 0.000
8 0.000 0.000
4 0.000 0.000
2 0.000 0.000
35 0.000 0.000
0.000 0.000
0.000
0.000 0.000
0.000 0.000
1 0.000 0.000
4 0.000 0.000
2 0.000 0.000
###
UMNS (stirupps) BS2
QTY WT/M WT(KG)
2 0.395 286.288
2 0.395 274.836
5 0.395 0.000
5 0.395 0.000
6 0.395 0.000
8 0.395 0.000
8 0.395 0.000
9 0.395 0.000
8 0.395 0.000
4 0.395 0.000
2 0.395 0.000
35 0.395 0.000
0.395 0.000
0.395 0.000
2 0.395 9.161
570.286

MEZZ
QTY WT/M WT(KG)
2 6.318 1465.795
2 3.856 840.663
5 6.318 3298.038
5 3.856 1891.491
6 6.318 5276.860
8 6.318 4690.543
8 3.856 2353.855
9 0.000 0.000
8 0.000 0.000
4 0.000 0.000
2 0.000 0.000
35 0.000 0.000
0.000 0.000
0.000
0.000 0.000
0.000 0.000
1 0.000 0.000
4 0.000 0.000
2 0.000 0.000
###

MNS (stirupps) MEZZ


QTY WT/M WT(KG)
2 0.395 286.288
2 0.395 274.836
5 0.395 0.000
5 0.395 0.000
6 0.395 0.000
8 0.395 0.000
8 0.395 0.000
9 0.395 0.000
8 0.395 0.000
4 0.395 0.000
2 0.395 0.000
35 0.395 0.000
0.395 0.000
0.395 0.000
2 0.395 9.161
570.286

1ST
QTY WT/M WT(KG)
2 3.856 1681.325
5 3.856 3152.484
6 0.000 0.000
6 0.000 0.000
8 0.000 0.000
9 0.000 0.000
8 0.000 0.000
4 0.000 0.000
2 0.000 0.000
35 0.000 0.000
0.000 0.000
0.000
0.000 0.000
0.000 0.000
1 0.000 0.000
4 0.000 0.000
2 0.000 0.000
4,833.809

MNS (stirupps) MEZZ


QTY WT/M WT(KG)
2 0.395 286.288
2 0.395 274.836
5 0.395 0.000
5 0.395 0.000
6 0.395 0.000
8 0.395 0.000
8 0.395 0.000
9 0.395 0.000
8 0.395 0.000
4 0.395 0.000
2 0.395 0.000
35 0.395 0.000
0.395 0.000
0.395 0.000
2 0.395 9.161
570.286
aining wall
distributi WT(KG)
on length Space WT/M

298 0.125 2.468 18,835.78


298 0.125 1.580 10,548.03
0.000

29,383.81

ing wall
distributi WT(KG)
on length Space WT/M

298 0.125 2.468 29,725.21


298 0.125 1.580 18,270.70
4.05 0.2 0.888 5,898.17
4.05 0.2 0.888 5,898.17

59,792.26

ing wall
distributi WT(KG)
Space WT/M
on length
248 0.125 1.580 12,384.62
248 0.125 1.580 12,384.62
22 0.125 1.580 1,286.05
22 0.125 1.580 1,286.05
28 0.125 1.580 1,705.88
28 0.125 1.580 1,705.88
3.65 0.2 0.888 4,457.10
3.65 0.2 0.888 4,457.10
4.3 0.2 0.888 451.79
4.3 0.2 0.888 451.79
4.5 0.2 0.888 609.67
4.5 0.2 0.888 609.67

41,790.24
Additional Steel

items.No L(M)= Dia(MM) Space(M) Distance QTY

1 3.0 20 0.15 3 21
2 3.0 20 0.30 3 11
3 6.0 20 0.30 7.50 26
4 3.0 25 0.15 3 21
5 3.0 20 0.15 3 21
6 3.0 25 0.15 3 21
7 #DIV/0!
8 #DIV/0!
9 #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
10 #DIV/0!
11 #DIV/0!
12 #DIV/0!
110 ToTal Additional Steel(KG)=

BASEMENT -01- G.FLOOR RAMP STEEL QUANTITIES

LENGTH DISTANCE SPACE QTY

(N-4)-(N-7) LONG SPAN TOP 29.448 3.66 0.2 19

BOTT 26.958 3.66 0.2 19

SHORT SPAN TOP 4.41 25.76 0.15 173

BOTT 4.41 25.76 0.15 173

(A*-4)-(A*7) LONG SPAN TOP 29.448 3.66 0.2 19

BOTT 26.958 3.66 0.2 19

SHORT SPAN TOP 4.41 25.26 0.15 169

BOTT 4.41 25.26 0.15 169


TOTAL(KG)

STRUCTURAL - STAIRS
NO length Width height area

Stair case -01

Riser Hight 0.1685 staircase concr

Step Width 0.28

stair slab thick 0.18

Stair width 1.31

No.of Ste 20

0.35 4.55 floor

Landing 0.18 3.75 landing concre

TAKE OFF SHEET COLUMNS (MAIN BAR


DIA
COLUMN 50*Dia(M) LENGTH T.LENGTH NO OF BAR QTY
MM
C1 1.6 4.05 5.65 32 40 2
C2 1.6 4.05 5.65 32 40 5
C3 1.6 4.05 5.65 32 28
C4 1.6 4.05 5.65 32 30
C4* 0 4.05 4.05
C5 0 4.05 4.05
C6 0 4.05 4.05
C7 0 4.05 4.05
C8 0 4.05 4.05
C9 0 4.05 4.05
C10 0 4.05 4.05
C10* 0 4.05 4.05
C11 0 4.05 4.05
C12 0 4.05 4.05
C13 0 4.05 4.05
C14 0 4.05 4.05
C15 0 4.05 4.05
C16 0 4.05 4.05
C23 0 4.05 4.05
C24* 0 4.05 4.05
PC. C3* 0 4.05 4.05
post 0 4.05 4.05
Total

TAKE OFF SHEET COLUMNS (stirupps)


DIA
COLUMN Bar .L DIS-LENGTH Space NO OF BAR QTY
MM
C1 16.55 4.05 0.15 8 28 2
C2 12.15 4.05 0.15 8 28 5
C3 4.05 #DIV/0!
C4 4.05 #DIV/0!
C4* 4.05 #DIV/0!
C5 4.05 #DIV/0!
C6 4.05 #DIV/0!
C7 4.05 #DIV/0!
C8 4.05 #DIV/0!
C9 4.05 #DIV/0!
C10 4.05 #DIV/0!
C10* 4.05 #DIV/0!
C11 4.05 #DIV/0!
C12 4.05 #DIV/0!
C13 4.05 #DIV/0!
C14 4.05 #DIV/0!
C15 4.05 #DIV/0!
C16 4.05 #DIV/0!
C23 4.05 #DIV/0!
C24* 4.05 #DIV/0!
PC. C3* 4.05 #DIV/0!
post 0 4.05 #DIV/0!
Total

dowel bar
DIA
COLUMN 50*Dia(M) LENGTH T.LENGTH NO OF BAR QTY
MM
C1 1.6 1.2 4.4 32 40 2
C2 1.6 1.2 4.4 32 40 2
C3 1.6 1.2 4.4 32 28 2
C4 1 1.2 3.2 20 16 1
C4* 1 1.2 3.2 20 16 1
C5 1 1.2 3.2 20 16 3
C6 1 1.2 3.2 20 16 2
C7 1 1.2 3.2 20 14 6
C8 1 1.2 3.2 20 16 4
C9 1 1.2 3.2 20 16 7
C10 1 1.2 3.2 20 16 1
C10* 1 1.2 3.2 20 16 1
C11 1 1.2 3.2 20 16 2
C12 1 1.2 3.2 20 14 7
C13 0.8 1.2 2.8 16 12 9
C14 1 1.2 3.2 20 12 2
C15 0.8 1.2 2.8 16 12
C16 1 1.2 3.2 20 16 4
C23 1 1.2 3.2 20 10 1
C24* 1 1.2 3.2 20 20 1
PC. C3* 1 1.2 3.2 20 12 4
post 0.8 1.2 2.8 16 4 2
Total
dowel bar retaining wall
DIA
COLUMN 50*Dia(M) LENGTH T.LENGTH NO OF BAR distribution
MM length
1 1.2 3.2 20 2391 298.7
0.8 1.2 2.8 16 2391 298.7

Total

basement 2main bar


DIA
COLUMN 50*Dia(M) LENGTH T.LENGTH NO OF BAR QTY
MM
C1 1.6 4.05 5.65 32 40 2
C2 1.6 4.05 5.65 32 40 2
C3 1.6 4.05 5.65 32 28 2
C4 1 4.05 5.05 20 16 1
C4* 1 4.05 5.05 20 16 1
C5 1 4.05 5.05 20 16 3
C6 1 4.05 5.05 20 16 2
C7 1 4.05 5.05 20 14 6
C8 1 4.05 5.05 20 16 4
C9 1 4.05 5.05 20 16 7
C10 1 4.05 5.05 20 16 1
C10* 1 4.05 5.05 20 16 1
C11 1 4.05 5.05 20 16 2
C12 1 4.05 5.05 20 14 7
C13 0.8 4.05 4.85 16 12 9
C14 1 4.05 5.05 20 12 2
C15 0.8 4.05 4.85 16 12
C16 1 4.05 5.05 20 16 4
C23 1 4.05 5.05 20 10 1
C24* 1 4.05 5.05 20 20 1
PC. C3* 1 4.05 5.05 20 12 4
post 0.8 4.05 4.85 16 4 2
Total
TAKE OFF SHEET COLUMNS (stirupps) BS
DIA
COLUMN Bar .L DIS-LENGTH Space NO OF BAR QTY
MM
C1 16.25 4.05 0.15 8 28 2
C2 12.15 4.05 0.15 8 28 2
C3 4.05 #DIV/0! 2
C4 4.05 #DIV/0! 1
C4* 4.05 #DIV/0! 1
C5 4.05 #DIV/0! 3
C6 4.05 #DIV/0! 2
C7 4.05 #DIV/0! 6
C8 4.05 #DIV/0! 4
C9 4.05 #DIV/0! 7
C10 4.05 #DIV/0! 1
C10* 4.05 #DIV/0! 1
C11 4.05 #DIV/0! 2
C12 4.05 #DIV/0! 7
C13 4.05 #DIV/0! 9
C14 4.05 #DIV/0! 2
C15 4.05 #DIV/0!
C16 4.05 #DIV/0! 4
C23 4.05 #DIV/0! 1
C24* 4.05 #DIV/0! 1
PC. C3* 4.05 #DIV/0! 4
post 0 4.05 #DIV/0! 2
Total
basement 1 main bar
DIA
COLUMN 50*Dia(M) LENGTH T.LENGTH NO OF BAR QTY
MM
S.S.L 0.00
C17 0.5 3.65 4.15 10 16 2
C18 1.6 3.65 5.25 32 28 2
C20 1 3.65 4.65 20 16 1
C21 1 3.65 4.65 20 16 1
S.S.L + 0.65
C19 1 4.3 5.3 20 16 2
S.S.L + 0.15
C18 1 3.8 4.8 20 16 4
C21 1 3.8 4.8 20 16 7
S.S.L + 1.25
C1 1 4.9 5.9 20 16 1
C2 1 4.9 5.9 20 16 2
C3 1 4.9 5.9 20 14 7
C5 0.8 4.9 5.7 16 12 9
C6 1 4.9 5.9 20 12 2
C7 0.8 4.9 5.7 16 12
C8 0 4.9 4.9
C9 0 4.9 4.9
C10 0 4.9 4.9
C11 0 4.9 4.9
C12 0 4.9 4.9
C13 0 4.9 4.9
C14 0 4.9 4.9
C16 1 4.9 5.9 20 16 4
Total
TAKE OFF SHEET COLUMNS (stirupps) BS
DIA
COLUMN Bar .L DIS-LENGTH Space NO OF BAR QTY
MM
S.S.L 0.00
C17 12.15 3.65 0.2 10 19 2
C18 4.05 #DIV/0! 2
C20 4.05 #DIV/0! 1
C21 4.05 #DIV/0! 1
S.S.L + 0.65
C19 4.05 #DIV/0! 2
S.S.L + 0.15
C18 4.05 #DIV/0! 4
C21 4.05 #DIV/0! 7
S.S.L + 1.25
C1 4.05 #DIV/0! 1
C2 4.05 #DIV/0! 3
C3 4.05 #DIV/0! 2
C5 4.05 #DIV/0! 6
C6 4.05 #DIV/0! 4
C7 4.05 #DIV/0! 7
C8 4.05 #DIV/0! 1
C9 4.05 #DIV/0! 1
C10 4.05 #DIV/0! 2
C11 4.05 #DIV/0! 7
C12 4.05 #DIV/0! 9
C13 4.05 #DIV/0! 2
C14 4.05 #DIV/0!
C16 4.05 #DIV/0! 4
4.05 #DIV/0! 1
Total

col concrete bs1


description unit length width height no.of item qty
S.S.L 0.00
C17 m3 0.8 0.2 3.25 4 2.08
C18 m3 0.6 0.2 3.25 5 1.95
C20 m3 0.5 0.3 3.25 4 1.95
C21 m3 0.8 0.5 3.25 12 15.6
S.S.L + 0.65 0
C19 m3 0.95 0.2 4.15 1 0.7885
S.S.L + 0.15 0
C18 m3 0.6 0.2 3.65 8 3.504
C21 m3 0.8 0.5 3.65 2 2.92
S.S.L + 1.25 0
C1 m3 2.1 0.6 4.55 2 11.466
C2 m3 1 1 4.55 2 9.1
C3 1.5 0.7 4.55 2 9.555
C5 1.8 0.5 4.55 3 12.285
C6 1.6 0.5 4.55 2 7.28
C7 1.4 0.5 4.55 5 15.925
C8 1.2 0.5 4.55 4 10.92
C9 1.2 0.5 4.55 7 19.11
C10 0.8 0.8 4.55 2 5.824
C11 0.8 0.6 4.55 2 4.368
C12 1 0.5 4.55 8 18.2
C13 0.8 0.4 4.55 6 8.736
C14 1.4 0.3 4.55 2 3.822
C16 1.2 0.5 4.55 4 10.92
m3 4.55 0
total 176.3035

bs 2 retaining wall
DIA distribution
COLUMN 50*Dia(M) LENGTH T.LENGTH NO OF BAR
MM length
vertical bar 1 4.05 5.05 20 2391 298.7
vertical bar 0.8 4.05 4.85 16 2391 298.7
horizontal bar 0.6 298.7 313.7 12 21 4.05
horizontal bar 0.6 298.7 313.7 12 21 4.05

Total

bs 1 retaining wall
DIA distribution
COLUMN 50*Dia(M) LENGTH T.LENGTH NO OF BAR length
MM
vertical bar +0.00
0.3 3.65 3.95 20 1991 248.7
vertical bar +0.00
0.3 3.65 3.95 16 1991 248.7
vertical bar +0.65
0.3 4.3 4.6 20 177 22
vertical bar +0.65
0.3 4.3 4.6 16 177 22
vertical bar +0.85
0.3 4.5 4.8 20 225 28
vertical bar +0.85
0.3 4.5 4.8 16 225 28
horizontal bar +0.00
0.6 248.7 261.3 12 19 3.65
horizontal bar +0.00
0.6 248.7 261.3 12 19 3.65
horizontal bar +0.65
0.6 22 22.6 12 23 4.3
horizontal bar +0.65
0.6 22 22.6 12 23 4.3
horizontal bar +0.85
0.6 28 29.2 12 24 4.5
horizontal bar +0.85
0.6 28 29.2 12 24 4.5

Total

dowel bar shear wall,core


length OF
WALL space 50*Dia(M) LENGTH T.LENGTH

A 8.9 0.12 1 1.11 3.11


W1
C 1.25 1.11 3.61
A 8.9 0.12 1 1.11 3.11
W1
C 1.25 1.11 3.61
A 7.45 0.15 1 1.11 3.11
W2
C 1.25 1.11 3.61
A 7.45 0.15 1 1.11 3.11
W2
C 1.25 1.11 3.61

CORE 1 A 14.52 0.15 0.8 1.11 2.71


C 1 1.11 3.11
Total

shear wall,core
length OF
D.LENGTH space 50*Dia(M) LENGTH
WALL
A 8.9 0.12 1 4.05
B 4.05 0.2 19.44
W1
C 1.25 4.05
W1

STRU
A 8.9 0.12 1 4.05
B 4.05 0.2 19.8
W1
C 1.25 4.05
STRU
A 7.45 0.15 1 4.05
B 4.05 0.2 15.74
W2
C 1.25 4.05
STRU

CORE 1 A 14.52 0.15 0.8 4.05


B 4.05 0.2 34
C 1 4.05
STRU

Total

shear wall,core
length OF
D.LENGTH WALL space 50*Dia(M) LENGTH

A 8.9 0.12 1 4.9


B 4.9 0.2 19.44
W1
C 1.25 4.9
STRU
A 8.9 0.12 1 4.9
B 4.9 0.2 19.8
W1
C 1.25 4.9
STRU
A 7.45 0.15 1 4.9
B 4.9 0.2 15.74
W2
C 1.25 4.9
STRU

CORE 1 A 14.52 0.15 0.8 4.9


B 4.9 0.2 34
C 1 4.9
STRU
Total

shear wall,core
length OF
D.LENGTH WALL space 50*Dia(M) LENGTH

A 8.9 0.15 1 4.2


B 4.2 0.2 19.44
W1
C 1.25 4.2
STRU
A 8.9 0.15 1 4.2
B 4.2 0.2 19.8
W1
C 1.25 4.2
STRU
A 7.45 0.2 1 4.2
B 4.2 0.2 15.74
W2
C 1.25 4.2
STRU

CORE 1 A 14.52 0.15 0.8 4.2


B 4.2 0.2 34
C 1 4.2
STRU

Total
W/M W(KG) Notes

2.4691 155.56
2.4691 81.48
2.4691 385.19
3.8580 243.06
2.4691 155.56
3.8580 243.06
0.0000 #DIV/0!
0.0000 #DIV/0! 1.55

0.0000 #DIV/0! 2.11

0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0!
0.0000 #DIV/0! 0.16

0.0000 #DIV/0! 0.169

0.0000 #DIV/0! 2.76

tional Steel(KG)= #DIV/0!


#DIV/0!

L QUANTITIES

DIA(MM) WEIGTH T.WEIGHTKG)

10 0.617 350.670

10 0.617 321.019

12 0.88848 676.803

12 0.88848 676.803

10 0.617 350.670

10 0.617 321.019

12 0.88848 663.743

12 0.88848 663.743
4024.468

Total-Qty Unit

2.16 m3

1.59 m3

0.68 m3

4.43

NS (MAIN BAR)
WT/M WT(KG)

6.318 2855.772
6.318 7139.430
6.318 0.000
6.318 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
###

NS (stirupps)
WT/M WT(KG)

0.395 365.975
0.395 671.691
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
#DIV/0!

WT/M WT(KG)

6.318 2223.964
6.318 2223.964
6.318 1556.775
2.468 126.362
2.468 126.362
2.468 379.085
2.468 252.723
2.468 663.398
2.468 505.446
2.468 884.531
2.468 126.362
2.468 126.362
2.468 252.723
2.468 773.965
1.580 477.647
2.468 189.542
1.580
2.468 505.446
2.468 78.976
2.468 157.952
2.468 379.085
1.580 35.381
###
all
WT(KG)
Space WT/M

0.125 2.468 18,880.00


0.125 1.580 10,572.80
0.000

###

WT/M WT(KG)

6.318 2855.772
6.318 2855.772
6.318 1999.041
2.468 199.414
2.468 199.414
2.468 598.243
2.468 398.829
2.468 1046.926
2.468 797.658
2.468 1395.901
2.468 199.414
2.468 199.414
2.468 398.829
2.468 1221.413
1.580 827.353
2.468 299.122
1.580
2.468 797.658
2.468 124.634
2.468 249.268
2.468 598.243
1.580 61.285
###
(stirupps) BS-2 ###

WT/M WT(KG)

0.395 359.341
0.395 268.676
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
#DIV/0!
WT/M WT(KG)

0.617 81.938
6.318 1857.516
2.468 183.619
2.468 183.619

2.468 418.573

2.468 758.170
2.468 1326.797

2.468 232.979
2.468 465.958
2.468 1426.998
1.580 972.353
2.468 349.469
1.580 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
2.468 931.917
###
(stirupps) BS-2
WT/M WT(KG)

0.617 288.617 ###


0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!

0.000 #DIV/0!

0.000 #DIV/0!
0.000 #DIV/0!

0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
0.000 #DIV/0!
#DIV/0!

Formwork m2

26
26
20.8
101.4
0
9.545
0
46.72
18.98
0
49.14
36.4
40.04
62.79
38.22
86.45
61.88
108.29
29.12
25.48
109.2
65.52
30.94
61.88
0
1054.795

WT(KG)
Space WT/M

0.125 2.468 29,795.00


0.125 1.580 18,313.60
0.2 0.888 5,922.72
0.2 0.888 5,922.72

###

WT(KG)
Space WT/M

0.125 2.468 19,405.56


0.125 1.580 12,419.56
0.125 2.468 2,009.45
0.125 1.580 1,286.05
0.125 2.468 2,665.44
0.125 1.580 1,705.88
0.2 0.888 4,469.08
0.2 0.888 4,469.08
0.2 0.888 451.79
0.2 0.888 451.79
0.2 0.888 609.67
0.2 0.888 609.67

###

ar shear wall,core wall


DIA
NO OF BAR QTY WT/M WT(KG)
MM
20 75 2 2.468 1,153.88
25 5 2 3.856 139.21
20 75 2 2.468 1,153.88
25 5 2 3.856 139.21
20 51 2 2.468 777.78
25 4 2 3.856 111.37
20 51 2 2.468 777.78
25 4 2 3.856 111.37

16 98 2 1.580 837.27
20 5 4 2.468 153.51
###

shear wall,core wall BASEMENT 2


DIA
T.LENGTH NO OF BAR QTY WT/M WT(KG)
MM
5.05 20 76.0 2 2.468 1,894.44
19.44 12 22.0 1 0.888 379.99
5.3 25 5 2 3.856 204.38
1.18 8 836 1 0.395 389.54
5.05 20 76.0 2 2.468 1,894.44
19.8 12 22.0 1 0.888 387.02
5.3 25 5 2 3.856 204.38
1.8 8 836 1 0.395 594.22
5.05 20 51.0 2 2.468 1,271.27
15.74 12 22.0 1 0.888 307.66
5.3 25 4 2 3.856 163.51
0.78 8 572 1 0.395 176.18

4.85 16 98.0 2 1.580 1,501.49


34 12 22.0 1 0.888 664.58
5.05 20 5 4 2.468 249.27
0.58 8 1078 1 0.395 246.89
10,529.252

shear wall,core wall BASEMENT 1


DIA
T.LENGTH NO OF BAR QTY WT/M WT(KG)
MM
5.9 20 76.0 2 2.468 2,213.30
19.44 12 26.0 1 0.888 449.07
6.15 25 5 2 3.856 237.16
1.18 8 988 1 0.395 460.37
5.9 20 76.0 2 2.468 2,213.30
19.8 12 26.0 1 0.888 457.39
6.15 25 5 2 3.856 237.16
1.8 8 988 1 0.395 702.25
5.9 20 51.0 2 2.468 1,485.24
15.74 12 26.0 1 0.888 363.60
6.15 25 4 2 3.856 189.73
0.78 8 676 1 0.395 208.21

5.7 16 98.0 2 1.580 1,764.64


34 12 26.0 1 0.888 785.42
5.9 20 5 4 2.468 291.22
0.58 8 1274 1 0.395 291.78
12,349.856

shear wall,core wall GROUND FLR


DIA
T.LENGTH NO OF BAR QTY WT/M WT(KG)
MM
5.2 20 61.0 2 2.468 1,565.70
19.44 12 23.0 1 0.888 397.26
5.45 25 5 2 3.856 210.17
1.18 8 713 1 0.395 332.23
5.2 20 61.0 2 2.468 1,565.70
19.8 12 23.0 1 0.888 404.61
5.45 25 5 2 3.856 210.17
1.8 8 713 1 0.395 506.79
5.2 20 39.0 2 2.468 1,001.02
15.74 12 23.0 1 0.888 321.65
5.45 25 4 2 3.856 168.13
0.78 8 460 1 0.395 141.68

5 16 98.0 2 1.580 1,547.93


34 12 23.0 1 0.888 694.79
5.2 20 5 4 2.468 256.67
0.58 8 1274 1 0.395 291.78
9,616.279
189.5

118.5

288.35

442.4

442.4

442.4

442.4
442.4

206.19
EXCAVATION AND EARTH WORK

Sr.no description unit length width

1 site clearance m2

2 top soil removal 150 mm thk. m2

3 excavation m3

add elevator pit

sum pit 1

sumpit2

4 disposal (excavation qty +top soil qty)

5 Anti-termite (ver.area +hor.area)

add elevator pit

sum pit 1

sumpit2

6 backfilling

BLINDING CONCRETE

description unit
length M width M
blinding concrete m2
dedt
elev.pit
sum.pit-1
sum.pit-2
SUB-TOTAL

ADD
elev.pit
sum.pit-1
sum.pit-2

TOTAL

SCREED CONCRETE

description unit
length M width M
SCREED concrete
RAFT EDGE
ADD ELEVATOR PIT
SUM PIT 1
SUM PIT 2

TOTAL

RAFT CONCRETE

description unit length M width M


RAFT M3
dedt
elev.pit
sum.pit-1
sum.pit-2
SUB-TOTAL

ADD
elev.pit
sum.pit-1
sum.pit-2

TOTAL

BASEMENT 2 COLUMN
COLUMN TYPE length width height
c1
c2
c3
c5
c6
c7
c8
c9
c10
c12
c13

total

BASEMENT 1 COLUMN
COLUMN TYPE length width height
0.00 LVL
C17
C18
C19
C20
C21
1.25 LVL
c1
c2
c3
c5
c6
c7
c8
c9
c10
c12
c13

total
GROUND FLOOR COLUMN
COLUMN TYPE length width height
c1
c2
c3
c5
c6
c7
c8
c9
c10
c12
c13

total

MEZZANINE FLOOR COLUMN


COLUMN TYPE length width height
c1
c2
c3
c5
c6
c7
c8
c9
c10
c12
c13

total
1ST FLOOR COLUMN
COLUMN TYPE length width height
c1
c2
c3
c5
c6
c7
c8
c9
c10
c12
c13

total

2ND FLOOR COLUMN


COLUMN TYPE length width height
c1
c2
c3
c5
c6
c7
c8
c9
c10
c12
c13

total

basement 2 ceiling slab (BASEMENT 2 BEAM)


BEAM TYPE length width height
B1(200X600)
B1(200X500)
B2
B3
c5
c6
c7
c8
c9
c10
c12
c13

total

BASEMENT 1 BEAM
BEAM TYPE length width height
B1
B2 with ramp
B2 with slab
b30 dropping
b30 inv
b29 inv
b8
b18 dropping
b18 inv
b16 inv
c12
c13

total

BASEMENT 1 BEAM
BEAM TYPE length width height
B1
B2 with ramp
B2 with slab
b30 dropping
b30 inv
b29 inv
b8
b18 dropping
b18 inv
b16 inv
c12
c13

total

ground BEAM
BEAM TYPE length width height
b5

total

BASEMENT 2 CEILING SLAB

slab TYPE AREA THK. CON.QTY M3

350MM

TOTAL 0

BASEMENT 1 CEILING SLAB


slab TYPE AREA THK. CON.QTY M3

400mm 0.00 lvl


350mm 0.00 lvl
200mm 0.00lvl
350mm 0.85/0.65 lvl
350mm 1.25 lvl
EXTRA FORMWORK
OUTSIDE

TOTAL 0

SUBSTATION SLAB

SLAB TYPE AREA THK. CON.QTY M3

150MM
180MM
0

TOTAL 0

SUBSTATION WALL
WALL TYPE length width height
350MM
425MM
352MM
200MM
200MM
200MM

total
BASEMENT 2 SHEAR WALL CORE WALL
WALL TYPE length width height
W1
W2
W2
W2

total

COLUMN dowel bar


COLUMN TYPE 50*Dia(M) LENGTH T.LENGTH

C1 1.6 1.11 4.31


C2 1.6 1.11 4.31
C3 1.6 1.11 4.31
C4 1 1.11 3.11
C4* 1 1.11 3.11
C5 1 1.11 3.11
C6 1 1.11 3.11
C7 1 1.11 3.11
C8 1 1.11 3.11
C9 1 1.11 3.11
C10 1 1.11 3.11
C10* 1 1.11 3.11
C11 1 1.11 3.11
C12 1 1.11 3.11
C13 0.8 1.11 2.71
C14 1 1.11 3.11
C15 0.8 1.11 2.71
C16 1 1.11 3.11
C23 1 1.11 3.11
C24* 1 1.11 3.11
PC. C3* 1 1.11 3.11
post 0.8 1.11 2.71
Total

COLUMN MAIN BAR BS2


COLUMN TYPE 50*Dia(M) LENGTH T.LENGTH

C1 1.6 4.05 5.65


C2 1.6 4.05 5.65
C3 1.6 4.05 5.65
C4 1 4.05 5.05
C4* 1 4.05 5.05
C5 1 4.05 5.05
C6 1 4.05 5.05
C7 1 4.05 5.05
C8 1 4.05 5.05
C9 1 4.05 5.05
C10 1 4.05 5.05
C10* 1 4.05 5.05
C11 1 4.05 5.05
C12 1 4.05 5.05
C13 0.8 4.05 4.85
C14 1 4.05 5.05
C15 0.8 4.05 4.85
C16 1 4.05 5.05
C23 1 4.05 5.05
C24* 1 4.05 5.05
PC. C3* 1 4.05 5.05
post 0.8 4.05 4.85
Total

TAKE OFF SHEET COLUMNS


COLUMN Bar .L DIS-LENGTH Space

C1 16.27 4.05 0.15


C2 12.12 4.05 0.15
C3 4.05 0.15
C4 4.05 0.15
C4* 4.05 0.15
C5 4.05 0.15
C6 4.05 0.15
C7 4.05 0.15
C8 4.05 0.15
C9 4.05 0.15
C10 4.05 0.15
C10* 4.05 0.15
C11 4.05 0.15
C12 4.05 0.15
C13 4.05 0.15
C14 4.05 0.15
C15 4.05 0.15
C16 4.05 0.15
C23 4.05 0.15
C24* 4.05 0.15
PC. C3* 4.05 0.15
post 0.4 4.05 0.15
Total

COLUMN MAIN BAR BS1


COLUMN TYPE 50*Dia(M) LENGTH T.LENGTH
0.00 LVL 0.3 3.65 3.95
C17 0.3 3.65 3.95
C18 0.3 3.65 3.95
C19 0.3 3.65 3.95
C20 0.3 3.65 3.95
C21 0.3 3.65 3.95
1.25 LVL 1 1
c1 1 4.9 5.9
c2 1 4.9 5.9
c3 1 4.9 5.9
c5 1 4.9 5.9
c6 1 4.9 5.9
c7 1 4.9 5.9
c8 1 4.9 5.9
c9 0.8 4.9 5.7
c10 1 4.9 5.9
c12 0.8 4.9 5.7
c13 1 4.9 5.9
1 4.9 5.9
C24* 1 4.9 5.9
PC. C3* 1 4.9 5.9
post 0.8 4.9 5.7
Total

TAKE OFF SHEET COLUMNS


COLUMN Bar .L DIS-LENGTH Space
0.00 LVL 16.27 0.15
C17 12.12 3.65 0.15
C18 3.65 0.15
C19 3.65 0.15
C20 3.65 0.15
C21 3.65 0.15
1.25 LVL 0.15
c1 4.9 0.15
c2 4.9 0.15
c3 4.9 0.15
c5 4.9 0.15
c6 4.9 0.15
c7 4.9 0.15
c8 4.9 0.15
c9 4.9 0.15
c10 4.9 0.15
c12 4.9 0.15
c13 4.9 0.15
C23 4.9 0.15
C24* 4.9 0.15
PC. C3* 4.9 0.15
post 0.4 4.9 0.15
Total
height Area m2 Qty m3 final qty m3

4808 4808

4808 4808

8.9 4808 42,791 4,807,965,880.03

298,694.61

29,829,853.01

height Area QTY Formwork


M M2 m2

0
height Area QTY Formwork
M M2 m2

0
0
0
0

0 0

E
height Area QTY VOLUME
Formwork m2
M M2 QTY M3

N
Con.Qty Formwork
No's M3 m2

0 0

N
Con.Qty Formwork
No's
M3 m2
MN
No's Con.Qty Formwork
M3 m2

0 0

UMN
Con.Qty Formwork
No's
M3 m2

0 0
Con.Qty Formwork
No's M3 m2

0 0

N
No's Con.Qty Formwork
M3 m2
0
0
0
0
0
0
0
0
0
0
0
0
0 0

2 BEAM)
Con.Qty Formwork
M3 m2
0
0
0
0
0
0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

Con.Qty Formwork
M3 m2
0 0
0
0
0
0
0
0
0
0
0
0
0
0 0
0 0

Con.Qty Formwork
M3 m2
0 0
0
0
0
0
0
0
0
0
0
0
0
0 0
0 0

Con.Qty Formwork
M3 m2
0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0 ###

SOFFIT VERTICAL F/W CON


AREA AREA M2
-

G SLAB
SOFFIT PERIMETER VERTICAL
F/W QTY M2
AREA M AREA
-
-
-
-
-
-
-

SOFFIT PERIMETER VERTICAL


F/W QTY M2
AREA M AREA
0 -
0 -
0 0 -

Con.Qty Formwork
M3 m2
0
0
0
0
0
0 0
0 0
0 0 76,306,200.00
0 0
ORE WALL
Con.Qty Formwork
No's
M3 m2
0
0
0
0
0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

insert raft bar

MN dowel bar
DIA
NO OF BAR QTY WT/M WT(KG)
MM
32 40 2 6.318 2178.474
32 40 2 6.318 2178.474
32 28 2 6.318 1524.932
20 16 1 2.468 122.808
20 16 1 2.468 122.808
20 16 3 2.468 368.423
20 16 2 2.468 245.615
20 14 6 2.468 644.740
20 16 4 2.468 491.231
20 16 7 2.468 859.654
20 16 1 2.468 122.808
20 16 1 2.468 122.808
20 16 2 2.468 245.615
20 14 7 2.468 752.197
16 12 9 1.580 462.294
20 12 2 2.468 184.212
16 12 1.580
20 16 4 2.468 491.231
20 10 1 2.468 76.755
20 20 1 2.468 153.510
20 12 4 2.468 368.423
16 4 2 1.580 34.244
11,751.254

MAIN BAR BS2


DIA
NO OF BAR QTY WT/M WT(KG)
MM
32 40 2 6.318 2855.772
32 40 2 6.318 2855.772
32 28 2 6.318 1999.041
20 16 1 2.468 199.414
20 16 1 2.468 199.414
20 16 3 2.468 598.243
20 16 2 2.468 398.829
20 14 6 2.468 1046.926
20 16 4 2.468 797.658
20 16 7 2.468 1395.901
20 16 1 2.468 199.414
20 16 1 2.468 199.414
20 16 2 2.468 398.829
20 14 7 2.468 1221.413
16 12 9 1.580 827.353
20 12 2 2.468 299.122
16 12 1.580
20 16 4 2.468 797.658
20 10 1 2.468 124.634
20 20 1 2.468 249.268
20 12 4 2.468 598.243
16 4 2 1.580 61.285
17,323.603

F SHEET COLUMNS (stirupps) BS2


DIA
NO OF BAR QTY WT/M WT(KG)
MM
8 28 2 0.395 359.783
8 28 2 0.395 268.013
8 28 2 0.395 0.000
8 28 1 0.395 0.000
8 28 1 0.395 0.000
8 28 3 0.395 0.000
8 28 2 0.395 0.000
8 28 6 0.395 0.000
8 28 4 0.395 0.000
8 28 7 0.395 0.000
8 28 1 0.395 0.000
8 28 1 0.395 0.000
8 28 2 0.395 0.000
8 28 7 0.395 0.000
8 28 9 0.395 0.000
8 28 2 0.395 0.000
8 28 0.395 0.000
8 28 4 0.395 0.000
8 28 1 0.395 0.000
8 28 1 0.395 0.000
8 28 4 0.395 0.000
8 28 2 0.395 8.845
636.641

MAIN BAR BS1


DIA
NO OF BAR QTY WT/M WT(KG)
MM
32 40 4 6.318 3993.027
32 40 16 6.318 15972.106
32 28 1 6.318 698.780
20 16 4 2.468 623.910
20 16 15 2.468 2339.664
20 16 2.468 0.000
20 16 2 2.468 78.976
20 14 2 2.468 407.714
20 16 5 2.468 1164.896
20 16 6 2.468 1397.875
20 16 9 2.468 2096.813
20 16 8 2.468 1863.834
20 16 4 2.468 931.917
20 14 2 2.468 407.714
16 12 35 1.580 3781.371
20 12 2.468 0.000
16 12 1.580
20 16 2.468 0.000
20 10 2.468 0.000
20 20 1 2.468 291.224
20 12 4 2.468 698.938
16 4 2 1.580 72.026
36,820.783

F SHEET COLUMNS (stirupps) BS2


DIA
NO OF BAR QTY WT/M WT(KG)
MM
8 1 2 0.395 12.849
8 25 2 0.395 242.488
8 25 2 0.395 0.000
8 25 1 0.395 0.000
8 25 1 0.395 0.000
8 25 3 0.395 0.000
8 1 2 0.395 0.000
8 34 6 0.395 0.000
8 34 4 0.395 0.000
8 34 7 0.395 0.000
8 34 1 0.395 0.000
8 34 1 0.395 0.000
8 34 2 0.395 0.000
8 34 7 0.395 0.000
8 34 9 0.395 0.000
8 34 2 0.395 0.000
8 34 0.395 0.000
8 34 4 0.395 0.000
8 34 1 0.395 0.000
8 34 1 0.395 0.000
8 34 4 0.395 0.000
8 34 2 0.395 10.635
265.973
Basement -01- Retaining wall steel

No. Length of
LEVELS DIS(M) one 50*DIA F.Length(M) QTY
over lap BAR(M)

vertical bar 0.00 213.89 3.83 7.66 1713

1.1 25.63 4.93 9.86 207

horizontal bar 297.9 24 297.9 0.6 312.20 18

25.63 1 25.99 0.6 26.67 7

Total(kg)

STAIR CASE -12- STEEL QUANTITIES


BAR STAIR
DISCRIPTION SHAPE LENGTH CASE SPACE QTY DIA(MM)
MARK WIGTH

Level (-7.4 to -5.924)

3.263 1.2 0.2 7 10

2.908 1.2 0.165 8 16

2.147 1.2 0.165 8 16

1.8 1.2 0.2 7 10

0.929 1.2 0.2 35 10

Landing area 1.15 0.2 12 12

flight area 1.15 0.2 22 10


Steps 1.15 5 10

Level (-5.924 to -5.756)

2.866 1.3 0.2 8 12

1.936 1.3 0.2 8 12

1.799 1.3 0.2 8 12

1.679 1.3 0.2 8 12

2.147 1.3 0.2 8 12

Landing-1 area 1.5 0.2 8 10

1.5 0.2 8 16

flight area 1.5 0.2 2 10

Landing-2 area 1.5 0.2 8 10

1.5 0.2 8 16

Total

Top Mesh(KG)=
Dim(M)
Direction Lbar(M)= No.OverLap 50XDia Final Lbar(M)= No.Qty
L(M)= B(M)=
21.55 2.90 21.90 2 0.48 22.78 16
17.45 2.95 17.80 1 0.48 18.51 16
8.90 3.75 9.25 0.48 9.25 20
7.20 2.30 7.55 0.48 7.55 13

5.85 8.50 6.20 0.48 6.20 44


11.90 7.20 12.25 1 0.48 12.74 37
9.60 1.75 9.95 0.48 9.95 10
2.90 4.10 3.25 0 0.48 3.38 22

3.80 2.40 3.89 0 0.40 4.02 13


2.40 3.80 2.49 0 0.40 2.57 20
6.65 6.00 6.86 0.48 6.86 41
6.00 6.65 6.21 0.48 6.21 45
6.90 2.90 7.11 0.48 7.11 20
2.90 6.90 3.11 0 0.48 3.23 47

Machine room shear wall- BAR-A


SHEAR BAR LENGTH OF BAR TOTAL.
SHEAR 45*DIA BAR NO-OF BAR QTY
WALL NAME WALL LENGTH LENGTH
W2 A 3.85 3.85 3.85 20 2
W2 A 1.75 3.85 3.85 9 4
W2 A 1.55 3.85 3.85 8 2
W2 A 1.1 3.85 3.85 6 2
W5 2.4 3.85 3.85 13 4

TOTAL

Room Room
Name Numbe Perameter Height Thk(MM) Window
r 42 3.85 400 1.8 2.1 6
office-2 44.25 3.65 400 1.8 2.1 6
Top Mesh(KG)= raft
Dim(M)
Direction Lbar(M)= No.OverLap 50XDia Final Lbar(M)= No.Qty
L(M)= DIS.L(M)=
X direction 30.00 20.00 32.40 2 1.00 34.40 134
y direction 20.00 30.00 22.40 1 1.00 23.40 201

X direction 30.00 20.00 32.40 2 1.00 34.40 134


y direction 20.00 30.00 22.40 1 1.00 23.40 201

8.454167

Top Mesh(KG)= raft


Dim(M)
Direction Lbar(M)= No.OverLap 50XDia Final Lbar(M)= No.Qty
L(M)= DIS.L(M)=
X direction 107.04 19.00 109.14 9 1.00 118.14 128
X direction 99.35 28.22 101.45 8 1.00 109.45 189

y direction 47.25 93.35 49.35 4 1.00 53.35 623


y direction 33.13 12.00 35.23 2 1.00 37.23 81
y direction 9.50 3.28 11.60 1.00 11.60 23

X direction 107.04 19.00 109.14 9 1.00 118.14 128


X direction 99.35 28.22 101.45 8 1.00 109.45 189

y direction 47.25 93.35 49.35 4 1.00 53.35 623


y direction 33.13 12.00 35.23 2 1.00 37.23 81
y direction 9.50 3.28 11.60 1.00 11.60 23

elevator pit 11.50 12.20 78


5.00 18.75 34
sum pit 4.50 10.60 31
4.50 10.60 31
sum pit 4.50 10.60 31
4.50 10.60 31

5833 57.58 335864.14


362733.2712
ng wall steel

SPACE (M) DIA(MM) Weight T.Weight (kg)

0.125 16 1.5795 20,725.80

0.125 16 1.5795 3,223.83

0.2 12 0.888 9,985.64

0.2 12 0.888 331.76

34,267.03

ES
W/M T.WEIGHT

0.6170 14.093

1.5795 36.746

1.5795 27.130

0.6170 7.774

0.6170 20.062

0.8885 12.261

0.6170 15.610
0.6170 3.548

0.8885 20.371

0.8885 13.761

0.8885 12.787

0.8885 11.934

0.8885 15.261

0.6170 7.404

1.5795 18.954

0.6170 1.851

0.6170 7.404

1.5795 18.954

265.904

Space
Dia(MM) W/M W(KG)
(M)
12 0.20 0.888 313.66
12 0.20 0.888 259.05
12 0.20 0.888 162.31
12 0.20 0.888 83.85
0.00
12 0.20 0.888 239.62
12 0.20 0.888 418.81
12 0.20 0.888 86.19
12 0.20 0.888 64.57
0.00
10 0.20 0.617 32.24
10 0.20 0.617 31.75
12 0.15 0.888 249.89
12 0.15 0.888 250.12
12 0.15 0.888 128.45
12 0.15 0.888 135.06

Top Mesh(KG)= 2,455.59

wall- BAR-A
T.WEIGHT(
SPACE(M) DIA(MM) WEIGHT
kg)

0.20 16 1.5795 241.42


0.20 16 1.5795 227.44
0.20 16 1.5795 101.56
0.20 16 1.5795 74.19
0.20 14 1.2093 234.66

879.26

dow Door Area


22.68 0 139.02
22.68 0 138.83
16,700,000.00

Space
Dia(MM) W/M W(KG)
(M)
20 0.15 2.468 11,404.79
1 mesh
20 0.15 2.468 11,607.99

20 0.15 2.468 11,404.79


1 mesh
20 0.15 2.468 11,607.99

Top Mesh(KG)= 46,025.57

Space
Dia(MM) W/M W(KG)
(M)
20 0.15 2.468 37,223.71
20 0.15 2.468 51,089.19

1 mesh
20 0.15 2.468 82,072.93
20 0.15 2.468 7,441.58
20 0.15 2.468 654.65

20 0.15 2.468 37,223.71


20 0.15 2.468 51,089.19

20 0.15 2.468 82,072.93


20 0.15 2.468 7,441.58
20 0.15 2.468 654.65

20 0.15 2.468 2,338.51


20 0.15 2.468 1,588.78
20 0.15 2.468 810.98
20 0.15 2.468 810.98
20 0.15 2.468 810.98
20 0.15 2.468 810.98

Top Mesh(KG)= 364,135.32


Construction of Residential - Commecial Building (2B+G+M+7) - P#53 C
Quantities- the Summary

REIN FORCED CONCRETE QTY UNIT(M3)

SubStructure
Foundation
Raft+Elevator+Sumpit+Firepit 5959.37 (M3)

TOTAL 5,959.37 (M3)

REIN FORCED CONCRETE QTY UNIT(M3)

Basement -2
Retaining Wall 303.90 (M3)

Column 162.05 (M3)

Shear Wall 133.31 (M3)

(Slab+Ramp+landing) Beams 37.85 (M3)

Slab 1,553.24 (M3)

Ramp(1 & 2) 38.16 (M3)

Stair case 33.43 (M3)

TOTAL 2,261.94 (M3)

Construction of Residential - Commecial Building (2B+G+M+7) - P53


Quantities- the Summary

REIN FORCED CONCRETE QTY UNIT

SubStructure
Basement -1
Retaining Wall 327.53 (M3)

Column 209.36 (M3)


Shear Wall 150.00 (M3)

Beam 67.61 (M3)

Slab 1,238.76 (M3)

Ramp(1 & 2) 39.13 (M3)

Ramp(3 & 4) 51.93 (M3)

Stair case 38.08 (M3)

TOTAL 2,122.40 (M3)

Super Structure
Ground Floor
Column 130.17 (M3)

Shear Wall 120.47 (M3)

Beam 42.94 (M3)

Stair case 33.71 (M3)

Ceiling Slab 583.85 (M3)

TOTAL 911.14 (M3)

Mezz Floor
Column 129.37 (M3)

Shear Wall 123.71 (M3)

Beam 51.49 (M3)

Stair case 19.86 (M3)

Ceiling Slab 667.60 (M3)

TOTAL 992.03 (M3)

First Floor
Column 113.95 (M3)

Shear Wall 117.69 (M3)

Beam 49.14 (M3)

Stair case 19.87 (M3)


Ceiling Slab 662.98 (M3)

TOTAL 963.63 (M3)

2nd Floor
Column 113.95 (M3)

Shear Wall 117.69 (M3)

Beam 46.63 (M3)

Stair case 19.87 (M3)

Ceiling Slab 672.93 (M3)

TOTAL 971.07 (M3)

3rd Floor
Column 97.65 (M3)

Shear Wall 117.69 (M3)

Beam 49.26 (M3)

Stair case 19.87 (M3)

Ceiling Slab 662.98 (M3)

TOTAL 947.45 (M3)

4th Floor
Column 97.65 (M3)

Shear Wall 117.69 (M3)

Beam 46.94 (M3)

Stair case 19.87 (M3)

Ceiling Slab 672.93 (M3)

TOTAL 955.08 (M3)

5th Floor
Column 81.55 (M3)

Shear Wall 117.69 (M3)

Beam 49.45 (M3)


Stair case 19.87 (M3)

Ceiling Slab 662.98 (M3)

TOTAL 931.54 (M3)

6th Floor
Column 81.55 (M3)

Shear Wall 117.69 (M3)

Beam 49.45 (M3)

Stair case 19.87 (M3)

Ceiling Slab 662.98 (M3)

TOTAL 931.54 (M3)

7th Floor
Column 69.22 (M3)

Shear Wall 117.69 (M3)

Beam 49.45 (M3)

Stair case 15.29 (M3)

Ceiling Slab 679.47 (M3)

TOTAL 931.12 (M3)

Total Super Structure 8,534.60 (M3)

Total 10,657.00 (M3)


+7) - P#53 Concrete

TOTAL

5959.37

5,959.37

TOTAL

303.90

162.05

133.31

37.85

1,553.24

38.16

33.43 0.617 12
2,261.94

461

7.4

31 .

- P53 Concrete

TOTAL(M3)

327.53

209.36
150.00

67.61

1,238.76

39.13

51.93

38.08

2,122.40

130.17

120.47

42.94

33.71

583.85

911.14

129.37

123.71

51.49

19.86

667.60

992.03

113.95

117.69

49.14

19.87
662.98

963.63

113.95

117.69

46.63

19.87

672.93

971.07

97.65

117.69

49.26

19.87

662.98

947.45

97.65

117.69

46.94

19.87

672.93

955.08

81.55

117.69

49.45
19.87

662.98

931.54

81.55

117.69

49.45

19.87

662.98

931.54

69.22

117.69

95.63

15.29

648.75

946.58

8,550.06

10,672.46
QUANTITY
ITEM BOQ-REF# DESCRIPTION UNIT
OMISSION
1 Changing Kitchen door from 80cm to 90cm
1.1 New fire rated 90cm door no.
1.2 Breaking block and replacing * no.
1.3 BQ/02/14-F original fire rated door 80 cm no. 60
1.4 BQ/02/27-G internal plaster m2 13.2
1.5 BQ/02/27-H internal paint m2 13.2
BQ/02/12-C Block Deduction m2 13.2
1.6 BQ/02/27-E Wall Ceramic m3 13.2
2 Changing Main door from 100 to 110
2.1 New fire rated 110 cm door no.
2.2 Breaking block and replacing * no.
2.3 BQ/02/14-B original fire rated door 100 cm no. 60
2.4 BQ/02/27-G internal plaster m2 26.4
BQ/02/12-C Block Deduction m2 13.2
2.5 BQ/02/27-H internal paint m2 26.4
3 Closing Extra Kitchen door
3.1 breaking block for connection ** no.
3.2 BQ/02/12-C extra block m2
3.3 BQ/02/27-G extra plaster m2
3.4 BQ/02/27-H extra paint m2
3.5 BQ/02/27-E extra ceramic m2
3.6 BQ/02/14-F fire rated wood door 80 cm no. 49
4 Door of maid toilet 80 cm
4.1 breaking block for connection ** no.
4.2 BQ/02/19-L additional lintel 200x300 m
4.3 BQ/02/12-C extra block ( Jab & above ) m2
4.4 BQ/02/27-G extra plaster m2
4.5 BQ/02/27-H extra paint m2
4.6 BQ/02/14-C wood door 80 cm no.
5 Maid toilet finish
5.1 BQ/02/27-E ceramic for walls m2
5.2 Water proofing m2
5.3 BQ/04/1-C Water Closet WC1 no.
5.4 BQ/04/1-E Hand spray hose HS no.
5.5 BQ/04/1-B Wash Basin LAV1 no.
5.6 Shower Mixer no.
5.8 BQ/02/27-G internal plaster m2 1442
5.9 BQ/02/27-H internal paint m2 1442
Bill of Omission
Bill of Addition
Total Value of Variation
QUANTITY RATE OMISSION ADDITION
ADDITION QR QR QR
- -
60 5,490 - 329,400
19 885 - 16,815
4,300 258,000 -
48 634 -
24 317 -
120 1,584 -
130 1,716 -
- -
60 6,180 - 370,800
19 885 - 16,815
4,850 291,000 -
48 1,267 -
120 1,584 -
24 634 -
- -
21 345 - 7,245
90 120 - 10,800
90 48 - 4,320
90 24 - 2,160
90 130 - 11,700
4,300 210,700 -
- -
25 345 - 8,625
70 45 - 3,150
125 120 - 15,000
125 48 - 6,000
125 24 - 3,000
58 1,320 - 76,560
- -
1240 130 - 161,200
242 85 - 20,570
58 1,200 - 69,600
58 270 - 15,660
58 1,000 - 58,000
58 825 - 47,850
48 69,216 -
24 34,608 -
871,259
1,255,270
384,011
area 5079,99990590
perimeter 305828.09

5080 M2
305.82 M
EXCAVATION AND EARTH WORK

Sr.no description unit length

1 site clearance m2

2 top soil removal 150 mm thk. m2

3 excavation m3

4 disposal m3

ex+top soil (45,212+762)

5 Anti-termite (ver.area +hor.area) m2 305.82

6 backfilling m3

EXCAVATION AND EARTH WORK

Sr.no description unit length

1 site clearance m2

2 top soil removal 150 mm thk. m2

3 excavation m3

disposal of excavated materials


4 m3
(excavation qty+ top soil qty)

5 Anti-termite

(vertical.area qty 78.26

horizontal.area qty

6 backfilling m3

7 filling sand above natural ground level m3


width height no.of item area qty final qty

5080 5080

5080 5080

8.9 5080 45,212

45,974 762
9.05 5080 7,847.67

9.05 292 2642.6

width height area qty final qty

361.93 361.93
361,938,146.48
361.93 361.93

1.35 361.93 489

543

479.32

1.5 117.39

361.93

0
dowel bar r
rt.wall.length space 50*Dia(M) LENGTH

298 0.125 1 1.2


298 0.125 0.8 1.2

Total

dowel bar shea


length OF WALL space 50*Dia(M) LENGTH

A 8.9 0.12 1 1.2


W1
C 1.25 1.2
A 8.9 0.12 1 1.2
W1
C 1.25 1.2

CORE 1 16.12 0.15 0.8 1.2


C 1 1.2
Total

RAFT
MAIN MESH
ADDI
DOWEL
RETAINING WALL
COLUMN
SHEAR WALL/CORE WALL
CHAIRS

shear wall,core
D.LENGTH length OF WALL space 50*Dia(M) LENGTH

A 8.9 0.12 1 4.05


B 4.05 0.2 19.8
W1
C 1.25 4.05
STRU
A 8.9 0.12 1 4.05
B 4.05 0.2 19.8
W1
C 1.25 4.05
STRU
CORE 1 A 14.52 0.15 0.8 4.05
B 4.05 0.2 35.64

C 1 4.05
Total
dowel bar retaining wall
DIA
T.LENGTH NO OF BAR QTY WT/M WT(KG)
MM
3.2 20 2385 1 2.468 18,835.78
2.3 16 2385 1 1.580 8,664.46

27,500.233

dowel bar shear wall,core wall


DIA
T.LENGTH NO OF BAR QTY WT/M WT(KG)
MM
3.2 20 75 2 2.468 1,187.27
3.7 25 5 2 3.856 142.68
3.2 20 75 2 2.468 1,187.27
3.7 25 5 2 3.856 142.68

2.8 16 108 2 1.580 959.42


3.2 20 5 4 2.468 157.95
3,777.281

shear wall,core wall BASEMENT 2


DIA
T.LENGTH NO OF BAR QTY WT/M WT(KG)
MM
5.05 20 76.0 2 2.468 1,894.44
19.8 12 22.0 1 0.888 387.02
5.3 25 5 2 3.856 204.38
1.3 8 836 1 0.395 429.16
5.05 20 76.0 2 2.468 1,894.44
19.8 12 22.0 1 0.888 387.02
5.3 25 5 2 3.856 204.38
1.8 8 836 1 0.395 594.22
4.85 16 98.0 2 1.580 1,501.49
35.64 12 22.0 1 0.888 696.64

5.05 20 5 4 2.468 249.27


8,442.450
Sr.no description unit length width height no.of item
concrete work
plain concrete
100 mm blinding m2
50 mm screed m2
reinforced concrete

raft foundation m3 1.2


add
elev.pit 1.2
sum.pit-1 1.4
sum.pit-2 1.4
sum.pit-3 1.4
dedt
elev.pit 1.2
sum.pit-1 1.4
sum.pit-2 1.4
sum.pit-3 1.4

col concrete bs2 m3


c1 2.1 0.6 3.7 2
c2 1 1 3.7 6
c3 3.7 7
c4 3.7 4
c5 3.7 9
c6 3.7 4
c7 3.7 2
c8 3.7 1
c9 3.7 1
c10 3.7 3
c11 3.7 5

retaining wall con m3 298 0.3 3.7

column concrete m3
c1 2.1 0.6 3.7 10
c2 1 1 3.7 2
c3 1.5 0.7 3.7 4
c4 3.7 7
c5 3.7
c6 3.7
c7 3.7
c8 3.7
c9 3.7
c10 3.7

wall
w1 m3 8.9 0.5 3.7 2

w2 9.8 0.3 3.7 1


dedt 1.2 0.3 2.2 1

add fw

slab con m3
350mm 0.35
150 mm 0.15

134,836,000.00

ceramic skirting type 3


1st floor
detd
room name perimeter qty (M)
L(M) NOS
0.9 4
master bedroom 72 66.8
0.8 2
Formwork
area qty final qty m2

4808 4808
4778 4778

4778 5733.6

72.5 87
30.5 42.7 60,100,000.00
36.18 50.652
30.5 42.7
5956.652
17 20.4
2.25 3.15
4.2 5.88
2.25 3.15 block shuttering
32.58
5924.072 357.6 m2
9.324 39.96
22.2 88.8
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
31.524 31.524 128.76
330.78 330.78 2205.2

46.62 199.8
7.4 29.6
15.54 65.12
0 0
0 0
0 0
0 0
0 0
0 0
0 0
69.56 69.56 294.52

32.93 139.12

10.878 74.74
0.792 5.28
10.086 69.46
1.68
71.14
43.016 210.26

4426.62 1549.317 4514.02


87.4 13.11 104.3
1562.427 39.522
4,657.84

5,079,999,905.90
perimeter 305828.09
Sr.no description unit length width height

site cleance m2
150mm top soil removal m2
excavation m3 9.05
disposal m3
anti-termite m2
backfill m3
excavation area- building area
dewatering
Formwork
no.of item area qty final qty
m2

5080 5080
5080 5080 5080
5080 45,974 0.15
46,736 762
7848 305.8
2,767.49
3,495

4778
9.05
43240.9

4,807,963,002.64

5,079,999,905.90
perimeter 305828.09

###
meter 305828.09
col concrete bs2
description unit length width height no.of item qty
c1 m3 2.1 0.6 3.7 2 9.324
c2 m3 1 1 3.7 6 22.2
c3 m3 1.5 0.7 3.7 7 27.195
c4 m3 3.7 4 0
c5 m3 3.7 9 0
c6 m3 3.7 4 0
c7 m3 3.7 2 0
c8 m3 3.7 1 0
c9 m3 3.7 1 0
c10 m3 3.7 3 0
c11 m3 3.7 5 0
total 58.719

Retaining wall concrete


basement 2 m3 298 0.3 3.7 330.78
basement 1 m3 248 0.3 3.25 241.8
basement 1 m3 22 0.3 3.95 26.07
basement 1 m3 27.92 0.3 4.15 34.7604
633.4104

col concrete bs1


description unit length width height no.of item qty
c1 m3 2.1 0.6 3.25 2 8.19
c2 m3 1 1 3.25 6 19.5
c3 m3 1.5 0.7 3.25 7 23.8875
c4 m3 4.55 4 0
c5 m3 4.55 9 0
c6 m3 4.55 4 0
c7 m3 4.55 2 0
c8 m3 4.55 1 0
c9 m3 4.55 1 0
c10 m3 4.55 3 0
c11 m3 4.55 5 0
total 51.5775

col concrete gr
description unit length width height no.of item qty
c1 m3 2 0.5 3.85 2 7.7
c2 m3 1 0.9 3.85 6 20.79
c3 m3 1.5 0.6 3.85 7 24.255
c4 m3 3.85 4 0
c5 m3 3.85 9 0
c6 m3 3.85 4 0
c7 m3 3.85 2 0
c8 m3 3.85 1 0
c9 m3 3.85 1 0
c10 m3 3.85 3 0
c11 m3 3.85 5 0
total 52.745

col concrete mezz


description unit length width height no.of item qty
c1 m3 2 0.5 3.85 2 7.7
c2 m3 1 0.9 3.85 6 20.79
c3 m3 1.5 0.6 3.85 7 24.255
c4 m3 3.85 4 0
c5 m3 3.85 9 0
c6 m3 3.85 4 0
c7 m3 3.85 2 0
c8 m3 3.85 1 0
c9 m3 3.85 1 0
c10 m3 3.85 3 0
c11 m3 3.85 5 0
total 52.745
Formwork m2
39.96
88.8
113.96
0
0
0
0
0
0
0
0
242.72 1093.35 1102.6

2205.2
1612
173.8
231.736

Formwork m2
35.1
78
100.1
0
0
0
0
0
0
0
0
213.2

Formwork m2
38.5
87.78
113.19
0
0
0
0
0
0
0
0
239.47

Formwork m2
38.5
87.78
113.19
0
0
0
0
0
0
0
0
239.47
shear wall core wall concrete bs2
wall type unit length width height no.of item qty
w1 m3 8.9 0.5 3.7 2 32.93
w2 m3 7.45 0.3 3.7 2 16.539
w2 m3 7.5 0.3 3.7 1 8.325
w2 m3 9.8 0.3 3.7 1 10.878
w4 m3 6 0.2 3.7 2 8.88
w5 m3 3.7 0
core1 m3 6 0.2 3.7 2 8.88
m3 1.66 0.2 3.7 1 1.2284
dedt-openings m3 1 0.2 2.3 1 0.46
add-opening

total 87.2004

shear wall core wall concrete bs1


wall type unit length width height no.of item qty
w1 m3 8.9 0.5 4.55 2 40.495
w2 m3 7.45 0.3 4.55 2 20.3385
w2 m3 7.5 0.3 4.55 1 10.2375
w2 m3 9.8 0.3 4.55 1 13.377
w4 m3 6 0.2 4.55 2 10.92
w5 m3 4.55 0
core1 m3 6 0.2 4.55 2 10.92
m3 1.66 0.2 4.55 1 1.5106
dedt-openings m3 1 0.2 2.3 3 1.38
add-opening

total 106.4186

description unit length width height no.of item area


concrete work
plain concrete
100 mm blinding m2 4808
dedt area
ele.pit - plan area 94.5
sumpit-1 - plan area 44.9
sumpit-2 - plan area 44.9

sub-total 4,623.70
add
ele.pit - plan area 54.24
slope area 36.6 1.67 61.122
sumpit-1 - plan area 18.5
slope area 22.65 1.98 44.847
sumpit-2 - plan area 18.5
slope area 22.65 1.98 44.847

242.06
final total 4,865.76

screed concrete
50mm screed m2 4778.13
dedt area
ele.pit - plan area 94.5
sumpit-1 - plan area 44.9
sumpit-2 - plan area 44.9
sumpit-3 - plan area 52.56
sub-total 4,541.27
add
ele.pit - plan area 54.24
slope area 36.6 1.67 61.122
sumpit-1 - plan area 18.5
slope area 22.65 1.98 44.847
sumpit-2 - plan area 18.5
slope area 22.65 1.98 44.847
sumpit-3 - plan area 23.52
slope area 24.2 1.98 47.916
313.49
final total 4,854.76
description unit length width height no.of item area
raft foundation m3 1.2 4778.13

add

elev.pit 1.2 74.35

sum.pit-1 1.4 31.69

sum.pit-2 1.4 36.18

sum.pit-3 1.4 31.69

dedt

elev.pit 1.2 17

sum.pit-1 1.4 2.25

sum.pit-2 1.4 4.2

sum.pit-3 1.4 2.25

col concrete bs2 m3

col concrete bs2


description unit length width height no.of item qty
c2 m3 1 1 3.7 2 7.4
c3 m3 1.5 0.7 3.7 2 7.77
c5 m3 1.8 0.5 3.7 4 13.32
c6 m3 1.6 0.5 3.7 0
c7 m3 1.4 0.5 3.7 5 12.95
c8 m3 1.2 0.5 3.7 4 8.88
c9 m3 1.2 0.5 3.7 4 8.88
c10 m3 0.8 0.8 3.7 0
c12 m3 1 0.5 3.7 8 14.8
c13 m3 0.8 0.4 3.7 5 5.92
m3 3.7 0
total 79.92
col concrete bs1
description unit length width height no.of item qty
S.S.L 0.00
C17 m3 0.8 0.2 3.25 4 2.08
C18 m3 0.6 0.2 3.25 5 1.95
C20 m3 0.5 0.3 3.25 4 1.95
C21 m3 0.8 0.5 3.25 12 15.6
S.S.L + 0.65 0
C19 m3 0.95 0.2 4.15 1 0.7885
S.S.L + 0.15 0
C18 m3 0.6 0.2 3.65 8 3.504
C21 m3 0.8 0.5 3.65 2 2.92
S.S.L + 1.25 0
C1 m3 2.1 0.6 4.55 2 11.466
C2 m3 1 1 4.55 2 9.1
C3 1.5 0.7 4.55 2 9.555
C5 1.8 0.5 4.55 3 12.285
C6 1.6 0.5 4.55 2 7.28
C7 1.4 0.5 4.55 5 15.925
C8 1.2 0.5 4.55 4 10.92
C9 1.2 0.5 4.55 7 19.11
C10 0.8 0.8 4.55 2 5.824
C11 0.8 0.6 4.55 2 4.368
C12 1 0.5 4.55 8 18.2
C13 0.8 0.4 4.55 6 8.736
C14 1.4 0.3 4.55 2 3.822
C16 1.2 0.5 4.55 4 10.92
m3 4.55 0
total 176.3035

col concrete GROUND FLOOR


description unit length width height no.of item qty
c2 m3 3.85 0
c3 m3 3.85 0
c5 m3 3.85 0
c6 m3 3.85 0
c7 m3 3.85 0
c8 m3 3.85 0
c9 m3 3.85 0
c10 m3 3.85 0
c12 m3 3.85 0
c13 m3 3.85 0
m3 3.85 0
total 0
Formwork
m2
139.12
114.7
57.72
74.74
88.8

59.2
53.761
4.6
0.92

584.361

Formwork
m2
171.08
141.05
70.98
91.91
109.2

72.8
66.1115
13.8
2.76

712.0915

qty final qty


qty final qty Formwork m2
5733.756

89.22

44.366 ###
50.652

44.366

5962.36

20.4

3.15

5.88

3.15 block shuttering


32.58

5929.78 357.6 m2

Formwork
m2
29.6
32.56
68.08
0
70.3
50.32
50.32
0
88.8
44.4
0
434.38
Formwork
m2

26
26
20.8
101.4
0
9.545
0
46.72
18.98
0
49.14
36.4
40.04
62.79
38.22
86.45
61.88
108.29
29.12
25.48
109.2
65.52
30.94
61.88
0
1054.795

Formwork
m2
0
0
0
0
0
0
0
0
0
0
0
0
100MM BLINDING CONCRETE
CONCRETE FORMWORK
FOOTING TYPE length width height NO'S
QTY (M2) QTY (M2)
F1 1.6 1.2 0.1 2 3.84 1.12
F2 1.8 1.4 0.1 9 22.68 5.76
F3 2 1.6 0.1 9 28.8 6.48
F4 2.2 1.8 0.1 2 7.92 1.6
F5 1.4 1.4 0.1 1 1.96 0.56
CF1 1.8 1.8 0.1 1 3.24 0.72
0 0
total 68.44 16.24

50MM SCREED CONCRETE


CONCRETE FORMWORK
FOOTING TYPE length width height NO'S
QTY (M2) QTY (M2)
F1 1.4 1 0.05 2 2.8 0.48
F2 1.6 1.2 0.05 9 17.28 2.52
F3 1.8 1.4 0.05 9 22.68 2.88
F4 2 1.6 0.05 2 6.4 0.72
F5 1.2 1.2 0.05 1 1.44 0.24
CF1 1.6 1.6 0.05 1 2.56 0.32
0 0
total 53.16 7.16

FOOTING CONCRETE
CONCRETE FORMWORK
FOOTING TYPE length width height NO'S QTY (M3) QTY (M2)
F1 1.4 1 0.35 2 0.98 3.36
F2 1.6 1.2 0.4 9 6.912 20.16
F3 1.8 1.4 0.4 9 9.072 23.04
F4 2 1.6 0.45 2 2.88 6.48
F5 1.2 1.2 0.35 1 0.504 1.68
CF1 1.6 1.6 0.4 1 1.024 2.56
0 0
total 21.372 57.28

NECK COLUMN CONCRETE


CONCRETE FORMWORK
COLUMN TYPE length width height NO'S QTY (M3) QTY (M2)
C1 0.2 0.3 1.25 2 0.15 2.5
C2 0.2 0.4 1.2 9 0.864 12.96
C3 0.2 0.5 1.2 9 1.08 15.12
C4 0.2 0.7 1.15 2 0.322 4.14
C5 0.4 0.6 1.25 1 0.3 2.5
C6 0.34 1.2 1 0.408 3.6

total 3.124 40.82

G/F COLUMN CONCRETE


CONCRETE FORMWORK
COLUMN TYPE length width height NO'S
QTY (M3) QTY (M2)
0.15
C2 0.2 0.4 3.75 4 1.2 18
C3 0.2 0.5 3.75 3 1.125 15.75
0.16
C2 0.2 0.4 3.74 4 1.1968 17.952
C3 0.2 0.5 3.74 1 0.374 5.236
0.3
C1 0.2 0.3 3.6 2 0.432 7.2
C2 0.2 0.4 3.6 1 0.288 4.32
C3 0.2 0.5 3.6 5 1.8 25.2
C4 0.2 0.7 3.6 2 1.008 12.96
0.12
C5 0.4 0.6 3.78 1 0.9072 7.56
C6 0.34 3.78 1 1.2852 11.34

total 9.6162 125.518

G/F COLUMN CONCRETE


CONCRETE FORMWORK
COLUMN TYPE length width height NO'S
QTY (M3) QTY (M2)
0.15
C2 0.2 0.4 3.75 4 1.2 18
C3 0.2 0.5 3.75 3 1.125 15.75
0.16
C2 0.2 0.4 3.74 4 1.1968 17.952
C3 0.2 0.5 3.74 1 0.374 5.236
0.3
C1 0.2 0.3 3.6 2 0.432 7.2
C2 0.2 0.4 3.6 1 0.288 4.32
C3 0.2 0.5 3.6 5 1.8 25.2
C4 0.2 0.7 3.6 2 1.008 12.96
0.12
C5 0.4 0.6 3.78 1 0.9072 7.56
C6 0.34 3.78 1 1.2852 11.34

total 9.6162 125.518


340,000.00
5,079,945,315.72
305,822.79
EXCAVATION AND EARTH WORK

Sr.no description unit length width height

1 site clearance m2

2 top soil removal 150 mm thk m2

3 excavation m3 8.9

add elevator pit 1.2

sum pit 1 1.4

sumpit2 1.4

4 disposal (excavation qty +top so m3

5 Anti-termite (ver.area +hor.ar m2 305.82 9.05

6 backfilling m3 9.05

description unit length width height no.of item


concrete work
plain concrete
100 mm blinding m2
dedt area
ele.pit - plan area
sumpit-1 - plan area
sumpit-2 - plan area

sub-total
add
ele.pit - plan area
slope area 36.2 1.69
sumpit-1 - plan area
slope area 21 1.98
sumpit-2 - plan area
slope area 21 1.98

final total
description unit length width height no.of item
concrete work
plain concrete
50 mm SCREED m2
dedt area
ele.pit - plan area
sumpit-1 - plan area
sumpit-2 - plan area

sub-total
add
ele.pit - plan area
slope area 36.2 1.69
sumpit-1 - plan area
slope area 21 1.98
sumpit-2 - plan area
slope area 21 1.98

final total

description unit length width height no.of item


raft foundation m3 1.2
add
elev.pit 1.2
sum.pit-1 1.4
sum.pit-2 1.4

dedt
elev.pit 1.2
sum.pit-1 1.4
sum.pit-2 1.4

col concrete bs2 m3


area qty final qty

5080 5080

5080 5080

5080 45212 45,451

94.5 113.4

44.89 62.846

44.89 62.846 301,861,973.69


46,213.09 5,079,945,315.72

5080 7,847.67

301.86 2,731.83

area qty final qty

4808

94.5
44.89
44.89

4,623.72

51.06
61.178
15.21
41.58
15.21
41.58

225.82
4,849.54
area qty final qty

4778

94.5
44.89
44.89

4,593.72

51.06
61.178
15.21
41.58
15.21
41.58

225.82
4,819.54

Formwo
area qty final qty rk m2
4778 5733.6

72.28 86.736
30.05 42.07
30.05 42.07

5904.476
17 20.4
2.25 3.15
2.25 3.15
block shuttering
26.7
5877.776 357.6
ITEM NO DISCRIPTION UNIT QTY RATE (QR) AMOUNT (QR)

1 site clearance M2 5,080.00 10 50,800.00


-
2 top soil removal 150 mm thk. M2 5,080.00 15 76,200.00
-
3 excavation M3 45,451.09 35 1,590,788.22
-
4 disposal M3 46,213.09 12 554,557.10
-
5 Anti-termite M2 7,847.67 15 117,715.07
-
6 backfilling M3 2,731.83 25 68,295.83

TOTAL CARRIED TO SUMMARYY 2,458,356.21


BASEMENT 2 CEILING SLAB

BEAM DIM (M)


BAR BAR
BEAM TYPE WIDTH DEPTH SPAN.L CL1 CL2
MARK LENGTH
SIMPLE BEAM
C-LEFT 0.2 0.6 5.17 2.55 0.3 0.8
C-RIGHT 3.05
MAIN BAR D 2.68
B1 A 7.32
B 4.31
F 1.6
STIRRUPS
G 1.6
C-LEFT 0.2 0.6 1.83 2.55 0.2 0.8
C-RIGHT 3.05
MAIN BAR D 2.68
A 3.88
B1
B 1.53

F 1.6
STIRRUPS
G 1.6
NG SLAB

NO'S DIA DIS.LENGTH SPACE W/M T.WEIGHT

2 12 0.89 4.53
2 12 0.89 5.42
2 12 0.89 4.77
3 12 0.89 19.52
- -
12 8 0.2 0.395 7.80
17 8 0.2 0.395 10.44
2 12 0.89 4.53
2 12 0.89 5.42
2 12 0.89 4.77
3 14 1.21 14.08
- -

7 8 0.15 0.395 4.35

6 8 0.2 0.395 4.10


BASEMENT 2 CEILING SLAB
BEAM DIM (M)
BEAM BAR WIDTH DEPTH WIDTH DEPTH SPAN.L SPAN.L
TYPE MARK 1 1 2 2 1 2

TWO SPAN BEAM


C-LEFT 0.8 0.55 0.8 0.55 7.55 3.9
C-RIGHT
D1
D2
A1
MAIN BAR
A2
B1
B20--B22
B2
E1
E2
F
STRUP.SPAN 1
G
F
STRUP.SPAN 2
G
ENT 2 CEILING SLAB

BAR T.WEIGH
CL1 CL2 CL3 NO'S DIA SPACE W/M
LENGTH T

4.39 1.4 0.6 0.3 6 20 2.47 65.06


3.59 2 12 0.89 6.39
3.80 5 16 1.58 30.00
2 12
10.225 7 20 2.47 176.73
5.235 4 14 1.21 25.33
6.29 4 20 2.47 62.14
3.25 - -
4.42 6 20 2.47 65.43
2.89 - -
2.7 32 8 0.1 0.40 34.35
2.70 24 8 0.2 0.40 25.23
2.7 18 8 0.1 0.395 18.77

2.7 13 8 0.2 0.395 13.55


EXCAVATION AND EARTH WORK

Sr.no description unit length width height


1 site clearance m2
2 top soil removal 150 mm thk. m2
3 EXCAVATION m3
FOR FOOTING
F1 1.6 1.2 1.35
F2 1.8 1.4 1.35
F3 2 1.6 1.35
F4 2.2 1.8 1.35
F5 1.4 1.4 1.35
CF1 1.8 1.8 1.35
PLINTH BEAM
P6,P10 40 0.4 0.2
P2,P3P4,P5,P7P9 50 0.4 0.1

4 disposal (excavation qty +top soil qty) m3

5 Anti-termite (ver.area +hor.area) M2


HORIZONTAL QTY
VERTICAL QTY
EDGE AREA 70.94 0.15

FOR FOOTING
F1 1.6 1.2 1.35
F2 1.8 1.4 1.35
F3 2 1.6 1.35
F4 2.2 1.8 1.35
F5 1.4 1.4 1.35
CF1 1.8 1.8 1.35
PLINTH BEAM
P6,P10 40 0.4 0.2
P2,P3P4,P5,P7P9 50 0.4 0.1
6 backfilling m3
NO'S area qty final qty
294.96 294.96
294.96 294.96
98

2 5.184
9 30.618
9 38.88
2 10.692
1 2.646
1 4.374

3.2
2

141.84

550.84
294.96

10.641

2 15.12
9 77.76
9 87.48