The purpose of this document is to provide a description of the TotalView dashboards.

TotalView Dashboards

Maintenance Actual vs. Target Dashboard

CPI Indicator

• Availability: The percentage of time that the equipment is available for operation.

Availability = (Total Time – Scheduled Down Time – Unscheduled Down Time) * 100
________________________________________________________
Total Time

• Use of Availability: The percentage of time that the equipment is running relative
to the time it is available.

Use of Availability = (Operating Time + Delay Time) * 100


____________________________________
Operating Time + Delay Time + Standby Time

• Usage: The percentage of available time that the equipment is operating.

Usage = (Operating Time) * 100


______________________________________
Operating Time + Delay Time + Standby Time

MTBS/MTBF/MTTR

• MTBS (Mean Time Between Stops): The measure of frequency of maintenance


interruptions on production. (Stops do not include operational shutdowns such as
a shift change, lunch, or fueling.)
• Operated Time: The number of stops for scheduled and unscheduled
maintenance.

• MTBF (Mean Time Between Failures (For Trucks, Drills, and Loader
Fleets)): The measure of frequency of unscheduled maintenance production
interruptions. (Stops do not include scheduled maintenance, or operation
shutdowns such as a shift change, lunch, or fueling.)
• Operated Time: The number of stops for unscheduled maintenance.

• MTTR (Mean Time To Repair): The measure of how quickly a machine is


returned to service once a down time incident occurs. (Stops for scheduled or
unscheduled maintenance.)

1
Technical
Notes

Mean Time To Repair = Scheduled Down Time + Unscheduled Down Time


________________________________________________
Number of Stops for Scheduled and Unscheduled Maintenance
Status Hours

• Working Time: The time the equipment is running and doing productive work.
• Delay Time: The time the equipment is running but not doing productive work.
• Standby Time: The time the equipment is available for operation but not
running.
• Down Time: The time the equipment is not operating because of maintenance.

Down Time Duration Hours = Down + Unscheduled Down + Scheduled Down + Operational
Down + Maintenance Delay

Deliverability

Deliverability = (Total Time – Scheduled Down Time – Unscheduled Down Time) * 100
_______________________________________________________
Equipment Count
Status By Fleet

Displays the equipment count by fleet and status.

Status Equipment

Displays the details of equipment by fleet and status.

General Foreman and Pit Dashboard

CPI Indicator

• Usage: The percentage of available time that the equipment is operating.

Usage = (Operating Time) * 100


_____________________________________
Operating Time + Delay Time + Standby Time

• Utilization: The percentage of time that the equipment is operating.

Utilization = (Operating Time) * 100


____________________
Total Time

Status Hours

• Working Time: The time the equipment is running and doing productive work.
• Delay Time: The time the equipment is running but not doing productive work.
2
Technical
Notes

• Standby Time: The time the equipment is available for operation but not
running.
• Down Time: The time the equipment is not operating because of maintenance.

Down Time Duration Hours = Down + Unscheduled Down + Scheduled Down + Operational
Down + Maintenance Delay

Deliverability

Deliverability = (Total Time – Scheduled Down Time – Unscheduled Down Time) * 100
_______________________________________________________
Equipment Count

Tonnage By Hour

Displays the sum load tonnage group by hour, day, and month.

Status Metric

Displays the percent of distance by load and dump.

Status Equipment

Displays the percent of time by hauling and traveling.

Management Reports Dashboard

Production

Displays the sum load tonnage group by hour, day, and month.

Queue Time – Hang Time

The TotalView system computes queue and hang times from the following measured
events:
- Shovel Status Changes
- Truck Arrivals At Shovels
- Truck Departures At Shovels

Conceptually, the definition of queue and hang times are quite simple.

• Queue Time: The total time when more than one truck is at a given shovel
multiplied by the number of trucks queued.
• Hang Time: The total time zero trucks are at a given shovel.

3
Technical
Notes

Average Speed

Displays the average speed by load and dump (KM).

CPI Indicator

• Availability: The percentage of time that the equipment is available for operation.

Availability = (Total Time – Scheduled Down Time – Unscheduled Down Time) * 100
________________________________________________________
Total Time

• Use of Availability: The percentage of time that the equipment is running relative
to the time it is available.

Use of Availability = (Operating Time + Delay Time) * 100


___________________________________
Operating Time + Delay Time + Standby Time

• Usage: The percentage of available time that the equipment is operating.

Usage = (Operating Time) * 100


____________________________________
Operating Time + Delay Time + Standby Time

• Utilization: The percentage of time that the equipment is operating.

Utilization = (Operating Time) * 100


__________________________