This document provides a checklist for inspecting a deluge valve system for a coal belt and other areas every 6 months. The checklist includes items to inspect general components like main valves, pressure gauges, and instrument valves. Specific tasks involve operating drain valves to check for leaks, testing alarm bells, checking membrane operation and water discharge, and ensuring valves and piping are free of leaks. The inspection also involves cleaning surfaces, checking for corrosion, and cleaning strainers. Signatures are required from the inspection team lead, mechanical superintendent, and mechanical engineer to certify the inspection.
This document provides a checklist for inspecting a deluge valve system for a coal belt and other areas every 6 months. The checklist includes items to inspect general components like main valves, pressure gauges, and instrument valves. Specific tasks involve operating drain valves to check for leaks, testing alarm bells, checking membrane operation and water discharge, and ensuring valves and piping are free of leaks. The inspection also involves cleaning surfaces, checking for corrosion, and cleaning strainers. Signatures are required from the inspection team lead, mechanical superintendent, and mechanical engineer to certify the inspection.
This document provides a checklist for inspecting a deluge valve system for a coal belt and other areas every 6 months. The checklist includes items to inspect general components like main valves, pressure gauges, and instrument valves. Specific tasks involve operating drain valves to check for leaks, testing alarm bells, checking membrane operation and water discharge, and ensuring valves and piping are free of leaks. The inspection also involves cleaning surfaces, checking for corrosion, and cleaning strainers. Signatures are required from the inspection team lead, mechanical superintendent, and mechanical engineer to certify the inspection.
PMR Check List - Deluge Valve System (Coal Belt & Others) (Each 6 Months Inspection)
Execution Date : ………………………………………………………….. Performed by: ……………………………………………………………………………………………..
Junction Junction Junction Description Location No. Transfer Tower #4 Junction Crusher Crusher Fire Pump BS Gen. BS Gen. Tower to Tower #5 Tower #5 Belt #4 Belt #4 Tower House House House Phase 1 Phase 2 Belt #8 Belt #8 Belt #8 79 80 81 82 83 84 85 86 87 88 89 A Inspection Items - General Operate and check the function of Main Valve (Fire line inlet Butterfly Valve, Deluge inlet Butterfly Valve, Deluge outlet 1 Butterfly Valve) rectify if found any malfunction. Main Valve should be in Open Condition 2 Check Pressure Gauges, replace if defect Operate and check the function of Instrument Valve 3 (Diaphragm Chamber Control Ball Valve, Alarm Bell Ball Valve) rectify if found any malfunction. Operate Drain Valve and check Membrane Leakage, rectify if 4 leakage is available 5 Operate Test Alarm Bell Valve and check the function of Bell Check Mambrane operation and water discharge, by Operate 6 Emergency Manual Quick Open Ball Valve. Check the function of Reset Ball Valve, Non Return Valve. 7 Automatic Drip Valve, Anti-repositor 8 Check the valve and piping for water leakage. Clean the surfaces, and associated valves by removing dust, 9 Salt, oil, grease and water. 10 Corrosion inspection and painting.