PMR Check List - Deluge Valve System (Coal Belt & Others) (Each 6 Months Inspection)

Execution Date : ………………………………………………………….. Performed by: ……………………………………………………………………………………………..


Junction Junction Junction
Description Location No. Transfer Tower #4 Junction Crusher Crusher Fire Pump BS Gen. BS Gen.
Tower to Tower #5 Tower #5
Belt #4 Belt #4 Tower House House House Phase 1 Phase 2
Belt #8 Belt #8 Belt #8
79 80 81 82 83 84 85 86 87 88 89
A Inspection Items - General
Operate and check the function of Main Valve (Fire line inlet
Butterfly Valve, Deluge inlet Butterfly Valve, Deluge outlet
1
Butterfly Valve) rectify if found any malfunction. Main Valve
should be in Open Condition
2 Check Pressure Gauges, replace if defect
Operate and check the function of Instrument Valve
3 (Diaphragm Chamber Control Ball Valve, Alarm Bell Ball
Valve) rectify if found any malfunction.
Operate Drain Valve and check Membrane Leakage, rectify if
4
leakage is available
5 Operate Test Alarm Bell Valve and check the function of Bell
Check Mambrane operation and water discharge, by Operate
6
Emergency Manual Quick Open Ball Valve.
Check the function of Reset Ball Valve, Non Return Valve.
7
Automatic Drip Valve, Anti-repositor
8 Check the valve and piping for water leakage.
Clean the surfaces, and associated valves by removing dust,
9
Salt, oil, grease and water.
10 Corrosion inspection and painting.

11 Clean the Y Strainers

Inspected by: Certified by:

……………………………………………….. …………………………………………………………….. …………………………………………………


Signature of Inspection Team Lead Mechanical Superintendent Mechanical Engineer