3/3/2022

Project Na. : TL MARISA MOUTONG


Calculation Sheet
of Project No. : TIP 24 TL MARISA MOUT..

Foundation Client : PLN Page 1

SUMMARY REPORT FOR FOUNDATION DESIGN


Project Information
Project Name TL MARISA MOUTONG
Structure Name DD NORMAL 2XHAWK

1. CHECK OF STABILITY
1.1 Check of Sliding Force (Bi-Axial)
Ft.Name # L/C Fs Allowable Result
F1 1 N/A 1.5 OK
F2 1 1.861 1.5 OK

1.2 Check of Overturning Moment


Ft.Name # L/C X - OVM Y - OVM Allowable Result
F1 1 N/A N/A 2 OK / OK
F2 1 5.28 5.95 2 OK / OK

1.3 Check of Bearing Pressure (Bi-Axial)


2
Ft.Name # L/C Qu(kN/m ) Allowable Result
F1 1 55.9 490.33 OK
F2 1 64.03 490.33 OK

1.4 Check of Uplift Force


Ft.Name # L/C Qu / Fz Allowable Result
F1 1 0 1.5 NG
F2 1 2.69 1.5 OK

2. DESIGN OF FOOTING
2.1 Check of Reinforcement 2
(Unit : mm )
Ft.Name Sec.Nam # L/C Req.As top / bottom Used.As top / bottom Result
S1 (X) 2 0.00 / 199.83 4870.86 / 7736.17 OK / OK
F1
S1 (Y) 2 0.00 / 209.47 5443.90 / 9455.20 OK / OK
S1 (X) 2 7242.74 / 0.00 5157.41 / 5157.41 NG / OK
F2
S1 (Y) 2 7461.92 / 0.00 8309.25 / 8309.25 OK / OK

2.2 Check of One Way Shear (Unit : kN)


Ft.Name Sec.Nam # L/C fVc Vu Result
S1 (X) 2 1151.57 13.82 OK
F1
S1 (Y) 2 1098.63 13.82 OK
S1 (X) 2 1151.57 973.77 OK
F2
S1 (Y) 2 1098.63 872.82 OK

Copyright (c) GS E&C. All Rights Reserved


3/3/2022

Project Na. : TL MARISA MOUTONG


Calculation Sheet
of Project No. : TIP 24 TL MARISA MOUT..

Foundation Client : PLN Page 2

2.3 Check of Two Way Shear (Unit : kN)


Ft.Name # L/C Ct. Pr.Name fVc Vu Result
F1 2 1 2097.171 30.571 OK
F2 2 2 2097.171 823.586 OK

Copyright (c) GS E&C. All Rights Reserved