FACTORY ACCEPTANCE TEST

CLIENT : PT. PUPUK SRIWIDJAJA PALEMBANG PURCHASE ORDER # : 5500017318


MACHINE : HPU-1000-H-2-N-10 DATE OF TESTING :

RESULT
VISUAL INSPECTION PASS FAIL
A. Overall dimensions within tolerance per technical drawing
B. Overall manufacturing and weld quality to standard requirement
C. Interconnecting Pipe and Fitting
D. Pipe runs properly supported

GENERAL HYDRAULIC INSPECTION


A. Relief Valve Function Test (180 Bar )
B. Flow Control Function Test ( Open Position - Close Position)
C. Pressure Testing at P Line
D. Pressure Testing at A & B Line

TEST RESULT
A. Leak Testing
B. Electrical Control System Test

NAME POSITION SIGNATURE

Witnessed by PT. PUPUK SRIWIDJAJA PALEMBANG

Approved by PT. PUPUK SRIWIDJAJA PALEMBANG