Risk Response Plan
Risk Response Plan
B Risk Identifier—a descriptive name or number. Use this for tracking across project documents
C Identify the risk and relevant triggers that may cause the risk to be realized
D Impact Area: Cost, Schedule, Scope, Quality
E Impact Score: 1/3/5/7/9 (where 9 is Very High)
F Probability of the event occurring: 1/3/5/7/9
G Impact x Probability
H Priority: L (<2), M (2 to 4), H (> 4) [L = Low, M = Medium, H = High]
I Active, Observe, Closed
J Identify the status of the risk: Open, Closed, New etc
K Identify the risk owner
L Ext = External; Org = Organizational; PM = Project Management; General = Technical, Quality or Performance
Impact Score Probability Risk Score Priority Status
1 1 2 High Active
3 3 6 Medium Observed
5 5 10 Low Closed
7 7 14 High Active
9 9 18 Medium Observed
1 3 4 Low Closed
3 5 8 High Active
5 7 12 Medium Observed