CARPENTRY NC-II
PRE-TEST
Multiple choice: Select the best answer that corresponds to the statement.
Write the letter of your answer on a piece of paper.
1. A line that represents one side of the building to be erected.
a. building line
b. orientation line
c. reference line
d. foundation line
2. A line that serves as the basis in locating the desired corners of the
building.
a. building line
b. orientation line
c. reference line
d. foundation line
3. It is the process of locating the corners of the building on the ground.
a. laying out
b. location planning
c. staking out
d. site planning
4. The actual position of the building can be seen in?
a. Location plan
b. foundation plan
c. floor plan
d. roofing plan
5. Which of the following should be attended to before staking out a
building?
a. Locate the reference line
b. locate the building line
c. identify the building area
d. clear the area for the building space
6. It is a horizontal board place at the corners and sides of the projected
building where the final lay out takes place.
a. Stake
b. Peg
c. batter board
d. battery
7. The type of batter board specifically used for foundation post.
a. Continuous
b. Single
c. Double
d. straight
8. One of the quality requirement for batter board is?
a. Smooth
b. Clean
c. Strong
d. fixed
TECHNICAL EDUCATION AND SKILLS DEVELOPMENT AUTHORITY
APARRI POLYTECHNIC INSTITUTE
Aparri, Cagayan
api@tesda.gov.ph
a. Timber
b. Lumber
c. Sander
d. Porter
25. A square with blades permanently set at 45o
a. miter square
b. miter saw
c. combined try and meter square
d. sliding T-bevel
26. Clearing a nearby space to set the dismantled pieces of
scaffolding down is not necessary especially if space is limited.
a. True
b. False
27. Starting with the base, make sure that the structure is sound
and that there are no visible hazards.
a. True
b. False
28. Safety shoes, hard hats and gloves should be worn only.
a. True
b. False
29. Begin the dismantling project at the bottom of the scaffold.
a. True
b. False
30. Avoid handing loose coupling/stacking pins by attaching them
to the top of the frame below.
a. True
b. False
31. A decorative cap to the top of a newel post, particularly at the
end of the balustrade.
a. Fillet
b. Baluster
c. Finial
d. Core rail
32. The vertical handrail that joins a sloped handrail to a higher
handrail on the balcony or landing is called?
a. Gooseneck
b. Rosette
c. Easings
d. Baluster
33. A term for the vertical posts that hold up the handrail.
Sometimes simply called guards or spindles.
a. Newel
b. Fillet
c. Finial
d. Baluster
34. The vertical handrail that joins a sloped handrail to a higher
handrail on the balcony or landing is a gooseneck.
TECHNICAL EDUCATION AND SKILLS DEVELOPMENT AUTHORITY
APARRI POLYTECHNIC INSTITUTE
Aparri, Cagayan
api@tesda.gov.ph
a. Gooseneck
b. Winders
c. Trim
d. Bullnose
35. A handrail end element for the bullnose step that curves inward
like a spiral.
a. Turnout
b. Volute
c. Handrail
d. Trim
36. An edge part of the tread that protrudes over the riser beneath.
a. Nosing
b. Volute
c. Trim
d. Turnout
37. It is composed of the tread and riser.
a. Gooseneck
b. Step
c. Trim
d. Bullnose
38. The vertical portion between each tread on the stair. This may
be missing for an “open” stair effect.
a. Riser
b. Volute
c. Trim
d. Turnout
39. The part of the stairway that is stepped on.
a. Riser
b. Trim
c. Tread
d. Winders
40. Winders are steps that are narrower on one side than the other.
They are used to change the direction of the stairs without landings.
a. Winders
b. Volute
c. Trim
d. Fillet
41. 15 Pcs. – 2” X 3” X 14’ = _____bd.ft.
a. 100
b. 105
c. 501
d. 150
42. 60 pcs – 2”X2”X18"= _______bd.ft.
a. 30
b. 300
c. 130
d. 310
TECHNICAL EDUCATION AND SKILLS DEVELOPMENT AUTHORITY
APARRI POLYTECHNIC INSTITUTE
Aparri, Cagayan
api@tesda.gov.ph
43. Given:
D= 26”
L= 16’
bd.ft.= ?
a. 844
b. 484
c. 488
d. 848
44. Give the different parts of the house truss. 5 pts.
45. What are the parts of a ceiling? 3pts.