Project Title: Installation of Dripping Collection System at Packing Table, Transfer Conveyor and MDC/MGR

Location: Del Monte Philippines, Inc., Cagayan de Oro City


GANTT CHART
Working
Item Description Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18
Days
1 Mobilization 1
2 Occupational Health and Safety
3 Catch Pan
3.1 Fabrication 45
3.2 Installation 18
4 Slat Conveyor
4.1 Fabrication 15
4.2 Installation
5 Demobilization 1

PREPARED BY: FRANCISCO T. ORIG