Professional Documents
Culture Documents
Industrial Training: Student'S Guidebook S E M 2 2 0 2 2 / 2 0 2 3
Industrial Training: Student'S Guidebook S E M 2 2 0 2 2 / 2 0 2 3
INDUSTRIAL
TRAINING
STUDENT'S GUIDEBOOK
SEM 2 2022/2023
TABLE OF
CONTENTS
Definition 01
Objectives 01
Learning Outcomes 02
Scope 03
Prerequisites 03
Placement 04
Leave 06
Exchanging Internship
Placement 07
Allowance 08
CONTENTS
Discipline 09
Assessments 11
Assessments 12
Pre-Internship 13
During Internship 14
Post-Internship 16
Appendices 20
Objectives
1
Learning Outcomes
The learning outcomes listed below are as learning outcomes
minimum to be completed in an industrial training program.
After the end of the program industrial training, students
can:
CLO1
Combine all the experiences gained during industrial training
and apply them during the following study year, or during the
final year project development [P7]
CLO2
Demonstrate effective communication skills in a working
environment [A3, CS]
CLO3
Demonstrate their understanding about work responsibility
and work ethics [A3, EM]
CLO4
Demonstrate responsible team player, have problem solving
skills and practice everything that have been experienced into their
working environment in the future [A3, LS]
2
Scope
Agreement between the IPT and the organization/company
(organization that accepts students for industrial training) it is
necessary to determine the specific tasks the student is
undergoing related industry training.
Prerequisite
TMF1014
System Analysis and Design
TMF1434
Data Structure and Algorithms
TMF3012
Ethics and Professionalism
3
TME39412
Industrial
Training
Placement (1/2)
Students must undergo an industrial training program at an
organisation certified by faculty in a field related to the study.
4
TME39412
Industrial
Training
Placement (2/2)
All applications from UNIMAS students for training industries in
various Centres or Pusat Tanggungjawab (PTj) in UNIMAS shall be
submitted to UnIC for processing. UnIC will identify PTj who
agree to accept students. This subject to vacancy, sufficient
space, and field suitability of student studies before placing
them.
Leave
Each student must follow the training schedule set by the
faculty and organisation. Students who need to take leave
(except sick leave) for a variety of reasons inevitably must
apply for permission from the organisation first.
Allowance
Students need to notify PLI and UnIC via email if they are
involved in an accident at work.
8
TME39412
Industrial
Training
Discipline (1/2)
9
TME39412
Industrial
Training
Discipline (2/2)
Do not take time off during industrial training except with the
approval of the relevant organisation.
10
TME39412
Industrial
Training
Assessments
13
TME39412
Industrial
Training
14
TME39412
Industrial
Training
The system will automatically update the new file and show only the
latest one. The portal caters for all university students, so it is
advisable for the students to keep each file size as small as
possible.
TME39412
Industrial
Training
Post Internship(1/2)
Company Supervisor
Each company supervisor is required to complete their student's
evaluation through an online form. The coordinators will use the
“Organisation Email” that the students provided in eStudent to
send a Form link to respective supervisors.
+6 082 58 3764
fcsitlicoordinators@unimas.my
Sarawak, Malaysia,
16
TME39412
Industrial
Training
Post Internship(2/2)
17
FCSIT
INDUSTRIAL TRAINING
MANAGEMENT TEAM
20
Appendix A: Industrial Training UNIMAS and FCSIT System
Fakulti (Faculty):
Alamat (Address):
b) Saya bersetuju untuk menggunakan maklumat data, dokumen dan apa-apa catatan lain yang berada dalam
pengetahuan saya hanya semata-mata untuk tujuan menjalani latihan industri; dan
I agree to use the confidentiality of all information, data, documents and any other records that are within
my knowledge solely for the purpose of industry training; and
c) Saya akan sentiasa memastikan dan menjaga kerahsiaan segala maklumat, data, dokumen dan apa-apa catatan
lain yang berada di dalam pengetahuan saya semasa/sedang menjalani latihan industri. Saya tidak akan
melakukan atau mengambil bahagian dengan apa-apa cara dalam mendedahkan, menyedia, mencetak,
menerbit, mengedarkan atau berkongsi segala maklumat, data, dokumen dan apa-apa catatan tersebut
dengan mana-mana pihak samada secara elektronik,fisikal atau dalam apa-apa kaedah lain tanpa kebenaran,
semasa dan selepas menjalani latihan industri;dan
I will always ensure and keep in custodian of the confidentiality of all information, data, documents and
any other records that are within my knowledge while/during undergoing industrial training. I shall not or
participate in any ways disclose, prepare, print, publish, distribute or share any such matter with any party
whether electronically, physically or in any other manner without permission, during and after undergoing
industry training; and
d) Saya dengan ini memahami bahawa sekiranya saya melanggar terma dan syarat-syarat Perjanjian Kerahsiaan
ini, saya boleh dikenakan tindakan tatatertib di bawah Akta Universiti dan Kolej Universiti 1971 (Pindaan
2009, 2012 and 2019 ) dan Perlembagaan Universiti Malaysia Sarawak 1998 ( Pindaan 2010 dan 2012)
bersama dengan peruntukan berkenaan dengan tatatertib am sebagaimana yang dinyatakan dalam Kaedah-
Kaedah Universiti Malaysia Sarawak (Tatatertib Pelajar-Pelajar) 1999.
I hereby duly understand that if I breach the terms and conditions of this Agreement, I may be subject to
disciplinary action under the Universities and University Colleges Act 1971 (Amendment 2009,2012 and
2019) and the Constitution of Universiti Malaysia Sarawak 1998 (Amendment 2010 and 2012) together
with provisions with respect to general discipline as set out in the Universiti Malaysia Sarawak ( Students
Disciplines) Rules 1999.
Dengan menyatakan nama saya seperti di atas, saya mengakui bahawa saya memahami sepenuhnya dan sedar
sekiranya saya gagal mematuhi mana-mana peruntukan demikian dalam undang-undang, statut, peraturan-
peraturan, arahan-arahan atau kaedah-kaedah, tindakan boleh diambil ke atas diri saya tertakluk kepada undang-
undang, statut, peraturan-peraturan, arahan-arahan atau kaedah- kaedah, merangkumi tindakan dipecat dari
universiti, terutamanya ke atas polisi Universiti Malaysia Sarawak mengenai Integriti Akademik.
By affixing my name as above, I acknowledge that I am fully understand and aware that if I fail to comply with any of
the provisions in such laws, statutes, regulations, rules or instructions, action may be taken against me in accordance
with the laws, statutes, regulations, rules or such instructions ,which include being expelled from the University,
foremost on the university policy of Universiti Malaysia Sarawak concerning the academic integrity.
Oleh demikian, saya dengan ini mengesahkan bahawa saya telah membaca dan sejelas-jelasnya faham dengan isi
kandungan yang dinyatakan dalam Perjanjian ini dan secara sukarela menerimanya tanpa paksaan.
Therefore,I hereby verify that I have read and clearly understood the contents express in this declaration and
willingly accept without any force or coercion.
Tarikh (Date)
Appendix B: FCSIT-LI 1 and FCSIT-LI 2 Forms
FCSIT-LI 1
INDUSTRIAL TRAINING
Please fill in this form within 1 week before reporting to the organisation and submit through to
the LI system at http://fcsitli.ia.unimas.my by the student
Organisational Information
Organisation Name
Department Name
Organisation Address
Contact Number
Fax Number
E-mail
FCSIT-LI 1/2022 | 1
Report Verification
I confirm and agree that the information provided in the form are true.
Signature : …………………………………………………..
Name : …………………………………………………..
Position : …………………………………………………..
Date : …………………………………………………..
FCSIT-LI 1/2022 | 2
FCSIT-LI 2
INDUSTRIAL TRAINING
Please fill in this form within 1 week after reporting to the organization and submit through e-mail to
the supervisor in charge:
Organisational Information
Organisation Name
Department Name
Organisation Address
Contact Number
Fax Number
E-mail
Report Verification
I confirmed that the following student(s) is/are undergoing industrial training in our organisation and
has reported him/her-self on the following date:
FCSIT-LI 2/2022 | 1
No. Matrix Number Student’s Name Programme
1.
2.
3.
4.
5.
Throughout the duration of industrial training, the organization provided facilities as such: (√ which
applied).
1. Accommodation
2. Transportation
Student’s Verification
I confirmed and agreed that the information provided in the form are true.
1. Student
Signature : …………………………………………………..
Name : …………………………………………………..
2. Student
Signature : …………………………………………………..
Name : …………………………………………………..
3. Student
Signature : …………………………………………………..
Name : …………………………………………………..
4. Student
Signature : …………………………………………………..
Name : …………………………………………………..
FCSIT-LI 2/2022 | 2
5. Student
Signature : …………………………………………………..
Name : …………………………………………………..
I confirm and agree that the information provided in the form are true.
Signature : …………………………………………………..
Name : …………………………………………………..
Position : …………………………………………………..
Date : …………………………………………………..
FCSIT-LI 2/2022 | 3
Appendix C: Internships Tracks
I N T E R S H IP @FCSIT, UNIMAS
TRACKS
FCSIT-LI 2/2022 | 4
TRACK 1
INDUSTRY
TRACK
FCSIT-LI 2/2022 | 5
GARIS PANDUAN MENJALANI LATIHAN INDUSTRI BERDASARKAN TREK INDUSTRI
1. Pengenalan
Latihan Industri berdasarkan trek industri adalah penempatan latihan industri bagi
pelajar UNIMAS di:
a) Syarikat/Industri di dalam atau luar Malaysia; atau
b) Pusat Tanggungjawab (Fakulti / Bahagian / Pusat / Institut) di dalam UNIMAS
2. Skop
i. Syarikat/Industri yang dipilih haruslah disemak dahulu oleh pelajar dan mendapat nasihat
daripada Fakulti.
ii. Pelajar tidak dibenarkan menjalani LI di mana-mana organisasi yang diragui
pengoperasiannya dan dijangka tidak memperoleh sebarang faedah daripadanya.
iii. Cadangan tempat bagi menjalani LI hendaklah disediakan beserta justifikasi ringkas
pemilihan tempat tersebut.
iv. Pelajar TIDAK dibenarkan menjalani latihan industri di bawah seliaan ahli keluarga
terdekat bagi mengelakkan konflik peribadi dalam penilaian tugas sepanjang tempoh LI.
v. Pelajar TIDAK dibenarkan menukar tempat menjalani LI tanpa sebab yang munasabah.
vi. Pemberian elaun menjalani LI tertakluk kepada budi bicara organisasi terlibat.
1
v. Pelajar TIDAK dibenarkan menjalani latihan industri di bawah seliaan ahli keluarga
terdekat bagi mengelakkan konflik peribadi dalam penilaian tugas sepanjang tempoh LI.
vi. Pelajar yang telah diterima menjalani LI di dalan UNIMAS, TIDAK
dibenarkan menolak penempatan LI tanpa sebab yang munasabah.
3. Pelaporan LI
Pelajar yang menjalani LI berdasarkan track ini hendaklah mengisi pelaporan dengan
lengkap seperti yang ditetapkan di dalam Sistem Penyeliaan LI.
Pelajar boleh mendapatkan nasihat dan maklumat lanjut daripada pihak UnIC seperti
berikut:
- En Nasrol Bin Ini (Penolong Pendaftar) – 082-58 1812
- Pn Ivyana Binti Paijan (Pembantu Tadbir Kanan (P/O)) – 082-58 1814
2
PK Industry Attachment Track
PROSES KERJA LATIHAN INDUSTRI SECARA ‘INDUSTRY ATTACHMENT TRACK’ TINDAKAN
MULA
Penyelaras LI Fakulti/
Penyelaras LI Fakulti/ Penyelaras LI Program/ UnIC menerima maklumbalas
Penyelaras LI Program/
penempatan daripada Syarikat/ Industri
UnIC
Penyelaras LI Fakulti/
Penyelaras LI Fakulti/ Penyelaras LI Program mengagihkan penyelia dari
Penyelaras LI Program/
kalangan Pensyarah UNIMAS
Penyelia LI
Penyelia LI memantau dan menyemak laporan melalui Sistem Penyeliaan Penyelia Dalaman
Pelajar UNIMAS
Penyelia menerima dan menyemak buku log dan laporan akhir pelajar melalui Penyelia Dalaman
sistem penyeliaan atau hardcopy (jika perlu) UNIMAS
TAMAT
PK LI (UNIMAS) Track
PROSES KERJA LATIHAN INDUSTRI KE PUSAT TANGGUNGJAWAB (PTj) DALAM UNIMAS TINDAKAN
MULA
Penyelaras LI Fakulti/
Penyelaras LI Fakulti/ Penyelaras LI Program mengemukakan borang
Penyelaras LI Program/
permohonan ke UnIC
UnIC
Penyelaras LI Fakulti/
Penyelaras LI Fakulti/ Penyelaras LI Program mengagihkan penyelia dari
Penyelaras LI Program/
kalangan Pensyarah UNIMAS
Penyelia LI
Penyelia LI memantau dan menyemak laporan melalui Sistem Penyeliaan Penyelia Dalaman
Pelajar UNIMAS
Penyelia menerima dan menyemak buku log dan laporan akhir pelajar melalui Penyelia Dalaman
sistem penyeliaan atau hardcopy (jika perlu) UNIMAS
Program :
Alamat Kediaman :
Ulasan :
TRACK 2
RESEARCH AND PROJECT BASED
TRACK
GARIS PANDUAN MENJALANI LATIHAN INDUSTRI BERDASARKAN TREK
RESEARCH & PROJECT BASED
1. Pengenalan
Latihan Industri berdasarkan trek research & project based boleh dilaksanakan
dengan kaedah penempatan pelajar bersama:
a) Geran Kajian;
b) Konsultansi; atau
c) Contract Research
2. Skop
3. Pelaporan LI
Pelajar yang menjalani LI berdasarkan track ini hendaklah mengisi
pelaporan dengan lengkap seperti yang ditetapkan di dalam Sistem
Penyeliaan LI.
Pelajar boleh mendapatkan nasihat dan maklumat lanjut daripada pihak UnIC
seperti berikut:
- En Nasrol Bin Ini (Penolong Pendaftar) – 082-58 1812
- Pn Ivyana Binti Paijan (Pembantu Tadbir Kanan (P/O)) – 082-58 1814
1
Lampiran 2 (Trek Research)
2
PK Research & Project-Based Track
PROSES KERJA LATIHAN INDUSTRI SECARA RESEARCH AND PROJECT-BASED TRACK TINDAKAN
Mula
Pelajar
Pelajar menghantar borang/ emel permohonan kepada Penyelaras LI Fakulti/
Penyelaras LI program
UnIC/ Penyelaras LI
Fakulti/ Penyelaras LI
Penyelaras LI Fakulti/ Penyelaras LI Program berbincang dengan pihak UnIC
Program/ Ketua Projek/
dan Ketua Projek/ PTj untuk mengenalpasti penempatan yang sesuai PTj/ UHSB/ UBS
Penyelaras LI Fakulti/
Penyelaras LI Fakulti/ Penyelaras LI Program menghantar permohonan Penyelaras LI Program/
kepada UnIC UnIC
NO
Pelajar diterima untuk penempatan
YES
UnIC menghantar pengesahan surat penempatan kepada PTj/ UHSB/ UBS dengan UnIC/ Penyelaras LI
sesalinan surat penempatan kepada Penyelaras LI Fakulti dan Penyelaras LI Fakulti/ Penyelaras LI
Program Program
Penyelia Dalaman
Penyelia memantau dan menyemak laporan harian pelajar UNIMAS
Penyelia menerima dan menyemak buku log dan laporan akhir pelajar Penyelia Dalaman
melalui sistem penyeliaan atau hardcopy (jika perlu) UNIMAS
Tamat
UnIC LI Research (01)
Program :
Alamat Kediaman :
2. Tajuk Kajian/Projek :
1|Page
Versi 1 : UnIC LI Research (01)
UnIC LI Research (01)
8. Program :
Ya Tidak
Ulasan :
2|Page
Versi 1 : UnIC LI Research (01)
Appendix D: Industrial Training Report and Log Book
FINAL DATE:
Student Information
Name
Matric Number
Name
Position
Date
Signature
Name
Date
Signature
1 Report Writing Guidelines
The final report for Industrial Training should be written in English. The length of the report should
not exceed 50 pages, excluding appendices. The entirety of the final report must be uniform and
consistent.
The final report consists of THREE (3) main parts which are:
All of these three main parts must be organized and given page number accordingly based on the
following table:
11 References/Bibliography
III
12 Appendices
1.2.1 SECTION I: Report Introduction
The report introduction consists of several components (or pages) including title page, declaration,
acknowledgement, disclaimer, executive summary/abstract, table of contents, list of tables, list of
figures and abbreviations.
The title must explain the main project and the maximum length is up to 15 words.
iii) Acknowledgement
This page contains the acknowledgement to all parties (individuals or institutions) who assist in the
project implementation. The acknowledgement must be simple and concise.
This page contains statement to claim validity and copyright of the report contents. Student needs
to write down the student’s name and matric number.
v) Executive Summary (Abstract)
Executive Summary is the essence of the whole report and needs to be given a special attention as
main text. References should not be cited in the Executive Summary, but if it is necessary, use
footnote. Avoid from using any abbreviations or acronyms.
Executive Summary should not exceed 300 words. It must contain fact-specific issues, a brief
explanation of the project; main findings including the facts that are significant (or not) and
conclusion. This summary should be typed in single spacing in only one page, and one paragraph.
Example: ABSTRACT
Table of Contents should follow the order, with relevant page number, all section and sub-section,
topic and sub-topic; list of references, acronyms and others overall report function; appendices and
indices (if any).
Example:
TABLE OF CONTENTS
This list contains all table titles exactly like in the text. Information that needs to be included is
table number, title and page number.
Example:
List of Tables
Table No. Caption Page
Table 1.1 List of computer 2
Table x.x … …
This list includes graphs, figures, maps and other illustrations. The title of figures must follow the
captions of figures in the report. The information must have figure number, title and page number.
Example:
List of Figures
Figure No. Caption Page
Figure 1.1 Organization Chart 5
Figure 1.2 …….. ..
This list includes all the abbreviations used in the report. The information must have the
abbreviation andthe meaning of the abbreviation.
Example:
List of Abbreviations
Report contents should consist of four main chapters namely Introduction, Project Description,
Overall Experience and Conclusion. At the end of each chapter (except chapter conclusion), a
summary of the chapter should be provided to formulate ideas/body of the chapter. The following is
the breakdown of the report:
Chapter 1: Introduction
1.1 Organization Background
1.2 Organization Business
1.3 ChapterSummary
Chapter 4: Conclusion
i) Chapter 1: Introduction
Introduction should include two main topics; the organization background and an overall observation
of the entire organization. Organization background contains basic information such as a brief
organization history, management, objective, organization mission and vision. Overall observation
covers overall aspect of organization specialization and roles. Discussion of related topics should
not exceed two pages each respectively.
ii) Chapter 2: Project Description
Chapter 2 covers detail explanation on the MAIN project. This chapter explains in detail the
involvement of the student in the project according to the production phase. The explanation
should come together with related deliverables such as the storyboard and script, screen
capture of the system, event picture etc. Media Interactive projects may include description
on the design of the system and the technical specification.
For this section, student should write up on the reflection of what they have learnt and
experienced during the execution of the project/tasks.
Chapter 3 aims to report the activities or other project (besides the main project as reported in
Chapter 2) throughout the Industrial Training. In this chapter, relevant activities/projects should be
listed and explained clearly. Students also need to report any problem encountered throughout the
Industrial Training.
In addition, students need to explain whether the Industrial Training has achieved its objectives. This
chapter should also include a section on reflection whereby the student learning
outcomes/experiences based on their practicum experiences being clearly explained in detail.
Students may highlight or provide feedback on the effectiveness of the knowledge they have gained
from the program in helping them undergo the industrial training.
Conclusion is the summation of all chapters. Students need to provide clear and solid conclusion
that reflects project done during the Industrial Training.
Note:
In this chapter, explanation/description on how the Industrial Training meets the objective should be
included.
1.2.3 SECTION III: References/Bibliography and Appendices
Section III covers the provision of list of bibliography and appendices. Both items are important to
provide readers with a referral or obtain additional declaration on the matter.
i) References/Bibliography
Bibliography should follow the provided format and style. Entries in the reference should follow one
of the following formats:
ii) Appendices
If any, appendices need to be attached after the references. Details of the attachment should be
listed in the table of contents. Page number is needed in every appendix. If there is more than one,
use letter A, B, C, and D at the beginning of the title of each appendix. Every new appendix must
start with new page. Some good examples for appendices are:
• Storyboard
• Script
• User manual
• Flow chart
• Gantt chart/project planning
• Source code
• Organization chart, etc.