PMCC Item No Item Description Category UserId Department Initiator Remark PMT Remarks
Start-Up SYSTEM /Standard Violation
PMCC-1 : MAINLINE Backfilling of the concrete pits are not
5 CIVIL YES PENDING KHANMI0P SA PIPELINES DEPT BA-077794
(PIPELINE) completed yet in the launcher area
PMCC-1 : MAINLINE Access platform are not constructed yet in Access platform has
10 MECHANICAL NO PENDING KHANMI0P SA PIPELINES DEPT BA-077794
(PIPELINE) launcher area and Km-42 been provided.
All Berm works are
PMCC-1 : MAINLINE Berming and the ROW are not proper at some completed waiting on
14 CIVIL NO PENDING KHANMI0P SA PIPELINES DEPT BA-077794
(PIPELINE) of the locations initiator to close in the
system.
PMCC-1 : MAINLINE
23 Area lightning at KM-42 is not completed yet ELECTRICAL NO PENDING KHANMI0P SA PIPELINES DEPT BA-077794
(PIPELINE)
This item is completed
waiting for initiator to
PMCC-1 : MAINLINE No power supply from the SEC in the switch
24 ELECTRICAL YES PENDING KHANMI0P SA PIPELINES DEPT close. Already BA-077794
(PIPELINE) rack at KM-42
energized package
102.
Hydro test was
PMCC-1 : MAINLINE completed. hydro test
28 Hydrostatic Test records has to be submitted. PIPING YES PENDING KHANMI0P SA PIPELINES DEPT BA-077794
(PIPELINE) result will be shared
through email.
Work in completed
PMCC-1 : MAINLINE Pig sig is not installed on the line at launcher
31 MECHANICAL YES PENDING KHANMI0P SA PIPELINES DEPT waiting for initiator to BA-077794
(PIPELINE) area and KM-42
close in the system.
PMCC-1 : MAINLINE
58 All cables not install ELECTRICAL YES PENDING MARRMS0U SA PIPELINES DEPT BA-078109001
(PIPELINE)
As per 16-SAMSS-512
Clause 20.2 there is no
recommendation of SS
tag. All
nameplates/equipmen
t tags shall be of non-
corrosive material and
On the switch rack the TAG must be SS not shall be attached with
PMCC-1 : MAINLINE
347 fenolic. All the details must be engraved on the ELECTRICAL YES PENDING MUWAHHRX SA PIPELINES DEPT mechanical, non- Switch rack drawing
(PIPELINE)
SS TAG corrosive hardware.
White nameplates
with black lettering
shall be provided to
identify the switchrack
with the tag number
indicated within Data
Schedule 1.
The breaker
Breaker rating was
temperature rating
At Km=0 The switch rack breaker must be of considered with De-
PMCC-1 : MAINLINE is not considered as
348 temperature rating 40 Degree is not acceptable. ELECTRICAL YES PENDING MUWAHHRX SA PIPELINES DEPT rated temperature. so Switch rack drawing
(PIPELINE) per SAES-P-100
It must be rated for 56 degree C there is no issue with
Point 9.2. So it has
40 Degree C.
to be changed
The breaker
At KM=42 the switch rack breaker temperature
temperature rating This item is completed
rating is 40 degree C. It is not acceptable it must
PMCC-1 : MAINLINE is not considered as & CSD approved
350 be 56 degree C. All the breaker installed out ELECTRICAL YES PENDING MUWAHHRX SA PIPELINES DEPT Electrical switch rack.
(PIPELINE) per SAES-P-100 waiting for initiator to
side the building must with stand the
Point 9.2. So it has close in the system
temperature of 56 degree C. as per standard.
to be changed
All the switch rack must be 30M away from the
classified zone. They must be installed in the This exception item
PMCC-1 : MAINLINE electrical switch rack
351 unclassified area. If the switch rack fall under ELECTRICAL YES PENDING MUWAHHRX SA PIPELINES DEPT should be moved to
(PIPELINE) drawing
classified area. the material for the switch rack PMCC-1
must be explosive proof.
For the power cable & control cable must not This exception item
PMCC-1 : MAINLINE
354 be layed in the same under ground trench. It ELECTRICAL YES PENDING MUWAHHRX SA PIPELINES DEPT should be moved to electrical drawings
(PIPELINE)
must be segregated PMCC-1
PMCC-1 : MAINLINE Under ground power & control cable must be
355 ELECTRICAL YES PENDING MUWAHHRX SA PIPELINES DEPT COMPLETED electrical drawing
(PIPELINE) indicated above the ground by wooden poles.
PMCC-1 : MAINLINE At KM -42 all the control cable insulation test Insulation test
360 MECHANICAL YES PENDING MUWAHHRX SA PIPELINES DEPT ILD
(PIPELINE) must be done and then terminated. Completed..
Breaker rating was
At Km-42 on AB-4 pipeline the switch rack considered with De-
PMCC-1 : MAINLINE
361 breaker must with stand temperature of 56 MECHANICAL YES PENDING MUWAHHRX SA PIPELINES DEPT rated temperature. so electrical drawing
(PIPELINE)
degree C there is no issue with
40 Degree C.
PMCC-1 : MAINLINE All the Hook up drawing for the filed instrument Loop package
366 INSTRUMENTATION YES PENDING MUWAHHRX SA PIPELINES DEPT ILD
(PIPELINE) must be provide in the fool folder package. completed
PMCC-1 : MAINLINE Fire alarm indicator such as horn & beacon at
367 FIRE PROTECTION YES PENDING MUWAHHRX SA PIPELINES DEPT COMPLETED Fire alarm
(PIPELINE) KM 42 must be installed Saudi Aramco: Company General Use
PMCC-1 : MAINLINE High sensitive fire alarm panel must be installed HSSD Installed on the
373 DCS YES PENDING MUWAHHRX SA PIPELINES DEPT RTU layout drawing
(PIPELINE) inside the RTU RTU..
RTU HVAC Function
PMCC-1 : MAINLINE
374 RTU HVAC function test must be done. HVAC YES PENDING MUWAHHRX SA PIPELINES DEPT test has been HVAC drawing
(PIPELINE)
completed during FAT.
As per 16-SAMSS-512
Clause 20.2 there is no
recommendation of SS
tag. All
nameplates/equipmen
t tags shall be of non-
corrosive material and
shall be attached with
PMCC-1 : MAINLINE At KM-42 on switch rack the switch rack detail
375 ELECTRICAL YES PENDING MUWAHHRX SA PIPELINES DEPT mechanical, non- Switch rack deatls.
(PIPELINE) must be engraved on SS plate
corrosive hardware.
White nameplates
with black lettering
shall be provided to
identify the switchrack
with the tag number
indicated within Data
Schedule 1.