This document is CPECC's response to PTTEP's review comments on the OTP for a solar power supply system for the Hassi Bir Rekaz Field Development Phase 1 project. CPECC addresses PTTEP's one comment by:
1) Removing the title "Installation" and replacing it with "Basic System Components" without changing the content.
2) Revising and modifying the content of the "Operation Test Procedure for Solar Power Supply System" section, including adding new sections.
3) Revising and modifying the content of the HSE section.
The response is checked and approved by CPECC.
Original Description:
Original Title
1624636144359_CRS for DZ-HBR-01-GEN-PJM-PDR-0204 RA2
This document is CPECC's response to PTTEP's review comments on the OTP for a solar power supply system for the Hassi Bir Rekaz Field Development Phase 1 project. CPECC addresses PTTEP's one comment by:
1) Removing the title "Installation" and replacing it with "Basic System Components" without changing the content.
2) Revising and modifying the content of the "Operation Test Procedure for Solar Power Supply System" section, including adding new sections.
3) Revising and modifying the content of the HSE section.
The response is checked and approved by CPECC.
This document is CPECC's response to PTTEP's review comments on the OTP for a solar power supply system for the Hassi Bir Rekaz Field Development Phase 1 project. CPECC addresses PTTEP's one comment by:
1) Removing the title "Installation" and replacing it with "Basic System Components" without changing the content.
2) Revising and modifying the content of the "Operation Test Procedure for Solar Power Supply System" section, including adding new sections.
3) Revising and modifying the content of the HSE section.
The response is checked and approved by CPECC.
PHASE 1 CPECC RESPONSE SHEET TO DOCUMENT REVIEW COMMENTS
CPECC TRANSMITTAL PTTEP TRANSMITTAL REVIEW
DATE DOCUMENT No. DOCUMENT TITLE REVISION NUMBER NUMBER CODE CPECC-PTTEP-PJM-T-21- PTTEP-CPECC-PJM-T-21- DZ-HBR-01-GEN-PJM-PDR- 09-May-2021 C OTP for Solar Power Supply System A1 1750 0895 0204 PTTEP - REVIEW BY CPECC – RESPONSE BY NAME NAME FARES EDDINE GACEB POSITION DISCIPLINE DATE DATE 23 June 2021
DOCUMENT REVIEW SHEET:
PTTEP COMMENT Sl. No. PTTEP - COMMENTS CPECC – RESPONSE (for RC1) ON CPECC STATUS/REMARK RESPONSE - The title: INSTALLATION, has been deleted, and modified by: BASIC SYSTEM COMPONENTS, without changing the content. - Revision and modification of the content of section: “Operation Test Procedure for Solar Power Supply System”, including the addition of sections: “Punch List 1 Summary”, “Required Instruments & Tool” and the merging of the following sections: - Commissioning Checks for Solar Power System. - Operational Testing for Solar Power Supply System. - Revision and modification of the content of section HSE.