KRAKATAU POSCO
STANDAR OPERATIONAL
PROCEDURE ELECTRICAL
LIGHTING PREPARATION
FOR APPROVAL
TOTAL OR PARTIAL REPRODUCTION AND/OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN
AUTHORIZATION OF THE OWNER
NEW SLAB SUPPLY ROUTE BUILDING
FOR NEW HSM PACKAGE 1
STANDAR OPERATIONAL PROCEDURE
ELCETRICAL LIGHTING PREPARATION
FD-KP-MEC-
Contents
1. GENERAL.............................................................................................................................................2
1.1. Introduction............................................................................................................................................2
1.2. Definition...............................................................................................................................................2
2. SCOPE...................................................................................................................................................2
3. EQUIPMENT & TOOLS......................................................................................................................2
4. WORK EXECUTION...........................................................................................................................3
4.1. Pilling Jack-in Pile With Hydraulic Static Pile Driver (HSPD)............................................................3
4.2. Excavation Soil......................................................................................................................................4
4.3. Lean concreate.......................................................................................................................................4
4.4. Installation Rebar...................................................................................................................................4
4.5. Formwork..............................................................................................................................................4
4.6. Pouring Concreate.................................................................................................................................5
4.7. Stone Masonry.......................................................................................................................................5
4.8. Slooft......................................................................................................................................................5
4.9. Installation Wall.....................................................................................................................................6
4.10. Wall Plester............................................................................................................................................6
4.11. Painting..................................................................................................................................................6
5. SAFETY PRECAUTION......................................................................................................................7
1. GENERAL
1.1. Introduction
1.2. Definition
Project No. PO 60390
Site Location Jl. Afrika No.2, Cilegon Banten 42443
CLIENT PT. KRAKATAU POSCO
CONTRACTOR PT. MATRA ENGINEERING & CONSTRUCTION
HIRA Hazard Identification Risk Assessment
PTW Permite to Work
2. SCOPE
This Construction Method Statement Covers for all the activities related to Civil
works in PT. Krakatau Posco area
1. Barricade Material;
2. Signage;
3. WORK EXECUTION
4. SAFETY PRECAUTION
Safety will be the first consideration and the highest priority. The Concrete work process will
follow safety viewpoints, following :
4.1.1. Make sure the necessary document prior to work is being approved by autorized
personnel;
4.1.2. Ensure the risk of work to be performed, prior to start have been assessed and the
countermeasures have been determined. Make sure HIRA are cascaded to the workers and
clearly understood before working starts;
4.1.3. Make sure “Tool Box Meeting” in working place is conducted before starting work;
4.1.4. Ensure all workers are wearing proper PPE during taking responsibility;
4.1.5. Make sure all tools and equipment are checked prior to use and regular checking
shall be done;
4.1.6. Safety sign and hard barricade should be placed surrounding the location and as per
directed by PTKP representative. Clear and safety for access go to pouring concrete
area;
4.1.7. The casting concrete which using crane and bucket shall be submitted the lifting
plan and work at height certificate before start the activity (if needed);
4.1.8. The site survey process should not be done inside barricade area;
4.1.9. Proper lighting must be prepared for work at night;
4.1.10. All vehicles and equipment that will exit the work area or project must be cleaned first.
4.1.11. Multi-gas detector usage prior to work.