Rejected - 116 Items
Rejected - 116 Items
PMCC Item No Item Description Category UserId Department Initiator Remark PMT Remarks
Start-Up SYSTEM /Standard Violation
PMCC-1 : MAINLINE Valve Station: Remove the gaps between the LOSS PREVENTION Work was not Access platform gaps
45 SAFETY NO REJECTED KHANMA1Q Nil
(PIPELINE) platforms and the control room building. DEPARTMENT complete as yet. Rectified.
PMCC-1 : MAINLINE Construct the remaining portion of marl Work in progress at BA-084703 from Sht No.
69 CIVIL NO REJECTED HUSSSJ0B INSPECTION DEPARTMENT
(PIPELINE) capping on berm from KM 15 to KM-26. site. 008 to 015
Complete the installation of fence line posts, Work is done waiting
PMCC-1 : MAINLINE BA-085006 sht 001 Rev
73 walk & drive gates, brace posts, gate hard CIVIL NO REJECTED HUSSSJ0B INSPECTION DEPARTMENT Not yet completed. for initiator to close in
(PIPELINE) 0F1
wares, barbe wires, chain links & anchor beams. the system.
Install all the remaining concrete platform,
Instrument
PMCC-1 : MAINLINE instrument supports, stairs, lighting pole BA-084984 sht-001, Rev.
75 CIVIL NO REJECTED HUSSSJ0B INSPECTION DEPARTMENT supports not yet
(PIPELINE) foundations at Main Valve station area in KM 0F1
completed.
42+863
Trench for SSD
PMCC-1 : MAINLINE Restore all the excavated trenches inside the BA-084984, Sht-001, Rev
77 CIVIL NO REJECTED HUSSSJ0B INSPECTION DEPARTMENT fence perimeter is Completed
(PIPELINE) marl pad of main valve station in KM 42+863. 0F1
remaining.
Final grading and compaction on marl capping
PMCC-1 : MAINLINE BA-084984, Sht-001 Rev
78 at the main valve station area and perimeter CIVIL NO REJECTED HUSSSJ0B INSPECTION DEPARTMENT Not completed yet. completed..
(PIPELINE) 0F1
patrol in KM 42+863.
PMCC-1 : MAINLINE Apply non-shrink grout on each foundation- BA-084984, sht-001 Rev
80 CIVIL NO REJECTED HUSSSJ0B INSPECTION DEPARTMENT Not yet done.
(PIPELINE) steel base supports in the main valve station. 0F1
The requested
Complete the power cable installation, Installed power information for this
PMCC-1 : MAINLINE
396 termination of PC-0178 in Valve station area at ELECTRICAL YES REJECTED FRANIGD INSPECTION DEPARTMENT cable is item was submitted. If SAES-P-104 section 6.1
(PIPELINE)
Km. 42.850 as per SAES-P-104 section 6.1. undersized? there is no objects
please close the item.