PV-1 COVER
THIS PROJECT SHALL COMPLY WITH THE
ROOF MOUNT RESIDENTIAL PHOTOVOLTAIC SYSTEM PV-2 SITE PLAN
FOLLOWING CODES:
PV-2A OPTIMIZER CHART
PV-3 ARRAY LAYOUT
SYYSTEM SIZE (DC) : STC: 48 X 320 = 15360 W DC 2019 CALIFORNIA ELECTRICAL CODE (CEC),
PV-4 STRUCTURAL ELEVATION
2019 CALIFORNIA RESIDENTIAL CODE (CRC),
PV-5 SINGLE LINE DIAGRAM
2019 CALIFORNIA BUILDING CODE (CBC),
: PTC: 48 X 294.83 = 14151.84 W DC PV-6 ELECTRICAL NOTES
2019 CALIFORNIA FIRE CODE (CFC),
PV-7 PLACARDS
2019 CALIFORNIA PLUMBING CODE (CPC),
SYSTEM SIZE (CEC-AC): 48 X 294.83 X 99% = 14010.32 W AC 2019 CALIFORNIA MECHANICAL CODE (CMC),
ATTACHMENTS:
MANUFACTURER AND PV INDUSTRY STANDARDS,
+ MODULE SPEC SHEET
AND ALL STATE AND JURISDICTION BY-LAWS AND
MODULES : 48 X APTOS SOLAR DNA-120 320, (320W) MODULES ORDINANCES.
+ INVERTER SPEC SHEET
+ RACKING SPEC SHEET
+ ENGINEERING LETTER
INVERTER : 1 X SOLAR EDGE SE3800H-US [SI1] & SOLAR EDGE SE7600H-US [SI1] PROJECT SHALL BE INSTALLED BY A LICENSED
CONTRACTOR.
ROOF : COMPOSITION SHINGLE
JURISDICTION
PROJECT NARRATIVE:
CITY OF HANFORD
SYSTEM DESCRIPTION:
1. 15.360 KW DC GRID-TIED SOLAR PHOTOVOLTAIC SYSTEM
VICINITY MAP: (NOT TO SCALE) FRONT OF RESIDENCE
2. (1) ARRAY ON A TWO STORY RESIDENCE WITH A COMPOSITION SHINGLE ROOF.
3. (2) INVERTER LOCATED SOUTH WALL.
4. CONNECT SYSTEM TO MSP WITH A NEW 2-POLE PV BREAKER.
5. RUN EMT ON ROOF, UNDER EAVES ON THE EXTERIOR OF THE RESIDENCE.
6. ROOF STRUCTURE: 2" X 6" RAFTERS @ 24" O.C
7. FIRE RATING: APTOS TYPE-1 MODULE WITH UNIRAC CLASS-A RACKING
19
'-
7"
(E) RESIDENCE
(E) POOL
92'-6"
59'-5"
ZION WAY
JB
(E) DRIVEWAY
FIRE OFFSETS:
36" FROM ONE RIDGE INV INV LC AC MSP
112'-7"
(N) SOLAR EDGE SE7600H-US [SI1] (E) MAIN SERVICE PANEL
INVERTER W/ INTEGRATED DC (SOLAR POINT OF CONNECTION)
DISCONNECT (SOUTH WALL)
(N) AC DISCONNECT SWITCH
(N) SOLAR EDGE SE3800H-US [SI1]
INVERTER W/ INTEGRATED DC (E) SHED
NOTES: DISCONNECT (SOUTH WALL)
· SMOKE / CARBON MONOXIDE ALARMS ARE REQUIRED TO BE (N) LOAD CENTER
INSTALLED AND IN WORKING CONDITION.
· NOTIFY UTILITY COMPANY BEFORE ACTIVATION OF PV SYSTEM.
· DO NOT INSTALL INVERTER WHERE IT COULD BE EXPOSED TO SITE PLAN
DIRECT SUNLIGHT TO AVOID UNWANTED POWER REDUCTION DUE TO
AN INCREASE IN THE INTERNAL TEMPERATURE OF THE INVERTER.
SCALE: 1/16" = 1'-0"
1
PROJECT ADDRESS: DATE: SHEET:
DRAFTER 00/00/0000
XXXXXXX XXXXXXXXXX SIGNATURE
XXXXXXX, XXXXXXX REVISION #
PV-2
00000 XXXXXXX XXX XXX XX, 0000 XXXXXX XX,
XXXXX, XX 00000
(000) 000 0000 XXXXXXX, XX 00000
DRAWING (000) 000-0000
LICENSE#: C-00 0000000 TYPE SITE PLAN
PROJECT ADDRESS: DATE: SHEET:
DRAFTER 00/00/0000
XXXXXXX XXXXXXXXXX SIGNATURE
XXXXXXX, XXXXXXX REVISION #
PV-2A
00000 XXXXXXX XXX XXX XX, 0000 XXXXXX XX,
XXXXX, XX 00000
(000) 000 0000 XXXXXXX, XX 00000
DRAWING (000) 000-0000
LICENSE#: C-00 0000000 TYPE OPTIMIZER CHART
ROOF AREA STATEMENT 1.4"
MODULES TRUE
ROOF PITCH
QTY ORIENTATION
APTOS SOLAR
1 48 25° 270°
2" X 6" RAFTERS @ 24" O.C DNA-120 320
2'-6" (320W)
NORTH 6'-4"
STRING 1
66.3" SPECS:
STRING 2 L : 66.3"
W : 39.4"
STRING 3
D : 1.4"
11'-1" STRING 4 41.9 LBS
(N) PV ARRAY AR-01
(890.07 SQ.FT.)
1
PV-4
39.4"
MODULE DETAILS
SCALE: 1/2" = 1'-0" 2
(N) ROOF MOUNTS
EVERY 72" O.C MAX CONSTRUCTION NOTES
4'-9"
(N) UNIRAC SOLARMOUNT · ROOF PITCH: 25°
STANDARD RAIL
JB · ROOF CLADDING: COMPOSITION SHINGLE
5'-6"
· ROOF STRUCTURE: 2" X 6" RAFTERS @ 24" O.C O/C
· MOUNTS ARE ON GRID SPACING, OCCURRING AT RAFTERS.
· VERIFY RAFTER LOCATIONS IN FIELD.
25° 12'-11"
· REFER TO MODULE AND RACKING MFR'S INSTALL MANUALS.
· MAX SPAN BETWEEN MOUNTS: 72" O.C.
· PLUMBING AND MECHANICAL VENTS SHALL NOT BE COVERED
(N) JUNCTION BOX
INV INV LC AC MSP
BY SOLAR MODULES.
(UNDER ARRAY) (E) MAIN SERVICE PANEL · ALL FASTENERS STAINLESS STEEL U.O.N.
(N) LOAD (SOLAR POINT OF CONNECTION)
(N) CONDUIT RUN: 3/4" EMT CENTER (N) AC DISCONNECT SWITCH
(N) SOLAR EDGE SE7600H-US [SI1]
(N) SOLAR EDGE SE3800H-US [SI1]
INVERTER W/ INTEGRATED DC
INVERTER W/ INTEGRATED DC
DISCONNECT (SOUTH WALL)
DISCONNECT (SOUTH WALL)
ADDITIONAL NOTES:
· FINAL LOCATION OF ALL CONDUIT AND JUNCTION BOXES TO BE DETERMINED AT TIME OF INSTALLATION.
· CONDUIT TO BE PAINTED TO MATCH EXTERIOR OF RESIDENCE WHERE APPLICABLE AND IS TO BE SUPPORTED EVERY 10' MAX.
· 30" WIDE X 36" DEEP WORKING SPACE CLEARANCES REQUIRED ABOUT ALL ELECTRICAL EQUIPMENT.
· STAGGER PENETRATIONS TO EVENLY DISTRIBUTE LOAD ACROSS ALL TRUSSES UNDER ARRAY.
· ALL DIMENSIONS ARE APPROXIMATIONS.
· DO NOT INSTALL INVERTER WHERE IT COULD BE EXPOSED TO DIRECT SUNLIGHT TO AVOID UNWANTED POWER REDUCTION DUE ROOF PLAN WITH MODULES LAYOUT
TO AN INCREASE IN THE INTERNAL TEMPERATURE OF THE INVERTER. SCALE: 3/32" = 1'-0" 1
PROJECT ADDRESS: DATE: SHEET:
DRAFTER 00/00/0000
XXXXXXX XXXXXXXXXX SIGNATURE
XXXXXXX, XXXXXXX REVISION #
PV-3
00000 XXXXXXX XXX XXX XX, 0000 XXXXXX XX,
XXXXX, XX 00000
(000) 000 0000 XXXXXXX, XX 00000
DRAWING
LICENSE#: C-00 0000000 TYPE ARRAY LAYOUT (000) 000-0000
LAG BOLT SCHEDULE
MATERIAL LIST
LOCATION INFIELD 3' SIDE ZONES 3' CORNER ZONES
AC OUT AR-01
15.360 kW (DC) SOLAR ARRAY: (16) APTOS SOLAR DNA-120 320, (320W)
MODULES IN (2) STRING OF (8) MODULES
(48) APTOS SOLAR DNA-120 320, (320W) MODULES WITH NEMA AT (25°) PITCH AND (270°) ORIENTATION
(48) SOLAREDGE POWER OPTIMIZERS: P320 WITH DC IN TYPE 3R
UL LISTED (16) SOLAREDGE: P320
(1) SOLAREDGE WAVE 7.6KW INVERTER: SE7600H-US JUNCTION DC OPTIMIZERS
(1) SOLAREDGE WAVE 3.8KW INVERTER: SE3800H-US 3/4" EMT OR EQUIVALENT
BOX
(2) STRING OF (16) MODULES & (2) STRING OF (8) MODULES (2) #10 AWG THWN-2 CONDUCTORS UTILITY INTERACTICE INVERTER
W/ INTEGRATED DC DISCONNECT
(1) #10 AWG THWN-2 NEUTRAL CONDUCTORS EXPOSED TO FREE AIR
(1) #10 AWG THWN-2 GROUND 10.5A MAX, 480VDC MAX (4) #10 AWG PV-WIRE
NOTE: INTEGRATED DC DISCONNECT IS INSTALLED (1) #6 AWG BARE COPPER GROUND
WITH RAPID SHUTDOWN DEVICE BY MANUFACTURER WIRE IN CONDUIT CAN BE #8 AWG THWN-2
IN COMPLIANCE WITH NEC 690.12.
NOTES:
· CONDUTORS ON ROOF MUST BE SUNLIGHT RESISTANT, 90°C RATED AND SUITABLE FOR WET LOCATIONS.
· SEE RACKING SPEC SHEETS FOR RACKING EQUIPMENT GROUNDING METHOD.
· ALL GROUNDING CONDUCTORS MUST BE PROTECTED FROM DAMAGE IF NOT INSTALLED IN CONDUIT.
· ALL WIRING MUST BE PROPERLY SUPPORTED BY DEVICES OR MECHANICAL MEANS DESIGNED AND LISTED FOR
SUCH USE. WIRING MUST BE PERMANENTLY AND COMPLETELY HELD OFF OF THE ROOF.
· ALL DEVICES USED FOR BONDING FRAMES OF MODULES OR OTHER EQUIPMENT TO THE GROUNDING SYSTEM
MUST BE LISTED AND IDENTIFIED FOR THE PURPOSE.
· SOLAREDGE OPTIMIZERS ARE TO BE BONDED TO RACKING BY USING EITHER AN OPTIMIZER ATTACHMENT KIT
OR A SOLAREDGE GROUNDING PLATE. (SEE SPEC SHEETS).
PROJECT ADDRESS: DATE: SHEET:
DRAFTER 00/00/0000
XXXXXXX XXXXXXXXXX SIGNATURE
XXXXXXX, XXXXXXX REVISION #
PV-5
00000 XXXXXXX XXX XXX XX, 0000 XXXXXX XX,
XXXXX, XX 00000
(000) 000 0000 XXXXXXX, XX 00000
LICENSE#: C-00 0000000
DRAWING
TYPE
SINGLE LINE DIAGRAM (000) 000-0000
15.360 kW (DC) SOLAR ARRAY:
(48) APTOS SOLAR DNA-120 320, (320W) MODULES WITH
(48) SOLAREDGE POWER OPTIMIZERS: P320 WITH
(1) SOLAREDGE WAVE 7.6KW INVERTER: SE7600H-US
(1) SOLAREDGE WAVE 3.8KW INVERTER: SE3800H-US
(2) STRING OF (16) MODULES & (2) STRING OF (8) MODULES
ASSUMPTIONS:
HIGH TEMPERATURE = 37 °C
LOW TEMPERATURE = -10 °C
ADDED TEMPERATURE FOR CONDUIT RUN ON ROOF = 22 °C
90 °C RATED WIRE FOR DC CURRENT
75 °C RATED WIRE FOR AC CURRENT THAT TERMINATES AT A
BREAKER
ELECTRICAL NOTES:
· ALL PV MODULES, ARRAY FRAMING AND RACKING SHALL BE GROUNDED PER MFR'S SPECIFICATIONS.
· ALL EQUIPMENT WILL BE UL 1703, UL 1741, OR UL 2703 LISTED AND CERTIFIED.
· MODULES WILL BE GROUNDED WITH INTEGRADED GROUNDING MODULE CLAMPS. ARRAY FRAME
WILL BE GROUNDED WITH ILSCO GBL-4DBT (OR EQUIVALENT-SUITABLE FOR DIRECT BURIAL AND
CONTACT WITH COPPER OR ALUMINUM) LAY IN TYPE GROUNDING LUG. USE SPECIFIED MODULE
GROUNDING POINTS.
· ALL WIRE TERMINATIONS, SPLICES AND CONNECTIONS SHALL BE MADE USING A LISTED DEVICE OR
ELECTRICAL BOX SUITED FOR THE PURPOSE. ALL WIRES NOT IN CONDUIT TO BE PROVIDED WITH
STRAIN RELIEF AT ENTRY INTO JUNCTION BOXES.
· PROVIDE AND INSTALL CONDUIT EXPANSION FITTINGS, PER MANUFACTURER'S SPECIFICATIONS, IN
CONDUIT RUNS WHERE THERMAL EXPANSION IS 0.25" OR MORE, BASED ON RECORD MAXIMUM AND
MINIMUM TEMPERATURES FOR THE SITE (SEE NEC TABLE 310.15(B)(2)(C), AND USING EXPANSION
COEFFICIENT OF STEEL.
· BOTH ENDS OF ALL METALLIC CONDUIT CONTAINING GROUNDING ELECTRODE CONDUCTORS SHALL
BE BONDED PER NEC 250.64(E).
· PROVIDE AND INSTALL ALL GROUNDING AS REQUIRED BY NEC ARTICLES 250, 690 AND SYSTEM
MANUFACTURER.
· INSTALLATIONS WHICH USE TRANSFORMER-LESS INVERTERS - PV WIRE TYPE IS REQUIRED FOR ALL
DC WIRE RUNS IN FREE AIR, OR NOT IN CONDUIT.
· EACH CURRENT CARRYING CONDUCTOR IN ALL PV SOURCE CIRCUITS OR PV OUTPUT CIRCUITS
SHALL BE DISCONNECTED/ FUSED, WHEN NECESSARY.
· CONTRACTOR SHALL VERIFY EXISTENCE OF UNDERGROUND UTILITIES PRIOR TO ANY EXCAVATIONS.
· ELECTRICAL TRENCH RUNS, WHERE USED, SHALL USE SCHEDULE 40 PVC CONDUIT AND PROVIDE 18"
MIN CLEARANCE FROM TOP OF CONDUIT TO GRADE, AND MAGNETIC WARNING TAPE AT 12" BELOW
GRADE. 24" CLEARANCE AND SCHEDULE 80 PVC IS REQUIRED IN AREAS WHERE SUBJECT TO
VEHICLE TRAFFIC.
· CHECK WITH LOCAL JURISDICTION FOR ANY ADDITIONAL FILL AND COMPACTION REQUIREMENTS,
SPOILS TREATMENT AND/OR EROSION CONTROL MEASURES PRIOR TO EXCAVATION.
· INSTALLATIONS IN LIGHTENING-PRONE LOCATIONS ARE RECOMMENDED TO UTILIZE DC LIGHTENING
ARRESTORS IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS.
· SUPPLY SIDE CONNECTIONS SHALL ONLY BE MADE WITH LISTED AND APPROVED TAPS.
· ALL WIRE RUNS SHALL NOT EXCEED 2% CALCULATED VOLTAGE DROP.
· VERIFY EXISTING GROUNDING ELECTRODE. IF NONE EXISTS, A NEW GROUND ROD MAY BE
REQUIRED. MIN. SIZE 8' LONG x 5/8" DIA, COPPER CLAD. BOND TO GAS, AND HOT AND COLD WATER
PIPES.
· USE WATERPROOF FITTINGS FOR ALL EXTERIOR CONDUIT.
· GROUNDING ELECTRODE CONDUCTOR (AC SIDE OF INVERTER) IS #8 IF IN CONDUIT, OR #6 AWG IF
EXPOSED AND SUBJECT TO DAMAGE, AND SHALL BE CONTINUOUS FROM INVERTER TO GROUND
ROD. USE IRREVERSIBLE SPLICES WHERE NECESSARY.
· EQUIPMENT GROUNDING CONDUCTOR (DC SIDE OF INVERTER) IS #10 IF IN CONDUIT, OR #6 awg IF
EXPOSED AND SUBJECT TO DAMAGE (NEC 690.46).
INVERTER
BLACK OUTLINE WITH BLACK TEXT / WARNING IS FOLLOWING SOURCES WITH DISCONNECT(S) LOCATED AS SHOWN.
(CEC 690.58 (C)(3)) IN BLACK TEXT AND ORANGE BACKGROUND DANGEROUS VOLTAGE MAY BE PRESENT AT ALL TIMES
WHITE LETTERS WITH RED BACKGROUND
ADDRESS
WARNING - ELECTRIC SHOCK HAZARD SOLAR PV SYSTEM EQUIPPED 0000 XXXXXX XX, XXXXXXX, XX 00000
NO USER SERVICABLE PARTS WITH RAPID SHUTDOWN CEC 690.56(C)(1)(A)
INSIDE CONTACT AUTHORIZED BLACK OUTLINE WITH
SERVICER FOR ASSISTANCE TURN RAPID BLACK TEXT AND
WHITE BACKGROUND /
SHUTDOWN SWITCH NOTE ON TOP IS IN
CEC 690.13.G.3 & CEC 690.13.G.4 TO THE "OFF" POSITION SOLAR ELECTRIC BLACK TEXT AND
WHITE LETTERS WITH RED BACKGROUND TO SHUTDOWN PV PV PANELS
YELLOW BACKGROUND
ARRAY SYSTEM AND REDUCE
SHOCK HAZARD IN
ARRAY
J/B DC WARNING
PV SOLAR
ELECTRIC SHOCK HAZARD ARRAY
THE DC CONDUCTORS OF THIS JB
POWER OPTIMIZER
Power Optimizer P320 / P340 / P370 / P400 / P405 / P505
P370
For North America Optimizer model
(typical module
P320
(for 60-cell
P340
(for high-
(for higher-
power
P400
(for 72 & 96-
P405
(for thin film
P505
(for higher
power 60-cell cell current
P320 / P340 / P370 / P400 / P405 / P505 compatibility) modules)
modules)
60 and 72-cell
modules)
modules)
modules)
modules)
INPUT
Rated Input DC Power(1) 320 340 370 400 405 505 W
Absolute Maximum Input
Voltage 48 60 80 125(2) 83(2) Vdc
25 (Voc at lowest temperature)
MPPT Operating Range 8 - 48 8 - 60 8 - 80 12.5 - 105 12.5 - 83 Vdc
YEAR
WARRANTY Maximum Short Circuit Current
11 10.1 14 Adc
(Isc)
Maximum DC Input Current 13.75 12.63 17.5 Adc
Maximum Efficiency 99.5 %
Weighted Efficiency 98.8 98.6 %
Overvoltage Category II
OUTPUT DURING OPERATION (POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER)
Maximum Output Current 15 Adc
Maximum Output Voltage 60 85 Vdc
OUTPUT DURING STANDBY (POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE
INVERTER OFF)
Safety Output Voltage per
1 ± 0.1 Vdc
Power Optimizer
STANDARD COMPLIANCE
EMC FCC Part15 Class B, IEC61000-6-2, IEC61000-6-3
Safety IEC62109-1 (class II safety), UL1741
RoHS Yes
INSTALLATION SPECIFICATIONS
Maximum Allowed System
1000 Vdc
Voltage
Compatible inverters All SolarEdge Single Phase and Three Phase inverters
129 x 153 x 33.5 / 129 x 159 x 49.5 / 129 x 162 x 59 /
Dimensions (W x L x H) 129 x 153 x 27.5 / 5.1 x 6 x 1.1 mm / in
5.1 x 6 x 1.3 5.1 x 6.3 x 1.9 5.1 x 6.4 x 2.3
Weight (including cables) 630 / 1.4 750 / 1.7 845 / 1.9 1064 / 2.3 gr / lb
Input Connector MC4(3)
Output Wire Type / Connector Double Insulated; MC4
Output Wire Length 0.95 / 3.0 1.2 / 3.9 m / ft
Input Wire Length 0.16 / 0.52 m / ft
Operating Temperature Range -40 - +85 / -40 - +185 ˚C / ˚F
PV power optimization at the module-level Protection Rating IP68 / NEMA6P
Relative Humidity 0 - 100 %
(1)
Rated STC power of the module. Module of up to +5% power tolerance allowed
(2)
NEC 2017 requires max input voltage be not more than 80V
Specifically designed to work with SolarEdge Fast installation with a single bolt (3)
For other connector types please contact SolarEdge
inverters
Next generation maintenance with module- PV System Design Using Single Phase
Single phase Three Phase 208V Three Phase 480V
Up to 25% more energy level monitoring a SolarEdge Inverter(4)(5) HD-Wave
P320, P340, P370,
Minimum String Length 8 10 18
P400
(Power Optimizers)
Superior efficiency (99.5%) Meets NEC requirements for arc fault P405 / P505 6 8 14
protection (AFCI) and Photovoltaic Rapid Maximum String Length
25 25 50(6)
(Power Optimizers)
Mitigates all types of module mismatch losses, Shutdown System (PVRSS) 5700 (6000 with
from manufacturing tolerance to partial Maximum Power per String SE7600-US - SE11400- 5250 6000(7) 12750(8) W
US)
shading Module-level voltage shutdown for installer Parallel Strings of Different Lengths
Yes
and firefighter safety or Orientations
Flexible system design for maximum space (4)
For detailed string sizing information refer to: http://www.solaredge.com/sites/default/files/string_sizing_na.pdf
(5)
It is not allowed to mix P405/P505 with P320/P340/P370/P400 in one string
utilization (6)
A string with more than 30 optimizers does not meet NEC rapid shutdown requirements; safety voltage will be above the 30V requirement
(7)
For SE14.4KUS/SE43.2KUS: It is allowed to install up to 6,500W per string when 3 strings are connected to the inverter (3 strings per unit for SE43.2KUS) and when
the maximum power difference between the strings is up to 1,000W
(8)
For SE30KUS/SE33.3KUS/SE66.6KUS/SE100KUS: It is allowed to install up to 15,000W per string when 3 strings are connected to the inverter (3 strings per unit for SE66.6KUS/SE100KUS)
and when the maximum power difference between the strings is up to 2,000W
solaredge.com © SolarEdge Technologies Ltd. All rights reserved. SOLAREDGE, the SolarEdge logo, OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies, Inc.
All other trademarks mentioned herein are trademarks of their respective owners. Date: 12/2018/V01/ENG NAM. Subject to change without notice.
Rapid Shutdown Kit - Installation and Configuration (Single Phase Inverters)
5
Rapid Shutdown Kit - Installation and Configuration The rapid shutdown cables have a resistor connected to one end (on the red cable). Connect these ends to the switch,
making sure that the red and black cables are reversed relative to the cables connected at the top of the switch (going into
(Single Phase Inverters) the DC side conduit between the inverter and the Safety Switch), as detailed below. Apply a torque of 2 N*m (18 lb*in):
This document describes how to install the rapid shutdown kit in the SolarEdge Safety Switch, and how to enable the rapid
If the cables at the top are red and black from left to right, connect as shown below.
shutdown feature in the inverter in order to provide the functionality described in the Rapid Shutdown clause of NEC2014 Red (+) Black (-)
690.12 (1) through (4).
Kit Contents
Rapid shutdown cables
Micro-SD card and SD card adapter with firmware files (Note: DO NOT THROW AWAY THE CARD AND THE ADAPTER; keep
them for installation of other rapid shutdown kits)
DC+ DC-
Cable Installation
Perform this procedure before connecting the strings to the Safety Switch [Chapter 4: Connecting the AC and the Strings to the
Safety Switch in the SolarEdge Installation Guide].
1 Turn the inverter ON/OFF switch to OFF. If installing the kit in an inverter that is already operating, wait until the LCD
indicates that the DC voltage is safe (<50V), or wait five minutes before continuing to the next step.
2 Turn the Safety Switch and the AC switch on the main circuit board to OFF. Black (-) Red (+) with rapid
shutdown resistor
WARNING!
If you cannot see the inverter panel, or if a malfunction is indicated on the LCD panel, wait five minutes for the input Figure 2: Rapid shutdown cable connected – option 1
capacitors of the inverter to discharge.
3 Loosen the four Allen screws on the front cover of the Safety Switch, and open the cover.
If the cables at the top are black and red from left to right, connect as shown below.
4 Carefully disconnect the two DC cables from the left side of the switch and from the DC connection spring clamp terminals,
as illustrated below1. Use a standard straight-bladed screwdriver to disconnect the cables from the terminals. Black (-) Red (+)
Disconnect here
DC+ DC-
DC connection terminals
Disconnect here
6 Use a standard straight-bladed screwdriver to connect the other end of the rapid shutdown cables to the DC connection
Figure 1: Inside the AC/DC Safety Switch spring-clamp terminals: Connect the black cable from the switch to the DC- terminal block, and connect the red cable from
the switch to the DC+ terminal block.
7 Check that the cables are located and connected in the correct positions to ensure the rapid shutdown functionality.
8 Close the cover: Attach the switch cover and secure it by tightening the four screws with a torque of 0.9 ft.*lb / 1.2 N*m.
1The internal components may vary depending on the Safety Switch model; the figures in this documents show the AC/DC Safety Switch for single phase
7.6-11.4 kW inverters.
Rapid Shutdown Kit Installation - MAN-01-00186-1.6 1 Rapid Shutdown Kit Installation - MAN-01-00186-1.6 2
Chapter 2: Installing the Power Optimizers Step 1: Mounting and Grounding the Power Optimizers
3. Attach each power optimizer to the rack using M6 (1/4'') stainless steel bolts, nuts and washers or
other appropriate mounting hardware. A pply torque of 9.5 N*m / 7 lb*ft.
For 3NA series power optimizes, SolarEdge recommends mounting the power optimizer on a rail with
the smooth side facing out, so that the power optimizer body will prevent its rotation.
4. Use the following methods2 to ground the power optimizer:
WARNING!
The metallic enclosure of the power optimizer must be grounded in accordance with the
requirements of the local and national codes. Figure 6: Power optimizer installation and grounding using a grounding plate
AVERTISSEMENT! l For mounting on un-grounded structures (such as a wooden structure): If the star washer or
L'enceinte métallique de l’optimiseur de puissance doit être mise à la terre en accord avec les the plate cannot be used, use the SolarEdge grounding lug (purchased separately) with an
régulations locales et nationales. equipment-grounding conductor according to the supplied instructions. The grounding terminal
accepts a wire size of 6-14 AWG, and must be sized for equipment grounding per NEC 250.122
l For mounting on a grounded metal rail: Use the provided 5/16'' stainless steel grounding star requirements. Tighten the screws connecting the power optimizer to the frame and the
washer between the railing and the flat side of the mounting bracket. The grounding washer grounding terminal screw. Apply torque of 9.5 N*m / 7 lb*ft. See Figure 7
should break through the anodize coating of the railing to ensure low resistive connection. Apply
torque of 9.5 N*m / 7 lb*ft. See Figure 5.
BETTER RESULTS
CONCEALED MAXIMIZE PROFITABILITY ON EVERY JOB
UNIVERSAL Trust Unirac to help you minimize both system and labor costs from the time the job is
CLAMPS quoted to the time your teams get off the roof. Faster installs. Less Waste. More Profits.
UNIVERSAL SELF
BETTER SUPPORT STANDING MIDCLAMPS
UL2703
BONDING & GROUNDING Visit design.unirac.com
LI STED
MECHANICAL LOADING
SYSTEM FIRE CLASSIFICATION
NOW FEATURING FLASHKIT PRO NOW WITH UNIVERSAL MIDCLAMPS REVOLUTIONARY NEW ENDCLAMPS UNMATCHED CERTIFIED ENGINEERING BANKABLE DESIGN PERMIT
The Complete Roof Attachment Solution Accommodates 30mm-51mm module frames Concealed design and included End Caps EXPERIENCE QUALITY EXCELLENCE WARRANTY TOOLS DOCUMENTATION
F E AT UR ING TECHNOLOGY
One tool, one-person installs are here!
BEST INSTALLATION EXPERIENCE • CURB APPEAL • COMPLETE SOLUTION • UNIRAC SUPPORT ENHANCE YOUR REPUTATION WITH QUALITY RACKING SOLUTIONS BACKED BY ENGINEERING EXCELLENCE AND A SUPERIOR SUPPLY CHAIN
PUB2016MAY16 - PRINTED UPDATE
SM SOLAR
MOUNT
STANDARD SYSTEM COMPONENTS
INSTALLATION GUIDE PAGE
A
RAIL: Supports PV modules. Use at least two per
SM
SYSTEM LEVEL FIRE CLASSIFICATION
SOLAR
MOUNT
CODE COMPLIANCE NOTES
INSTALLATION GUIDE PAGE
C
row of modules. Aluminum extrusion, available in The system fire class rating requires installation in the manner specified in the SOLARMOUNT Installation Guide. SOLARMOUNT has been classified to the system level
mill, clear anodized, or dark anodized. fire portion of UL 1703. This UL 1703 classification has been incorporated into our UL 2703 product certification. SOLARMOUNT has achieved system level performance
RAIL SPLICE: Non structural splice joins, for steep sloped roofs. System level fire performance is inherent in the SOLARMOUNT design, and no additional mitigation measures are required. The fire classification
rating is only valid on roof pitches greater than 2:12 (slopes ≥ 2 inches per foot, or 9.5 degrees). The system is to be mounted over fire resistant roof covering rated for
aligns, and electrically bonds rail sections into
single length of rail. Forms a rigid splice joint, 4 the application. There is no required minimum or maximum height limitation above the roof deck to maintain the system fire rating for SOLARMOUNT. Module Types
inches long, preassembled with bonding hardware. & System Level Fire Ratings are listed below:
Available in dark anodized or mill finish. Rail Type Module Type System Level Fire Rating Rail Direction Module Mitigation
L-FOOT: Use to secure rails through roofing Orientation Required
material to building structure. Refer to loading
tables or U-Builder for spacing.
Standard Rail Type 1, Type 2, Type 3 & Type 10 Class A, Class B & Class C East-West Landscape OR Portrait None Required
North-South Landscape OR Portrait None Required
L-FOOT T- BOLT: (3/8” x ¾" or 1”) – Use one per
L-foot to secure rail to L-foot. Stainless steel. Light Rail Type 1 & Type 2 Class A, Class B & Class C East-West Landscape OR Portrait None Required
Supplied with L-foot in combination with flange nut, North-South Landscape OR Portrait None Required
provides electrical bond between L-foot and rail.
SERRATED FLANGE NUT : Use one per L-foot This racking system may be used to ground and/or mount a PV module complying with UL1703 only when the specific module has been evaluated for
to secure and bond rail to Lfoot. Stainless steel. grounding and/or mounting in compliance with the included instructions.
Supplied with L-foot. UL2703 CERTIFICATION MARKING LABEL
MODULE ENDCLAMP: Pre-assembled universal Unirac SOLARMOUNT is listed to UL 2703. Certification marking is embossed on all mid clamps as shown.
clamp that secures module to rail at module Labels with additional information will be provided . After the racking system is fully assembled, a single
flange by tightening 1/2" hex head bolt. label should be applied to the SOLARMOUNT rail at the edge of the array. Before applying the label, the
SM STANDARD RAIL
MODULE MIDCLAMP: Pre-assembled clamp corners of the label that do not pertain to the system being installed must be removed so that only the
SM LIGHT RAIL provides module to module and module to rail
bond. Aluminum clamp with stainless steel
installed system type is showing.
Note: The sticker label should be placed such that it is visible, but not outward facing.
bonding pins and T-bolt. Available in clear or
dark finish.
MICROINVERTER MOUNTING BOLT:
Preassembled bolt, nut, and captive star washer
Wrenches and Torque Anti-Seize attaches and bonds microinverter to rail.
Wrench or Socket Size Recommended Stainless steel hardware can seize up, a process called
Torque (ft-lbs)
galling. To significantly reduce its likelihood: NOTE - POSITION INDICATOR: T-bolts have a slot
Mid Clamp 1/2” 11 1. Apply minimal lubricant to bolts only where in the hardware end corresponding to the direction
MLPE Mount 1/2” 10
indicated in installation process, preferably Anti-Seize of the T-Head.
commonly found at auto parts stores (Anti-seize has
End Clamp 1/2” 3 been factory applied to mid clamp bolts)
L-Foot to Rail 1/2” 30 2. Shade hardware prior to installation, and
3. Avoid spinning stainless nuts onto bolts at high speed.
Rail Splice 1/2” 10
SM STANDARD RAIL SM LIGHT RAIL
SM SOLAR ENPHASE MICROINVERTER FOR SPLICE & THERMAL BREAK
SM SOLAR STANDARD SYSTEM GROUNDING
ELECTRICAL GROUNDING W/
I J
MOUNT INSTALLATION GUIDE PAGE MOUNT INSTALLATION GUIDE PAGE
WEEBLUG TERMINAL TORQUE,
CONTINUOUS RAIL & ELECTRICAL BONDING SPLICE EXPANSION JOINT W/GROUNDING LUGS & COPPER JUMPER EXPANSION JOINT W/O ELECTRICAL BONDING CONNECTION
Single Use Only Install Conductor and
Enphase Microinverter (MI) Requirements Enphase Microinverter (MI) Requirements Enphase Microinverter (MI) Requirements torque to the following:
(Model No. M215 & M250) (Model No. M215 & M250) (Model No. M215 & M250) 6-14 AWG: 5ft-lbs
3 Microinverters sharing same trunk cable & rails 3 or more Microinverters sharing same trunk cable & rails MIn. 3 Microinverters on each side of thermal break
SM RAIL
NU SOLARMOUNT is intended to be used with PV
MO 1 NG
E
TEMPORARY BONDING DURNING ARRAY MAINTENANCE
DU
MO LE D FLA modules that have a system voltage less than or
DU
FR
AM TE 2 BONDING
2 RA equal to that allowable by NEC. For standard
LE E ER CONNECTION
FR AR S
system grounding a minimum 10AWG, 105°C
AM 1 EB
E LIC 2 I N G T- B copper grounding conductor should be used to
1 SP ND O
2 L-F
BO RE O O ground a system, according to the National
ND WA OT
LT
B
ING RD Electric Code (NEC). It is the installer’s
T-B 3 HA
ING
SM RAIL
SM RAIL
O responsibility to check local codes, which may vary.
3 LT ND 1 MODULE REMOVED
BO
B-
4 See below for interconnection information.
BONDING MID SG
co
CLAMPS MAINTAIN Ils INTERCONNECTION INFORMATION
BONDING MIDCLAMP ASSEMBLY BONDING MIDCLAMP ASSEMBLY BONDING RAIL SPLICE BAR RAIL TO L-FOOT w/BONDING T-BOLT IR
E
Bonding Hardware creates bond between splice GROUND PATH W There is no size limit on how many SOLARMOUNT
1 bar and each rail section 1 Serrated flange nut removes L-foot anodization
R
1 Aluminum mid clamp with stainless steel bonding pins that pierce module frame to bond L-Foot to stainless steel T-bolt
P PE & PV modules can be mechanically interconnected
anodization to bond module to module through clamp
Aluminum splice bar spans across rail gap to CO
2 2
Serrated T-bolt head penetrates rail anodization
LI
D for any given configuration, provided that the
2 Stainless steel nut bonds aluminum clamp to stainless steel T-bolt
create rail to rail bond. Rail on at least one side
of splice will be grounded.
to bond T-bolt, nut, and L-foot to grounded
SM rail SO installation meets the requirements of applicable
3 Serrated T-bolt head penetrates rail anodization to bond T-bolt, nut, clamp, and Note: Splice bar and bolted connection are B -4 building and fire codes.
modules to SM rail non-structural. The splice bar function is rail SG
alignment and bonding. co
Ils GROUNDING NOTES
The installation must be conducted in accordance
TEMPORARY BONDING CONNECTION DURING ARRAY MAINTENANCE with the National Electric Code (NEC) and the
D ES
SM RAIL
Note: OL When removing modules for replacement or system maintenance, any module left in place that is secured authority having jurisdiction. Please refer to these
HEX NUT W/ CAPTIVE
Only one lug per module row required 1 LOCK WASHER
ID
CO with a bonding Midclamp will be properly grounded. If a module adjacent to the end module of a row is resources in your location for required grounding lug
GE PPE
BONDING 2 N R removed or if any other maintenance condition leaves a module without a bonding mid clamp, a temporary quantities specific to your project.
LA WI IL
T-BOLT E RF RE RA bonding connection must be installed as shown
RT SM
E D B -IN
VE
• Attach Ilsco SGB4 to wall of rail The grounding / bonding components may overhang
O
CR 1 parts of the array so care must be made when
RACK SYSTEM
BONDING BONDING RAIL MI • Attach Ilsco SGB4 to module frame
GROUND
MICROINVERTER SPLICE BAR 2 walking around the array to avoid damage.
Option 1: MOUNT
• Install solid copper wire jumper to Ilsco lugs
Ground Through SEE NOTE WEEBLUG (OR ILSCO LUG)
Enphase Trunk Cable Conductor fastener torque values depend
on conductor size. See product data sheets for
correct torque values.
BONDING MICROINVERTER MOUNT RACK SYSTEM GROUND
Hex nut with captive lock washer bonds metal WEEB washer dimples pierce anodized rail to
1 microinverter flange to stainless steel T-bolt 1 create bond between rail and lug PERIODIC INSPECTION: Conduct periodic
BONDING MIDCLAMP inspections for loose components, loose fasteners or
ASSEMBLY A 2 Serrated T-bolt head penetrates rail anodization
Solid copper wire connected to lug is routed to
to bond T-bolt, nut, and L-foot to grounded 2 provide final system ground connection. any corrosion, immediately replace any affected
SM rail System ground including racking and
NOTE: Ilsco lug can also be used when secured to
components.
C modules may be achieved through the trunk cable
of approved microinverter systems. See page I for the side of the rail. See page I-3 for details
Option 2: Ground Lug w/ RAIL TO L-FOOT
details
Bare Copper Wire w/BONDING T-BOLT
1
4" BOLT LOCATION
1
4" BOLT LOCATION
9
2 16 "
11
1 16 "
3
8" BOLT LOCATION
3
8" BOLT LOCATION
PART # TABLE
P/N DESCRIPTION LENGTH
320132M SM RAIL 132" MILL 132"
310132C SM RAIL 132" CLR 132"
320168M SM RAIL 168" MILL 168"
310168C SM RAIL 168" CLR 168"
PART # TABLE
320168D SM RAIL 168" DRK 168"
P/N DESCRIPTION LENGTH
320208M SM RAIL 208" MILL 208"
315168M SM LIGHT RAIL 168" MILL 168"
310208C SM RAIL 208" CLR 208"
315168D SM LIGHT RAIL 168" DRK 168"
320240M SM RAIL 240" MILL 240"
315240M SM LIGHT RAIL 240" MILL 240"
310240C SM RAIL 240" CLR 240"
310240D SM RAIL 240" DRK 240"
315240D SM LIGHT RAIL 240" DRK 240"
PRODUCT LINE: SOLARMOUNT DRAWING NOT TO SCALE PRODUCT LINE: SOLARMOUNT DRAWING NOT TO SCALE
ALL DIMENSIONS ARE ALL DIMENSIONS ARE
SM-P01
SM-P02
DRAWING TYPE: PART DETAIL NOMINAL DRAWING TYPE: PART DETAIL NOMINAL
1411 BROADWAY BLVD. NE 1411 BROADWAY BLVD. NE
ALBUQUERQUE, NM 87102 USA DESCRIPTION: STANDARD RAIL PRODUCT PROTECTED BY ALBUQUERQUE, NM 87102 USA DESCRIPTION: LIGHT RAIL PRODUCT PROTECTED BY
PHONE: 505.242.6411 ONE OR MORE US PATENTS PHONE: 505.242.6411 ONE OR MORE US PATENTS
WWW.UNIRAC.COM REVISION DATE: 9/11/2017 WWW.UNIRAC.COM REVISION DATE: 9/11/2017
LEGAL NOTICE SHEET LEGAL NOTICE SHEET
PRO SERIES END CLAMP PRO SERIES MID CLAMP
17 16 "
1
4" BOLT LOCATION
11
16 " 11 11 2 "
16 "
1"
30mm to 51mm
BOTTOM CLIP SLOT
MODULE FRAME
PART # TABLE
P/N DESCRIPTION
302035M ENDCLAMP PRO
3" 302030M MIDCLAMP PRO - MILL
302030D MIDCLAMP PRO - DRK
3
8" BOLT LOCATION
MID CLAMP
7
1 8"
END CLAMP
PART # TABLE
P/N DESCRIPTION LENGTH
410144M SMHD, RAIL 144" MILL 144"
410168M SMHD, RAIL 168" MILL 168"
END CAP
410204M SMHD, RAIL 204" MILL 204" INCLUDED WITH END CLAMP
PRODUCT LINE: SOLARMOUNT DRAWING NOT TO SCALE PRODUCT LINE: SOLARMOUNT DRAWING NOT TO SCALE
ALL DIMENSIONS ARE ALL DIMENSIONS ARE
SM-A01
SM-P03
DRAWING TYPE: PART DETAIL NOMINAL DRAWING TYPE: PART & ASSEMBLY NOMINAL
1411 BROADWAY BLVD. NE 1411 BROADWAY BLVD. NE
PRODUCT PROTECTED BY PRO SERIES PRODUCT PROTECTED BY
ALBUQUERQUE, NM 87102 USA DESCRIPTION: HD RAIL ALBUQUERQUE, NM 87102 USA DESCRIPTION:
PHONE: 505.242.6411 ONE OR MORE US PATENTS PHONE: 505.242.6411 BONDING CLAMPS ONE OR MORE US PATENTS
WWW.UNIRAC.COM REVISION DATE: 9/11/2017 LEGAL NOTICE SHEET WWW.UNIRAC.COM REVISION DATE: 10/26/2017 LEGAL NOTICE SHEET