You are on page 1of 2

DATE:

PROJECT: INTERIOR FIT-OUT


OWNER:
LOCATION:

SUBJECT : QUOTATION / PROPOSAL

DEAR CLIENT,

We are pleased to submit our proposal for the supply of labor & materials for your
proposed interior fit-out as follows.

I. SCOPE OF WORKS
AMOUNT

A. Supply & Installation of Dry-Wall Partition at left side elevation P16,348.00


B. Supply & Installation of 300mm x 300mm floor tiles, white color P26,721.00
C. Working Table & Cabinets @ Storage area P59,128.00
D. Partition of Storage Room Including Door P18,552.00
E. Reception Table P8,388.00
F. Supply and Installation of Anodized Aluminum Door 0.90 x 2.10M P9,600.00
W/ fixed glass on side
G. Supply of two (2) units office table P14,400.00
H. Electrical – Additional six (6) units duplex convenience outlet P8,000.00
I. Painting P28,928.00
J. Miscellaneous & Overhead P8,628.00

TOTAL AMOUNT: P198,693.00


II. TERMS & CONDITIONS
- Fifty (50%) Percent Down Payment
- Remaining (50%) Percent Progress Billing
- Owner supplied materials & expenses:
 Lighting Fixtures
 Office Chairs
 Electric power supply, water supply during construction
 Aircon unit, including electrical power line
Specifications:
1. Floor Tiles 300x300mm (White) Eurotiles
2. Dry wall partition – Hardiflex 1/6 mm thk (Single Wall) - Metal studs
3. Cabinets & Working tables – ¾ inches thk Marine Plywood (Enamel Finish)
4. Paint – Boysen or Davies in brand.

(NON-VAT)

Yours truly,

Project Engineer

Project Architect