ONE DIRECT METHOD STATEMENT

NUMBER: MS0019

Dismantling of Non Start Date 01/05/2016


Task / Activity
Load Bearing Wall Review Date 01/05/2018
Accompanying Risk SRA 10, 16, 17, 18, 19,
Site Address /Location OHG Properties
Assessment 22, 23

Personnel Involved One Direct Operatives Role /Trade Multi Trade

Mark Bloxidge – H&S Manager Tel: 07900 160656


Health & Safety
Jessica Langley – H&S Advisor Tel: 07966 348804

Main Hazards Preventative Measures


yy Working at height yy Operative must be competent to carry out the task
yy Asbestos yy Operative must have received training and be competent
yy Manual handling to carry out working at height
yy Contact with electricity yy Barriers or warning signs to be put in place where
yy Gas identified by risk assessment
yy Slips, trips and falls yy Operatives must be trained and competent to use hand
tools, power tools
yy Hazardous substances
yy Do not lift beyond your capabilities, if necessary get help
yy Operatives to confirm location of electrical services, gas
and water supplies
Work Equipment yy Keep work area clean and tidy
yy Handling substances in line with appropriate COSHH
yy Hammers, Bolster, chisel,
control approach
Hoover, Breaker, Drill
yy Dispose of waste to the designated area
yy All operatives to read the asbestos information for the
property
yy Wear appropriate PPE where identified

Sequence of Operations for Task


yy Wall is to be inspected and tested yy Ensure area to be worked on is clear of
by a competent person prior to the obstructions, protect any surfaces to prevent
commencement of works to ensure that the damage, maintain good access and egress
wall is non-load bearing. yy Locate and ensure that all gas, water and
yy Ensure appropriate PPE is being worn electrical services are located and isolated
yy Consult asbestos information for the by a competent person
property, report any concerns to supervisor yy Ensure that work area is adequately
yy Secure work area boundary with appropriate ventilated
protection barriers and display warning/ yy Check all hand and power tools to ensure
safety signage as required that they are safe to use, faulty or damaged

OD/HS/2012/V2 Prepared By M Bloxidge (H&S Manager) Date: 01/05/2016


ONE DIRECT METHOD STATEMENT
NUMBER: MS0019

tools to be removed from use immediately yy Work down the wall, ensuring that all waste
yy Remove and fixtures and fittings from wall is removed from the working area as quickly
yy Remove doors from frames as possible in order to keep the work area
clear and minimise the risk of trips and falls
yy Cut plaster along the edges of the wall to
ensure that any plaster removal does not yy At the lower levels of the walls (below
run onto adjoining walls shoulder height) a breaker/ drill with chisel
attachment may be used to dismantle the
yy Remove paper and plaster from wall,
wall in small chunks
damping down if required, and dispose of
waste to designated area yy All areas to be checked following the
dismantling of the wall for safety and
yy Starting at the top of the wall, use hammer
structural purposes including any adjoining
and bolster/ chisel to dismantle wall in
ceilings, walls and floors
small chunks for easy removal, taking care to
avoid flying debris, damp down if required yy All areas to be thoroughly cleaned
yy Monitor wall as demolition commences for
possible collapse

PPE Required

HARD HAT HAND PROTECTION SAFETY VISOR


YES YES NO

HIGH VIZ SAFETY FOOTWEAR DUST MASK


YES YES YES

EYE PROTECTION EAR PROTECTION


YES YES

Environmental Protection Measures


yy Dispose of all waste in designated area or skip provided for waste and in accordance with
manufactures instructions

OD/HS/2012/V2 Prepared By M Bloxidge (H&S Manager) Date: 01/05/2016


ONE DIRECT METHOD STATEMENT
NUMBER: MS0019

Hazardous Substances

IRRITANT/ RESPIRATORY
FLAMMABLE
SENSITISER SENSITISER
NO
YES YES

TOXIC CORROSIVE DANGEROUS TO


NO NO THE ENVIRONMENT
NO

GAS UNDER PRESSURE


NO

Emergency procedures
First Aid:
yy First Aid box provided on all vehicles
yy Local arrangements for contacting emergency services to be identified
yy Location or nearest hospital A&E must be known
yy In case of serious accident or injury requiring immediate medical attention call 999
yy Always inform supervisor or H&S Manager of all accidents, incidents and near misses
yy Ensure that accident, incident or near miss is logged
Fire:
yy Fire extinguisher on all vehicles
yy Only attempt to extinguisher f safe to do so
yy Local arrangements for contacting emergency services to be identified
yy Maintain adequate emergency access route in working location at all times

OD/HS/2012/V2 Prepared By M Bloxidge (H&S Manager) Date: 01/05/2016


ONE DIRECT METHOD STATEMENT
NUMBER: MS0019

Training & Supervision Permit to work


yy All staff have received H&S Induction training yy N/A
yy All Operatives are supervised

Safety of Other Contractors Refuelling Procedure


or Members of the Public of Plant Machinery
yy Ensure that other contractors are aware
or Equipment
of hazards present
yy Fuel to be carried in appropriate fuel
yy Ensure that work area is secured containers and secured in vans. All plant
yy No works will be left in a dangerous and machinery to be refuelled away from
condition or with risk to themselves, the van, visitors and members of the
contractors, tenants or members of the public and any sources of ignition.
public yy Fuel is to be transferred from the
yy All tools and equipment will be securely proprietary containers by certified fuel
stored or removed from site at the end of transfer unit or through a funnel into the
each working day machine tank.

OD/HS/2012/V2 Prepared By M Bloxidge (H&S Manager) Date: 01/05/2016