Project: Maja Warehouse Tools and or Equipment required: JSA No:

Job Location & Details: Electrical Installation Works


Date Prepared:
JSA Participants: Safety Engineer, Engineer, Supervisor, Foreman Painting and sanding materials,
Section: All Sections of the project scaffold. Fire extinguisher
Approved by HSE Manager:
Responsible Supervisor: Applicable Personnel / As Below
HAZARDS IDENTIFIED CONTROLS REQUIRED
JOB STEP ACTION BY/RECORD
(Eg. Electrocution from 11Kv (Eg. Remove overhead cable or isolate/sheath overhead or
(Eg. Set Up Crane) (Eg. Supervisor)
Cables) monitor with spotter, Training, PPE Needs)

Installation of Roughing Fall from height  Obtain work permit Supervisor, Operator,
ins and fixtures at Rigger, HSE Officer
height Falling object  Only qualified/certified electrician shall perform the
work
Electrocution
 Ladder should be sufficient of height
Slip, Trips and falls
 Damage ladder must be removed from site
Cuts
 Tools shall be inspected and color coded before use

 Homemade tools shall be remove from site

 All cords shall be protected to prevent slip, trips

 All workers shall be provided with the necessary


PPE’s such as, Safety glass, safety shoes, safety
mask, high voltage resistance gloves
Installation of Clips by Eye Injuries  Electrical tools shall be inspected and color coded Engineer, Supervisor,
drill prior to use HSE Officer
Electrical shock
 Homemade tools shall be removed from site
falling materials
 Area to be delineated and signage installed.
Cuts
 All workers shall be provided with the necessary
dust inhalation. PPE’s such as, Safety glass, safety shoes, safety
mask, high voltage resistance gloves
Patching Chased walls Concrete burns  Prior to mixing cement for patching MSDS is to be Engineer, Supervisor,
Eye irritation made available and all safe use and handling HSE Officer
requirements adhered to. PPE to be worn at all
times special emphasis on protective eye wear and
non porous gloves.

 When using water for mixing purposes ensure all


electrical leads or tools are removed from the area.

 All empty bags of cement are to be removed as


soon as works are completed. Area to be cleaned.