You are on page 1of 14

JOB SAFETY ANALYSIS WORKSHEET

Country Office/ Project: JGC PENTHOUSE EXTENSION BLDG. Tools and / or Equipment Required: JSA No:

Job Location & Details: Erection of truss mobile crane, lifting accessories, Date Prepared:
scaffolding
JSA Participants: Approved by :

Responsible Supervisor:

Date:

JOB STEP HAZARDS IDENTIFIED RISK CONTROLS REQUIRED ACTION BY


1. Built up temporary Structure collapse due to improper Supporting structure should be in accordance with the Safety Engineer/Erection
support for the assemble erection design sequence to meet the required supporting Engineer/ Supervisor
truss on the ground prior structure. The supporting structure should be
to final erection. inspected by Designing Engineer prior to commence
final erection of trusses.

Structure collapse due t sub standard Supporting structure should be in accordance with Safety Engineer/Erection
design material specifications. Requires considerable design Engineer/ Supervisor
calculations and the maximum load that will impose.
Design Engineer to inspect the structure prior to
heavy lift.

Fall of workers during erection of Use of mechanical lifting device such as telehandler, Safety Engineer/ Erection
temporary structure cherry picker or man basket whichever is applicable, Engineer/
wearing of full body harness while working at height. Supervisor/workers

Fall of structure during erection The structure should be lift by competent rigger and Safety Engineer/Erection
operator. Ensure bolt connections are in place and Engineer/ Supervisor
tight. To survey the verticality of the supporting
structure.
Struck by the moving equipment Barricade and delineate signs surrounded in the Safety Engineer/Erection
supporting structure should be in place. Assign banks Engineer/
PICMW INC.1
JOB SAFETY ANALYSIS WORKSHEET

Country Office/ Project: JGC PENTHOUSE EXTENSION BLDG. Tools and / or Equipment Required: JSA No:

Job Location & Details: Erection of truss mobile crane, lifting accessories, Date Prepared:
scaffolding
JSA Participants: Approved by :

Responsible Supervisor:

Date:

JOB STEP HAZARDS IDENTIFIED RISK CONTROLS REQUIRED ACTION BY


man if necessary Supervisor/Banks man
Pinch point Use tools for bolting such as spud wrench prior to Supervisor/workers
insert the bolt never position your finger where
crushing injury may occur such as in the bolt holes
and during alignment.

Fire If it requires gas cutting for the job due to slotted holes
provisions of fire blanket, fire extinguisher and
watchman during the activities. Combustible materials
underneath cutting activities should be removed and
ensure no smoldering materials after leaving the site.
2. Tandem lift preparation Assembled pipe truss being attached Thorough inspection of the assemble pipe truss such Safety Engineer/Erection
includes inspection of to the temporary support prior to lift as obstructed scaffolding parts, pull or pushing Engineer/Supervisor
temporary support, devices connected to the assemble pipe truss, pin
positioning of lifting connecting system etc,.
accessories and removal Improper position of the shackles Thorough inspections of shackles position before Erection
of slings after erection erection shall be carried out by competent person. Engineer/supervisor
( first part)
Unstable position of the slings. Slings in place properly avoid twisting position, slings Erection
to position in a right location base on the rigging plan Engineer/Supervisor

Fall of workers upon placement of Telehandler, cherry picker and man basket which Supervisor/Operator/worke
PICMW INC.2
JOB SAFETY ANALYSIS WORKSHEET

Country Office/ Project: JGC PENTHOUSE EXTENSION BLDG. Tools and / or Equipment Required: JSA No:

Job Location & Details: Erection of truss mobile crane, lifting accessories, Date Prepared:
scaffolding
JSA Participants: Approved by :

Responsible Supervisor:

Date:

JOB STEP HAZARDS IDENTIFIED RISK CONTROLS REQUIRED ACTION BY


lifting accessories ever is applicable to put, remove and realignment of rs
sling to its right position.

Crushing injury upon positioning of Use hand gloves, proper coordination between the Crane
lifting accessories rigger and operator upon hoisting up and down the Operator/Workers/rigger
crane while putting, removing and positioning of lifting
accessories.

Crane collapse due to operators fault, Require competent operator and rigger to do lifting Safety Engineer/Erection
3. Tandem lift utilizing the mechanical fault, rigger and ground activities, should set up in firm and level ground Engineer/Crane Operator
crane to lift and travel the condition for crane set up. surfaces prior to assemble.
assemble truss (first part)
to its final position A toolbox talk shall be carried out to discuss the
relevant safety responsibility of the team member
during the erection process.

Crane operational and pre erection checklist to carry


out prior to installation to ensure safety relevant items
are complied and in placed
Incompetent rigger and operator Requires competent and certified crane operator Safety Engineer/Erection
having familiar and previous experiences in handling Engineer/Crane Operator/
such equipment. Capable to communicate verbal and Rigger
PICMW INC.3
JOB SAFETY ANALYSIS WORKSHEET

Country Office/ Project: JGC PENTHOUSE EXTENSION BLDG. Tools and / or Equipment Required: JSA No:

Job Location & Details: Erection of truss mobile crane, lifting accessories, Date Prepared:
scaffolding
JSA Participants: Approved by :

Responsible Supervisor:

Date:

JOB STEP HAZARDS IDENTIFIED RISK CONTROLS REQUIRED ACTION BY


hand signal to the rigger. Operator has the ability to
respond emergency situation if problem arises during
the lift. Operator should aware of the crawler crane
set up against the lifted load. If overloading sounded
stopped the lifting activity and inform to the concerned
personnel.

Poor communications Ensure fully charge radio communication. Assign Safety Engineer/Erection
frequency for the erection team to avoid any Engineer/Supervisor/Crane
interference during heavy lift. To avoid conflict a Operator/rigger
review of hand signals shall be conducted both rigger
and operators. Turn off the other communication such
as celphone during the commencement of heavy lift.
Delineation of responsibilities of each erection
members shall be carried out.

Crane collapse during lifting and Carry out trial lift prior to travel, never change the Safety Engineer/Erection
traveling position of the crane set up from the initial lift until Engineer/Surveyor/Crane
such time crane will reach its final destination. Operator/Rigger
Traveling distance should be compacted clear of any
obstruction and openings. Demarcate the travel
distance from starting point of the crawler crane to its
PICMW INC.4
JOB SAFETY ANALYSIS WORKSHEET

Country Office/ Project: JGC PENTHOUSE EXTENSION BLDG. Tools and / or Equipment Required: JSA No:

Job Location & Details: Erection of truss mobile crane, lifting accessories, Date Prepared:
scaffolding
JSA Participants: Approved by :

Responsible Supervisor:

Date:

JOB STEP HAZARDS IDENTIFIED RISK CONTROLS REQUIRED ACTION BY


final position. Crane set up factor of safety is to be
considered prior to travel.

Fall of assembled pipe truss All web slings, rope and shackles in place should be Safety Engineer/Erection
tested and certified capable to withstand the Engineer/Survey
maximum load it can carry and to consider the factor Engineer/Crane
of safety for the web sling or wire rope to be used. A Operator/Rigger
thorough survey of the location of the sling as per
rigging plan to lift the truss in a desired inclination
prior to travel.

Assembled pipe truss struck the Before reaching the temporary support the two Safety Engineer/Erection
erected temporary support. crawler crane will swing to the right at safe radius then Engineer/Crane
travel until such time it will be in a position to swing to Operator/Rigger
the left in inserting the truss to the temporary support.

Assembled pipe truss struck the Maintain the safe clearance of the suspended pipe Safety Engineer/Erection
working platform truss until such time reaches its final position. If the Engineer/Supervisor/Crane
load is directly over the connection shall then hoisted Operator
down the truss to connect its final position.
Assembled pipe truss struck the No other personnel other than the involved persons Safety Engineer/Erection
workers during erection are allowed to cross over the cordoned or barricaded Engineer/ Crane Operator
PICMW INC.5
JOB SAFETY ANALYSIS WORKSHEET

Country Office/ Project: JGC PENTHOUSE EXTENSION BLDG. Tools and / or Equipment Required: JSA No:

Job Location & Details: Erection of truss mobile crane, lifting accessories, Date Prepared:
scaffolding
JSA Participants: Approved by :

Responsible Supervisor:

Date:

JOB STEP HAZARDS IDENTIFIED RISK CONTROLS REQUIRED ACTION BY


area. During the heavy lift restricted access shall be
implemented in an area covering the lifting activities.

Unstable ground / uneven ground Ensure ground in good condition compacted and level Safety Engineer/Erection
surface prior to travel. Crane will travel without load to Engineer
test the stability of the ground if necessary.

Weather condition Wind monitoring device of crawler crane should be Crane Operator/Safety
calibrated and set up to its maximum requirements Engineer/ erection
which is 10 m/s. Engineer

4. Alignment and fit up to Crushing injury upon placement and Use of mechanical device for alignment such as tirfor, Erection
the embedment cement positioning of pins to embedment chain blocks, etc,. Engineer/Supervisor
structure. structure
Hazards associated with manual Materials or tools weighing more than the safe weight Supervisor/Workers
handling a worker can carry (25 kg) requires mechanical lifting
device.

Fall of tools and materials Fully boarded scaffolding wide enough for the group Erection Engineer/
of workers occupy the working platform during supervisor
alignment.

PICMW INC.6
JOB SAFETY ANALYSIS WORKSHEET

Country Office/ Project: JGC PENTHOUSE EXTENSION BLDG. Tools and / or Equipment Required: JSA No:

Job Location & Details: Erection of truss mobile crane, lifting accessories, Date Prepared:
scaffolding
JSA Participants: Approved by :

Responsible Supervisor:

Date:

JOB STEP HAZARDS IDENTIFIED RISK CONTROLS REQUIRED ACTION BY


5. Installation of tensile Fall of workers during installation Provide adequate working platforms during Erection
member to the erected installation, use of scaffolding, cherry picker, Engineer/Supervisor
truss ( first part ) telehandler which ever is applicable.

Tensile member collapse due to Never exceed the designed tensile force that will Erection
applied stress apply to the pipe truss. Follow the designed stress Engineer/Supervisor
that can support the truss.

Fall of tensile member during Ensure tensile member sling by competent rigger, Erection
installation properly in place Engineer/Supervisor

6. Tandem lift preparation Assemble pipe truss being attached to Thorough inspection of the assemble pipe truss such Safety Engineer/Erection
includes inspection of the temporary support prior to lift as obstructed scaffolding, pull or pushing devices Engineer/Supervisor
temporary support, connected to the assemble pipe truss and pin
positioning of lifting connecting system.
accessories and removal
of slings after erection Improper position of the shackles Thorough inspections of shackles position before Erection
(second part) erection shall be carried out by competent person. Engineer/supervisor

Unstable position of the slings. Slings in place properly avoid twisting position, slings Erection
to position in a right location base on the rigging plan Engineer/Supervisor

PICMW INC.7
JOB SAFETY ANALYSIS WORKSHEET

Country Office/ Project: JGC PENTHOUSE EXTENSION BLDG. Tools and / or Equipment Required: JSA No:

Job Location & Details: Erection of truss mobile crane, lifting accessories, Date Prepared:
scaffolding
JSA Participants: Approved by :

Responsible Supervisor:

Date:

JOB STEP HAZARDS IDENTIFIED RISK CONTROLS REQUIRED ACTION BY


Fall of workers upon placement of Telehandler, cherry picker and man basket which ever Supervisor/Operator/worke
lifting accessories is applicable to place, remove and realignment of sling rs
to its right position.

Crushing injury upon positioning of Use hand gloves, proper coordination between the Crane
lifting accessories rigger and operator upon hoisting up and down the Operator/Workers/rigger
crane.

7. Tandem lift utilizing the Crane collapse due to operators fault, Require competent operator and rigger to do lifting Safety Engineer/Erection
crane to lift and travel the mechanical fault, rigger and ground activities, should set up in firm and level ground Engineer/Crane Operator
assembled pipe truss condition for crane set up. surfaces prior to assemble.
(second part)
A toolbox talk shall be carried out to discuss the
relevant safety responsibility of the team member
during the erection process.

Crane operational and pre erection checklist to carry


out prior to installation to ensure safety relevant items
are complied and in placed
Incompetent rigger and operator Requires competent and certified crane operator Safety Engineer/Erection
having familiar and previous experiences in handling Engineer/Crane Operator/
such equipment. Capable to communicate verbal and Rigger
PICMW INC.8
JOB SAFETY ANALYSIS WORKSHEET

Country Office/ Project: JGC PENTHOUSE EXTENSION BLDG. Tools and / or Equipment Required: JSA No:

Job Location & Details: Erection of truss mobile crane, lifting accessories, Date Prepared:
scaffolding
JSA Participants: Approved by :

Responsible Supervisor:

Date:

JOB STEP HAZARDS IDENTIFIED RISK CONTROLS REQUIRED ACTION BY


hand signal to the rigger. Operator has the ability to
respond emergency situation if problem arises during
the lift. Operator should aware of the crawler crane
set up against the lifted load. If overloading sounded
stopped the lifting activity and inform to the concerned
personnel.

Poor communications Ensure fully charge, audible radio communication. Safety Engineer/Erection
Assign frequency for the erection team to avoid any Engineer/Supervisor/Crane
interference during heavy lift. To review the standard Operator/rigger
hand signal to operator and rigger does avoid
conflict/misinterpretation. If necessary turn off the
celphone during the heavy lift.

Crane collapse during lifting and Prior to travel conduct a trial lift and if safe to proceed Safety Engineer/Erection
traveling never change the position of the crane set up radius Engineer/Surveyor/Crane
from the initial lift until such time crane will reach its Operator/Rigger
final destination. Traveling distance should be
compacted clear of any obstructions, excavation
unwanted materials and openings. Demarcate the
travel distance from starting point of the crawler crane
to its final position. Crane set up factor of safety is to
PICMW INC.9
JOB SAFETY ANALYSIS WORKSHEET

Country Office/ Project: JGC PENTHOUSE EXTENSION BLDG. Tools and / or Equipment Required: JSA No:

Job Location & Details: Erection of truss mobile crane, lifting accessories, Date Prepared:
scaffolding
JSA Participants: Approved by :

Responsible Supervisor:

Date:

JOB STEP HAZARDS IDENTIFIED RISK CONTROLS REQUIRED ACTION BY


be considered prior to travel.
Fall of assemble pipe truss All web slings, rope and shackles in place should be Safety Engineer/Erection
tested and certified capable to withstand the Engineer/Survey
maximum load it can carry and to consider the factor Engineer/Crane
of safety for the web sling or wire rope to be used. A Operator/Rigger
thorough survey of the location of the sling as per
rigging plan to lift the truss in a desired inclination
prior to travel.

Assembled pipe truss struck the Before reaching the two temporary supports the truss Safety Engineer/Erection
erected temporary supports. shall be hoisted over the temporary supports at a safe Engineer/Crane
clearance prior to travel. The truss shall be hoisted Operator/Rigger
down once it is in right position over the towers.

Demarcate the position of the two crawler crane


wherein they will hoist up the truss before reaching
the temporary support. Maintaining the safe clearance
between the hook block to the tip of the boom which is
2 meters.

Assembled pipe truss struck the Maintain the safe clearance of the suspended pipe Safety Engineer/Erection
PICMW INC.10
JOB SAFETY ANALYSIS WORKSHEET

Country Office/ Project: JGC PENTHOUSE EXTENSION BLDG. Tools and / or Equipment Required: JSA No:

Job Location & Details: Erection of truss mobile crane, lifting accessories, Date Prepared:
scaffolding
JSA Participants: Approved by :

Responsible Supervisor:

Date:

JOB STEP HAZARDS IDENTIFIED RISK CONTROLS REQUIRED ACTION BY


working platform truss until such time reaches its final position. If the Engineer/Supervisor/Crane
load is directly over the connection shall then hoisted Operator
down the truss to connect its final position.

Assembled pipe truss struck the No other personnel other than the involve persons are Safety Engineer/Erection
workers during erection allowed to cross over the cordoned or barricaded Engineer/ Crane Operator
area. During the heavy lift restricted access shall be
implemented in an area covering the lifting activities.

Unstable ground/uneven ground Ensure ground in good condition compacted and level Safety Engineer/Erection
surface prior to travel. Crane will travel without load to Engineer
test the stability of the ground if necessary.

Weather condition Wind monitoring device of crawler crane should be set Crane Operator/Safety
up it maximum requirements which is 10 m/s. Engineer/ erection
Engineer
8. Alignment and fit up to Fall of workers Provisions of working platform such as fully boarded Safety Engineer/Erection
the column scaffolding, enough to occupy the workers during Engineer/Supervisor
alignment.
Pinch point between the pipe truss Keep your body parts away from crushing points Erection
and column connection. whenever alignment is being carried out, use of Engineer/Supervisor/Work
pulling and pushing device such as tirfor machine, ers
PICMW INC.11
JOB SAFETY ANALYSIS WORKSHEET

Country Office/ Project: JGC PENTHOUSE EXTENSION BLDG. Tools and / or Equipment Required: JSA No:

Job Location & Details: Erection of truss mobile crane, lifting accessories, Date Prepared:
scaffolding
JSA Participants: Approved by :

Responsible Supervisor:

Date:

JOB STEP HAZARDS IDENTIFIED RISK CONTROLS REQUIRED ACTION BY


chain block , etc.
Fall of pipe truss During alignment the pipe truss should be support by Erection Engineer/Safety
the crawler crane or temporary structure until such Engineer/Supervisor
time the tensile member were installed.

9. Alignment, fit up and Crushing injuries during fit up Keep your body parts away where crushing injury may Erection
full welding of truss (first occur especially the gap between the pipe edge Engineer/Supervisor
and second part) connection use of chain puller, tirfor machine and Workers
hydraulic clamp for alignment
Fall of workers Provisions of access and working platform on the Erection
supporting structure, fully boarded scaffolding, use of Engineer/Supervisor
full body harness when expose to open edges while workers/welders
working at height.

Fire Provisions of fire extinguishers, fire blanket and fire Safety Engineer/Erection
watcher within the welding activities to ensure no Engineer/Watchman
moldering object before leaving the welding area and
to secure hot work permit.

Flying particles Use of Personal Protective Equipment such as face Safety Engineer/workers
shields and safety glass, cutting goggles and welder
PICMW INC.12
JOB SAFETY ANALYSIS WORKSHEET

Country Office/ Project: JGC PENTHOUSE EXTENSION BLDG. Tools and / or Equipment Required: JSA No:

Job Location & Details: Erection of truss mobile crane, lifting accessories, Date Prepared:
scaffolding
JSA Participants: Approved by :

Responsible Supervisor:

Date:

JOB STEP HAZARDS IDENTIFIED RISK CONTROLS REQUIRED ACTION BY


mask.

10. Installation of tensile Fall of workers during installation Provisions of fully boarded scaffolding, adequate Safety engineer/Erection
member to the erected working platforms and access. Engineer
truss ( second part)
Tensile member collapse due to Follow the designed stress that can support the truss Erection Engineer/Safety
applied stress and improper never exceed the designed tensile force that will apply Engineer
connection to the pipe truss.

Fall of tensile member during Ensure tensile member sling by competent rigger, Erection Engineer/Safety
installation properly in place. Provide stopper to prevent sliding Engineer
during installation.
11. NDT works and paint Fall of persons Adequate working platform fully boarded with Safety Engineer/Erection
touch up guardrails erected and inspected by competent Engineer/Supervisor
scaffolding. Full body harness to tied up while working
at height

Inappropriate working platform Only tools that are necessary for NDT works should Safety Engineer/Erection
be carried at height. Engineer/Supervisor

Fall of NDT equipment and tools NDT job should not be carried out unless adequate Workers/Supervisor
working platform and access way is being provided.
PICMW INC.13
JOB SAFETY ANALYSIS WORKSHEET

Country Office/ Project: JGC PENTHOUSE EXTENSION BLDG. Tools and / or Equipment Required: JSA No:

Job Location & Details: Erection of truss mobile crane, lifting accessories, Date Prepared:
scaffolding
JSA Participants: Approved by :

Responsible Supervisor:

Date:

JOB STEP HAZARDS IDENTIFIED RISK CONTROLS REQUIRED ACTION BY

Chemical hazards Use of respirators if exposed directly to painting, No Workers/Supervisor


smoking while doing painting job.

Fall of persons Adequate working platform fully boarded with Workers/Supervisor


guardrails erected and inspected by competent
scaffolding. Full body harnesses to be tied off while
carry out painting job at height.

Painting adjacent to welding activities No painting job is to be carried out if it is near or Safety Engineer/
closed to hot work activities such as welding, grinding, Erection Engineer
cutting, etc,.

14

PICMW INC.14