LOCATION / PROJECT Dubai Islamic Bank Building, Al Nahda, Dubai UAE JOB NO. ASSESSMENT NO.
Deep Excavations Storage / Lay Down Area Fall from Height Fire Risk Noise Young Persons
Demolition Confined Spaces Slips / Tripping Noise / Dust / Vibration VDU Expectant Mothers
Plant / Machinery Working Platforms/Ladders Fuel Storage Fumes Ergonomics S/C Workers
Lifting Operations Manual Handling Storage / Lay Down Area Traffic High Winds General Public / Visitors
Buried / Overhead Services COSHH Ground Conditions Smoke Adverse Weather Others
WHO OR WHAT MIGHT BE EVALUATION OF RISK CONTROL MEASURES OR RECOVERY RESIDUAL RISK LEVEL
No. ACTIVITY POTENTIAL HAZARDS HAZARD EFFECT
HARMED MEASURES
S L R S L R
Revision
RISK ASSESSMENT
Date
LOCATION / PROJECT Dubai Islamic Bank Building, Al Nahda, Dubai UAE JOB NO. ASSESSMENT NO.
Deep Excavations Storage / Lay Down Area Fall from Height Fire Risk Noise Young Persons
Demolition Confined Spaces Slips / Tripping Noise / Dust / Vibration VDU Expectant Mothers
Plant / Machinery Working Platforms/Ladders Fuel Storage Fumes Ergonomics S/C Workers
Lifting Operations Manual Handling Storage / Lay Down Area Traffic High Winds General Public / Visitors
Buried / Overhead Services COSHH Ground Conditions Smoke Adverse Weather Others
WHO OR WHAT MIGHT BE EVALUATION OF RISK CONTROL MEASURES OR RECOVERY RESIDUAL RISK LEVEL
No. ACTIVITY POTENTIAL HAZARDS HAZARD EFFECT
HARMED MEASURES
S L R S L R
• Ensure Forklift has valid third party certificate and fit for the
purpose
• Ensure the operator should be certified by third party,
appointed is qualified and trained and with valid license and
visa
• Ensure when transporting load the fork should not raise more
Overturn, Collide Topple, struck by, crushed by than 8 inches from the ground and the load should be tilted
Incorrect Manual handling back.
Transporting of Busbars Untrained person Personal injury • Never carry loose or poorly stacked loads, loads to be
Work without supervision Fatality People engaged in the work secured properly
3 5 3 15 5 1 5
using Unavailability of banks man Property damage around the work area • Turn off the engine and remove the key when not in use.
forklift Unsecured load • Always park the forklift in a safe area and apply parking
Unstable ground brake. Always lower the forks until the fork flat on the floor.
• Never leave or park forklift on an incline area.
• Ensure daily inspection of forklifts have carried out prior to
commencement of work.
• Never put hands or legs in the lifting mechanism.
• Ensure the operator stay under the overhead guard
• Never take sharp/quick turns with raised load
• Avoid loose clothing, long sleeves, long hair, rings, chains and
Entanglement. Personel injury,Property damage Operator 3 3 9 3 1 3
bracelet while drilling.
Revision
RISK ASSESSMENT
Date
LOCATION / PROJECT Dubai Islamic Bank Building, Al Nahda, Dubai UAE JOB NO. ASSESSMENT NO.
Deep Excavations Storage / Lay Down Area Fall from Height Fire Risk Noise Young Persons
Demolition Confined Spaces Slips / Tripping Noise / Dust / Vibration VDU Expectant Mothers
Plant / Machinery Working Platforms/Ladders Fuel Storage Fumes Ergonomics S/C Workers
Lifting Operations Manual Handling Storage / Lay Down Area Traffic High Winds General Public / Visitors
Buried / Overhead Services COSHH Ground Conditions Smoke Adverse Weather Others
WHO OR WHAT MIGHT BE EVALUATION OF RISK CONTROL MEASURES OR RECOVERY RESIDUAL RISK LEVEL
No. ACTIVITY POTENTIAL HAZARDS HAZARD EFFECT
HARMED MEASURES
S L R S L R
Temporary hearing lose/noise impaired Operator and people around the work Ensure proper maintanance of drilling machine and use of
Noise 3 3 9 3 1 3
hearing lose area appropriate heariing protection
Operator and people around the work Proper ventillation should be availabe and appropriate dust
Dust Respiratory probelms 3 3 9 3 1 3
area mask.
7 Use of scaffolding
People engaged and around in the • Do not move with man/ material on top if using mobile
Pulling/ pushing scaffolding with man Personel injury,Fracture work,Supervisor 4 3 12 scaffolding. 4 1 4
Foreman,Engineer,Consultant
• Avoid loose clothing, long sleeves, long hair, rings, chains and
bracelet while drilling.
• Visual inspection to be done and ensure that casing, cable
and socket are in good condition.
• All power tools should be color coded and tagged.
People engaged and around in the
9 Use of electrical Power Tools Electrocution , cuts, abrasion, fire Heavy body injury 4 3 12 • Keep proper footing and balance while using power tools. 4 1 4
work,Supervisor Foreman
• Hold machine steady and avoid shaking machine.
• Do not use excessive pressure.
• Tool box talk/DSTI to be conducted on safe use of electrical
power tools.
Doc. Ref.
Revision
RISK ASSESSMENT
Date
LOCATION / PROJECT Dubai Islamic Bank Building, Al Nahda, Dubai UAE JOB NO. ASSESSMENT NO.
Deep Excavations Storage / Lay Down Area Fall from Height Fire Risk Noise Young Persons
Demolition Confined Spaces Slips / Tripping Noise / Dust / Vibration VDU Expectant Mothers
Plant / Machinery Working Platforms/Ladders Fuel Storage Fumes Ergonomics S/C Workers
Lifting Operations Manual Handling Storage / Lay Down Area Traffic High Winds General Public / Visitors
Buried / Overhead Services COSHH Ground Conditions Smoke Adverse Weather Others
WHO OR WHAT MIGHT BE EVALUATION OF RISK CONTROL MEASURES OR RECOVERY RESIDUAL RISK LEVEL
No. ACTIVITY POTENTIAL HAZARDS HAZARD EFFECT
HARMED MEASURES
S L R S L R
Worker and people around the work Ensure proper maintanance of drilling machine and use of
Fire Personel injury,Property damage 3 3 9 3 1 3
area appropriate heariing protection
10 House Keeping
FOLLOWING STEPS TO BE FOLLOWED WHILE EVALUATING THE HAZARDS AND RISK FOR EACH ACTIVITY.
SEVERITY OF CONSEQUENCES LIKELIHOOD / PROBABILITY HIERARCHY OF CONTROLS MATRIX
DESCRIPTION SCALE LIKELIHOOD / PROBABILITY SCALE SL. # DESCRIPTION If the severity rating lies between 12 to 25, then corrective actions needs to be taken by concerned persons with
FATALITY 5 CERTAIN 5 1 ELIMINATION documentary evidence
MAJOR INJURY / DAMAGE , DISABLING ILLNESS 4 VERY LIKELY 4 2 SUBSTITUTION LIKELIHOOD / PROBABILITY (L)
MINOR INJURY 3 LIKELY 3 3 ENGINEERING CONTROL 1 2 3 4 5
FIRST AID 2 UNLIKELY 2 4 SIGNAGE/WARNING/ADMIN. CONTROLS 1 1 2 3 4 5
SEVERITY
NEGLIGIBLE 1 VERY UNLIKELY 1 5 PPE'S 2 2 4 6 8 10
3 3 6 9 12 15
(S)
COLOUR CODE RISK LEVEL MEASURES TO BE TAKEN 4 4 8 12 16 20
RED EXTREME WORK CANNOT PROCEED, ENGINEERING MEASURES REQUIRED 5 5 10 15 20 25
ORANGE HIGH IMMEDIATE CORRECTION MEASURES REQUIRED R=SXL WHERE: R = RISK RATING
YELLOW MEDIUM REVIEW REQUIRED FOR ADDITIONAL MEASURES S = SEVERITY
WHITE LOW NO ACTION REQUIRED L = LIKELIHOOD / PROBABILITY
Final Assessment:
Provided that there are no deviations from control measures, the residual risk assumed is low. Supplementary measures should include using the correct PPE and safety Tool Box Talk to ensure that all Updated on:
workers are fully aware of the control measures.
Revision No.:
Assessed By (QA/QC OFFICER) Verified By (PROJECT ENGINEER) Approved By (CONSULTANT ENGINEER)